Subsections
8Much of the North American railroad network was built between about 1850 and 1920, when embankments were end-dumped from cars or wagons, sidehill fills were cast over the slope, and whatever came out of the nearest cut went into the fill. Ballast, cinders, ties and debris were added on top for a century after. These are non-engineered fills: built without specified materials, lift thickness or density control. They are usually serviceable because they have had a century to settle, but they are variable, they creep, and they respond badly to new load, new water and new excavation. This chapter covers their types, investigation, properties, settlement and design.
Apps
No apps yet for this chapter.