Primary References: Terzaghi, Peck and Mesri (1996); Holtz, Kovacs and Sheahan (2011); Mitchell and Soga (2005); Ladd (1991); Mesri and Godlewski (1977); Stark and Eid (1994, 1997); Skempton (1953, 1964); Chen (1988); Nelson and Miller (1992); Selig and Waters (1994); ASTM D2435, D4318, D4546, D4767, D6467.
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Values for clays (CL, CH) and clay minerals from the database. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 50.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 76.4 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Bulk (saturated) unit weight | Clay – unconsolidated muds | OH / CH | Natural | 101.9 | 105.1 | 108.2 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – unconsolidated muds | OH / CH | Natural | 57.3 | 63.6 | 70 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – soft, open-structured | CL-CH | Natural | 108.2 | 114.6 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – soft, open-structured | CL-CH | Natural | 70 | 79.5 | 89.1 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 114.6 | 127.3 | 140 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 82.8 | 101.9 | 121 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Glacial till (boulder clay) | CL / SC / GC | Natural | 127.3 | 140.1 | 152.8 | pcf | CB T3.1, p.79 |
| Dry unit weight | Glacial till (boulder clay) | CL / SC / GC | Natural | 108.2 | 124.1 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Tropical red clays | CL-MH | Natural | 108.2 | 120.9 | 133.7 | pcf | CB T3.1, p.79 |
| Dry unit weight | Tropical red clays | CL-MH | Natural | 82.8 | 98.7 | 114.6 | pcf | CB T3.1, p.79 |
| Specific gravity of solids | Most clay minerals | CL-CH | 2.67 | 2.7 | 2.73 | – | CB T3.1, p.79 | |
| Void ratio (natural) | Stiff clay | Natural state | 0.6 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Stiff clay | Natural state | 21 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Stiff clay | Natural state | 108 | pcf | DASP T3.2, p.76 | |||
| Void ratio (natural) | Soft clay | Natural state | 0.9 | 1.15 | 1.4 | – | DASP T3.2, p.76 | |
| Natural water content (saturated) | Soft clay | Natural state | 30 | 40 | 50 | % | DASP T3.2, p.76 | |
| Dry unit weight | Soft clay | Natural state | 73 | 83 | 93 | pcf | DASP T3.2, p.76 | |
| Void ratio (natural) | Soft organic clay | Natural state | 2.5 | 2.85 | 3.2 | – | DASP T3.2, p.76 | |
| Natural water content (saturated) | Soft organic clay | Natural state | 90 | 105 | 120 | % | DASP T3.2, p.76 | |
| Dry unit weight | Soft organic clay | Natural state | 38 | 44.5 | 51 | pcf | DASP T3.2, p.76 | |
| Saturated unit weight | Clay | 101.9 | 121 | 140 | pcf | BUDHU T4.1, p.71 | ||
| Dry unit weight | Clay | 89.1 | 111.4 | 133.7 | pcf | BUDHU T4.1, p.71 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Maximum dry unit weight | Gravel–sand, well graded, small clay content | GC | AASHTO T 99 | 117.8 | 122.5 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, well graded, small clay content | GC | AASHTO T 99 | 9 | 11.5 | 14 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, well graded, small clay content | SC | AASHTO T 99 | 108.2 | 117.8 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, well graded, small clay content | SC | AASHTO T 99 | 11 | 15 | 19 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Clays, low plasticity | CL | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Clays, low plasticity | CL | AASHTO T 99 | 12 | 18 | 24 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Clays, high plasticity | CH | AASHTO T 99 | 82.8 | 95.5 | 108.2 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Clays, high plasticity | CH | AASHTO T 99 | 19 | 27.5 | 36 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 66.8 | 84.3 | 101.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 21 | 33 | 45 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 111.4 | 124.2 | 136.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 9 | 13.5 | 18 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Plastic clay, sandy clay | A-6 | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Plastic clay, sandy clay | A-6 | AASHTO T 99 | 10 | 20 | 30 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Highly plastic or elastic clay | A-7 | AASHTO T 99 | 82.8 | 100.3 | 117.8 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Highly plastic or elastic clay | A-7 | AASHTO T 99 | 15 | 25 | 35 | % | CB T3.3, p.81 |
| Maximum dry unit weight (ASTM D698) | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 115 | 122.5 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 9 | 11.5 | 14 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 110 | 120 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 11 | 13 | 15 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 105 | 115 | 125 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 11 | 15 | 19 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 95 | 107.5 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 12 | 18 | 24 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 100 | 110 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 12 | 17 | 22 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Lean clay | CL | UFC 3-220-20 Table 3-1 | 95 | 107.5 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Lean clay | CL | UFC 3-220-20 Table 3-1 | 12 | 18 | 24 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Lean clay | CL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Fat clay | CH | UFC 3-220-20 Table 3-1 | 75 | 90 | 105 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Fat clay | CH | UFC 3-220-20 Table 3-1 | 19 | 27.5 | 36 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Fat clay | CH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Organic clays | OH | UFC 3-220-20 Table 3-1 | 65 | 82.5 | 100 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Organic clays | OH | UFC 3-220-20 Table 3-1 | 12 | 28.5 | 45 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Organic clays | OH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 6 t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 10 t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed vibratory 15 t | 20 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed padfoot 6 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Towed padfoot 10 t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 7 (3) t | 6 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 10 (5) t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 15 (10) t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled vibratory 8 (4) t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled padfoot 11 (7) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Self-propelled padfoot 15 (10) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 2 t | 4 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 7 t | 6 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 10 t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Vibratory tandem 13 t | 10 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Clay | Padfoot tandem 18 t | 24 | in | LOOK23 T7.8, p.223 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Plastic limit | Montmorillonite | Clay mineral | Ca²⁺ pore water | 65 | 72 | 79 | % | CB T8.2, p.178 |
| Liquid limit | Montmorillonite | Clay mineral | Ca²⁺ pore water | 123 | 150 | 177 | % | CB T8.2, p.178 |
| Plastic limit | Montmorillonite | Clay mineral | Na⁺ pore water | 86 | 91.5 | 97 | % | CB T8.2, p.178 |
| Liquid limit | Montmorillonite | Clay mineral | Na⁺ pore water | 280 | 490 | 700 | % | CB T8.2, p.178 |
| Plastic limit | Illite | Clay mineral | Ca²⁺ pore water | 36 | 39 | 42 | % | CB T8.2, p.178 |
| Liquid limit | Illite | Clay mineral | Ca²⁺ pore water | 69 | 84.5 | 100 | % | CB T8.2, p.178 |
| Plastic limit | Illite | Clay mineral | Na⁺ pore water | 34 | 37.5 | 41 | % | CB T8.2, p.178 |
| Liquid limit | Illite | Clay mineral | Na⁺ pore water | 61 | 68 | 75 | % | CB T8.2, p.178 |
| Plastic limit | Kaolinite | Clay mineral | Ca²⁺ pore water | 26 | 31 | 36 | % | CB T8.2, p.178 |
| Liquid limit | Kaolinite | Clay mineral | Ca²⁺ pore water | 34 | 53.5 | 73 | % | CB T8.2, p.178 |
| Plastic limit | Kaolinite | Clay mineral | Na⁺ pore water | 26 | 27 | 28 | % | CB T8.2, p.178 |
| Liquid limit | Kaolinite | Clay mineral | Na⁺ pore water | 29 | 40.5 | 52 | % | CB T8.2, p.178 |
| Liquid limit | Illites | Clay mineral | Plots parallel, just above A-line | 30 | 60 | 90 | % | LOOK T7.5, p.105 |
| Liquid limit | Kaolinites | Clay mineral | Plots at or just below A-line | 30 | 50 | 70 | % | LOOK T7.5, p.105 |
| Liquid limit | Montmorillonites | Clay mineral | Plots near U-line | 30 | % | LOOK T7.5, p.105 | ||
| Free swell | Sodium montmorillonite | Clay mineral | 1,400 | 1,500 | 1,600 | % | CB T8.1, p.178 | |
| Free swell | Calcium montmorillonite | Clay mineral | 65 | 107.5 | 150 | % | CB T8.1, p.178 | |
| Free swell | Illite | Clay mineral | 60 | 90 | 120 | % | CB T8.1, p.178 | |
| Free swell | Kaolinite | Clay mineral | 5 | 32.5 | 60 | % | CB T8.1, p.178 | |
| Plasticity index for swelling potential | Expansive clays | CL-CH | Low swell potential (Seed et al. 1962) | 0 | 7.5 | 15 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | Medium swell potential (Seed et al. 1962) | 10 | 20 | 30 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | High swell potential (Seed et al. 1962) | 20 | 37.5 | 55 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | Very high swell potential (Seed et al. 1962) | 40 | % | CB T8.4, p.180 | ||
| Plasticity index for expansion potential | Expansive clays | CL-CH | Very high (probable expansion >30% of volume) | 35 | % | CB T8.6, p.185 | ||
| Plasticity index for expansion potential | Expansive clays | CL-CH | High (probable expansion 20–30% of volume) | 25 | 33 | 41 | % | CB T8.6, p.185 |
| Plasticity index for expansion potential | Expansive clays | CL-CH | Medium (probable expansion 10–30% of volume) | 15 | 21.5 | 28 | % | CB T8.6, p.185 |
| Plasticity index for expansion potential | Expansive clays | CL-CH | Low (probable expansion <10% of volume) | 18 | % | CB T8.6, p.185 | ||
| Liquid limit | Kaolinite | Clay mineral | 35 | 67.5 | 100 | % | DASP T4.1, p.96 | |
| Plastic limit | Kaolinite | Clay mineral | 20 | 30 | 40 | % | DASP T4.1, p.96 | |
| Activity | Kaolinite | Clay mineral | 0.3 | 0.4 | 0.5 | – | DASP T4.1, p.96 | |
| Liquid limit | Illite | Clay mineral | 60 | 90 | 120 | % | DASP T4.1, p.96 | |
| Plastic limit | Illite | Clay mineral | 35 | 47.5 | 60 | % | DASP T4.1, p.96 | |
| Activity | Illite | Clay mineral | 0.5 | 0.85 | 1.2 | – | DASP T4.1, p.96 | |
| Liquid limit | Montmorillonite | Clay mineral | 100 | 500 | 900 | % | DASP T4.1, p.96 | |
| Plastic limit | Montmorillonite | Clay mineral | 50 | 75 | 100 | % | DASP T4.1, p.96 | |
| Activity | Montmorillonite | Clay mineral | 1.5 | 4.25 | 7 | – | DASP T4.1, p.96 | |
| Liquid limit | Clay | CL-CH | 40 | 95 | 150 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Clay | CL-CH | 25 | 37.5 | 50 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Clay | CL-CH | 15 | 57.5 | 100 | % | BUDHU T4.5, p.80 | |
| Liquid limit | Kaolinite | Clay mineral | 50 | 55 | 60 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Kaolinite | Clay mineral | 30 | 35 | 40 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Kaolinite | Clay mineral | 10 | 17.5 | 25 | % | BUDHU T4.5, p.80 | |
| Liquid limit | Illite | Clay mineral | 95 | 107.5 | 120 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Illite | Clay mineral | 50 | 55 | 60 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Illite | Clay mineral | 50 | 60 | 70 | % | BUDHU T4.5, p.80 | |
| Liquid limit | Montmorillonite | Clay mineral | 290 | 500 | 710 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Montmorillonite | Clay mineral | 50 | 75 | 100 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Montmorillonite | Clay mineral | 200 | 430 | 660 | % | BUDHU T4.5, p.80 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Undrained shear strength | Clay | CL-CH | Very soft | 251 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 251 | 386.5 | 522 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Firm | 522 | 783 | 1,044 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,044 | 1,566 | 2,088 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 2,088 | 3,132 | 4,177 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Hard | 4,177 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Very soft (N < 2) | 0.25 | tsf | IDOT T4.4.6.1.2-2, p.119 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Soft (N = 2–4) | 0.25 | 0.375 | 0.5 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Medium stiff (N = 4–8) | 0.5 | 0.75 | 1 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Stiff (N = 8–15) | 1 | 1.5 | 2 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Very stiff (N = 15–30) | 2 | 3 | 4 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Hard (N > 30) | 4 | 6 | 8 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| SPT N-value | Cohesive soil | CL-CH | Very soft | 0 | 0.5 | 1 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Soft | 2 | 3 | 4 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Medium stiff | 5 | 6.5 | 8 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Stiff | 9 | 12 | 15 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very stiff | 16 | 23 | 30 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Hard | 31 | 45.5 | 60 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very hard | 60 | blows/ft | GEC5 T23, p.137 | ||
| Undrained shear strength | Clay | CL-CH | Very soft | 418 | psf | CRAIG T4.1, p.121 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 418 | 626.5 | 835 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Firm | 835 | 1,200 | 1,566 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,566 | 2,350 | 3,133 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 3,133 | 4,700 | 6,266 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Hard | 6,266 | psf | CRAIG T4.1, p.121 | ||
| Presumed allowable bearing value (BS 8004) | Very stiff boulder clay and hard clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 6.3 | 9.4 | 12.5 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Stiff clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 3.1 | 4.7 | 6.3 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Firm clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 1.6 | 2.35 | 3.1 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Soft clay and silt | CL, CH, ML | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 1.6 | ksf | CURTIN T1.1, p.5 | ||
| Undrained strength of clay from hand-sample identification | Clay | Very soft | Extrudes between fingers | 420 | psf | ATKINSON T5.2, p.61 | ||
| Undrained strength of clay from hand-sample identification | Clay | Soft | Easily molded in fingers | 420 | 630 | 840 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Firm | Molded by strong finger pressure | 840 | 1,205 | 1,570 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Stiff | Cannot be molded in fingers | 1,570 | 1,830 | 2,090 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Very stiff | Can be indented by thumbnail | 3,130 | psf | ATKINSON T5.2, p.61 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Friction angle (compacted) | Clayey gravels | GC | Compacted to standard Proctor MDD | 31 | deg | CB T6.5, p.159 | ||
| Effective friction angle (compacted) | Clayey sands, sand–clay mix | SC | Compacted to standard Proctor MDD | 31 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Silts and clayey silts | ML | Compacted to standard Proctor MDD | 32 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Clays of low plasticity | CL | Compacted to standard Proctor MDD | 28 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Clayey silts, elastic silts | MH | Compacted to standard Proctor MDD | 25 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Clays of high plasticity | CH | Compacted to standard Proctor MDD | 19 | deg | CB T6.3, p.158 | ||
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Soft – organic | 104 | 156.5 | 209 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Soft – organic | 10 | 15 | 20 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 209 | 313.5 | 418 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 15 | 20 | 25 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Stiff | 418 | 731 | 1,044 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Stiff | 20 | 25 | 30 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Hard | 1,044 | 1,566 | 2,088 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Hard | 25 | 27.5 | 30 | deg | LOOK T7.9, p.107 |
| Undrained shear strength (compacted) | Clayey sands, sandy clay mix | SC | As compacted (standard Proctor MDD) | 1,566 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey sands, sandy clay mix | SC | Saturated after compaction | 209 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts and clayey silts | ML | As compacted (standard Proctor MDD) | 1,358 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts and clayey silts | ML | Saturated after compaction | 209 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clays of low plasticity | CL | As compacted (standard Proctor MDD) | 1,775 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clays of low plasticity | CL | Saturated after compaction | 313 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey silts, elastic silts | MH | As compacted (standard Proctor MDD) | 1,462 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey silts, elastic silts | MH | Saturated after compaction | 418 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clays of high plasticity | CH | As compacted (standard Proctor MDD) | 2,088 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clays of high plasticity | CH | Saturated after compaction | 209 | psf | CB T6.1, p.145 | ||
| Peak strength, overconsolidated clay joint infill | Overconsolidated clays | CH | Peak | c ≈ 3,759 psf; φ = 12–18° | LOOK T9.17, p.134 | |||
| Residual strength, overconsolidated clay | Overconsolidated clays | CH | Residual | 10 | 13 | 16 | deg | LOOK T9.17, p.134 |
| Critical-state friction angle | Clays | CL-CH | Critical state | 15 | 22.5 | 30 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Clays | CL-CH | Peak | 20 | 25 | 30 | deg | BUDHU T10.3, p.300 |
| Residual friction angle | Clays | CL-CH | Residual | 5 | 10 | 15 | deg | BUDHU T10.3, p.300 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Friction coefficient, mass concrete on soil/rock | Clean fine to medium sand, silty medium to coarse sand, silty or clayey gravel | 0.45 | 0.5 | 0.55 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Clean fine sand, silty or clayey fine to medium sand | 0.35 | 0.4 | 0.45 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Very stiff and hard residual or overconsolidated clay | 0.4 | 0.45 | 0.5 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Stiff clay and silty clay | 0.3 | 0.325 | 0.35 | – | CB T11.1, p.208 | ||
| Friction coefficient, steel sheet piles | Silty sand, gravel or sand mixed with silt or clay | 0.25 | – | CB T11.1, p.208 | ||||
| Adhesion, steel sheet piles | Soft clay and clayey silt | 104 | 365.5 | 627 | psf | CB T11.1, p.208 | ||
| Adhesion, steel sheet piles | Stiff and hard clay and clayey silt | 627 | 940 | 1,253 | psf | CB T11.1, p.208 | ||
| Friction coefficient, formed concrete / concrete sheet piling | Silty sand, gravel or sand mixed with silt or clay | 0.3 | – | CB T11.1, p.208 | ||||
| Adhesion, formed concrete / concrete sheet piling | Soft clay and clayey silt | 209 | 470 | 731 | psf | CB T11.1, p.208 | ||
| Adhesion, formed concrete / concrete sheet piling | Stiff and hard clay and clayey silt | 731 | 992 | 1,253 | psf | CB T11.1, p.208 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Young's modulus, short term (undrained) | Silt | ML-CH | Soft | 208.9 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Silt | ML-CH | Soft | 167.1 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Silt | ML-CH | Stiff | 208.9 | 313.3 | 417.7 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Silt | ML-CH | Stiff | 167.1 | 240.2 | 313.3 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Silt | ML-CH | Hard | 417.7 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Silt | ML-CH | Hard | 313.3 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Clay | ML-CH | Very soft | 62.7 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Clay | ML-CH | Very soft | 41.8 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Clay | ML-CH | Soft | 41.8 | 94 | 146.2 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Soft | 20.9 | 62.7 | 104.4 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Firm | 104.4 | 177.5 | 250.6 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Firm | 83.5 | 125.3 | 167.1 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Stiff | 208.9 | 365.5 | 522.1 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Stiff | 146.2 | 281.9 | 417.7 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Very stiff | 417.7 | 731 | 1,044 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Very stiff | 313.3 | 522.1 | 731 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Hard | 835.4 | 1,253 | 1,671 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Hard | 626.6 | 939.8 | 1,253 | ksf | LOOK T11.7, p.152 |
| Small-strain shear modulus | Soft clays | 57 | 172 | 287 | ksf | GEC5 T30, p.181 | ||
| Small-strain shear modulus | Firm clays | 144 | 432.5 | 721 | ksf | GEC5 T30, p.181 | ||
| Poisson's ratio, short term | Clay, low PI (<12%) | Short term | 0.35 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, long term | Clay, low PI (<12%) | Long term | 0.25 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, short term | Clay, medium PI (12–22%) | Short term | 0.4 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, long term | Clay, medium PI (12–22%) | Long term | 0.3 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, short term | Clay, high PI (22–32%) | Short term | 0.45 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, long term | Clay, high PI (22–32%) | Long term | 0.35 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, short term | Clay, extremely high PI (>32%) | Short term | 0.45 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio, long term | Clay, extremely high PI (>32%) | Long term | 0.4 | – | LOOK T11.17, p.157 | |||
| Poisson's ratio | Cohesive soil (settlement analysis) | CL-CH | 0.4 | – | USACE para. 3-9c, p.47 | |||
| Modulus of elasticity | Soft clay | 36 | 54 | 72 | ksf | DASP T11.4, p.319 | ||
| Modulus of elasticity | Hard clay | 122.4 | 205.2 | 288 | ksf | DASP T11.4, p.319 | ||
| Poisson's ratio | Soft clay | 0.15 | 0.2 | 0.25 | – | DASP T11.5, p.320 | ||
| Poisson's ratio | Medium clay | 0.2 | 0.35 | 0.5 | – | DASP T11.5, p.320 | ||
| Coefficient of subgrade reaction (1-ft plate) | Clayey sand | 110.5 | 202.6 | 294.7 | pci | ROB T9, p.84 | ||
| Coefficient of subgrade reaction (1-ft plate) | Clayey soil, su < 1,044 psf (50 kPa) | 36.8 | 55.2 | 73.7 | pci | ROB T9, p.84 | ||
| Coefficient of subgrade reaction (1-ft plate) | Clayey soil, su 1,044–2,089 psf (50–100 kPa) | 73.7 | 128.9 | 184.2 | pci | ROB T9, p.84 | ||
| Coefficient of subgrade reaction (1-ft plate) | Clayey soil, su > 2,089 psf (100 kPa) | 184.2 | pci | ROB T9, p.84 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of volume compressibility | Hard, heavily overconsolidated glacial till, stiff weathered rocks, hard clays | CL-CH / OH / Pt | Very low compressibility | 0.0024 | ft²/kip | CB T5.1, p.108 | ||
| Compression index | Hard, heavily overconsolidated glacial till, stiff weathered rocks, hard clays | CL-CH / OH / Pt | Very low compressibility | 0.025 | – | CB T5.1, p.108 | ||
| Coefficient of volume compressibility | Stiff glacial till, marls, very stiff tropical residual clays | CL-CH / OH / Pt | Low compressibility | 0.0024 | 0.0036 | 0.0048 | ft²/kip | CB T5.1, p.108 |
| Compression index | Stiff glacial till, marls, very stiff tropical residual clays | CL-CH / OH / Pt | Low compressibility | 0.025 | 0.0375 | 0.05 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Firm clays, glacial outwash clays, lake deposits, NC clays at depth | CL-CH / OH / Pt | Medium compressibility | 0.0048 | 0.0096 | 0.0144 | ft²/kip | CB T5.1, p.108 |
| Compression index | Firm clays, glacial outwash clays, lake deposits, NC clays at depth | CL-CH / OH / Pt | Medium compressibility | 0.05 | 0.1 | 0.15 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Poorly consolidated alluvial clays (estuarine), sensitive clays | CL-CH / OH / Pt | High compressibility | 0.0144 | 0.0431 | 0.0718 | ft²/kip | CB T5.1, p.108 |
| Compression index | Poorly consolidated alluvial clays (estuarine), sensitive clays | CL-CH / OH / Pt | High compressibility | 0.15 | 0.45 | 0.75 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Highly organic alluvial clays and peats | CL-CH / OH / Pt | Very high compressibility | 0.0718 | ft²/kip | CB T5.1, p.108 | ||
| Compression index | Highly organic alluvial clays and peats | CL-CH / OH / Pt | Very high compressibility | 0.75 | 2.875 | 5 | – | CB T5.1, p.108 |
| Recompression index | Clays | CL-CH | 0.015 | 0.1825 | 0.35 | – | CB T5.1 text, p.108 | |
| Secondary compression ratio | Clay | 0.025 | 0.055 | 0.085 | – | USACE T3-14, p.79 | ||
| Secondary compression ratio | Organic clays and silts | ML-MH | 0.04 | 0.05 | 0.06 | – | CB T5.4, p.117 | |
| Secondary compression ratio | San Francisco Bay mud | CL | 0.04 | 0.05 | 0.06 | – | CB T5.4, p.117 | |
| Secondary compression ratio | Sensitive clay, Portland ME | CL-CH | 0.025 | 0.04 | 0.055 | – | CB T5.4, p.117 | |
| Coefficient of consolidation | Low plasticity clays | CL | 32.29 | 118.4 | 204.5 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Low plasticity glacial lake clays | CL | 21.53 | 26.9 | 32.29 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Low plasticity mud | CL | 6.46 | 9.7 | 12.92 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Medium plasticity clays | CL-CH | 9.69 | ft²/yr | CB T5.3, p.114 | |||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – virgin compression | 1,292 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – virgin compression | 538.2 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – virgin compression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – virgin compression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – virgin compression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – virgin compression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – virgin compression | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – virgin compression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – virgin compression | 9.69 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – recompression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – recompression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – recompression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – recompression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – recompression | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – recompression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – recompression | 8.61 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – recompression | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – recompression | 5.38 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Remolded | 43.06 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Remolded | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Remolded | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Remolded | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Remolded | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Remolded | 4.31 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Remolded | 3.77 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Remolded | 3.23 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Remolded | 2.69 | ft²/yr | LOOK T8.14, p.122 | ||
| Overconsolidation ratio | Clays | CL-CH | Normally consolidated | 1 | 1.25 | 1.5 | – | LOOK T7.10, p.108 |
| Overconsolidation ratio | Clays | CL-CH | Lightly overconsolidated | 1.5 | 2.75 | 4 | – | LOOK T7.10, p.108 |
| Overconsolidation ratio | Clays | CL-CH | Heavily overconsolidated | 4 | – | LOOK T7.10, p.108 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of permeability | Gravel, clayey | GC | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, clayey | SC | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic clay, low plasticity | CL | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic clay, high plasticity | CH | 1.0×10⁻⁸ | 1.0×10⁻⁷ | 1.0×10⁻⁶ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, low plasticity | OL | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, high plasticity | OH | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Silty and clayey sands | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Compacted clay | 1.0×10⁻⁷ | cm/s | CB T4.1, p.97 | ||||
| Capillary rise | Clay | k ≈ 10⁻⁶ cm/s | 32.8 | 49.2 | 65.6 | ft | LOOK T7.20, p.113 | |
| Hydraulic conductivity | Silty clay | Saturated | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Clay | Saturated | 1.0×10⁻⁶ | cm/s | DASP T7.1, p.181 | |||
| Capillary rise | Clay | 25 | 50 | 75 | ft | DASP T9.2, p.262 | ||
| Coefficient of permeability by grain size | Clay | 1.0×10⁻⁶ | cm/s | ATKINSON T6.2, p.78 | ||||
| Typical height of capillary rise | Clay | 79 | 118 | 157 | in | LOOK23 T4.1, p.98 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| California bearing ratio (soaked, design) | Sands, silty or clayey | SM, SC | Drainage: Good | 10 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Sands, silty or clayey | SM, SC | Drainage: Poor | 7 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Inorganic silts (high plasticity) and clays | MH, CL, CH | Drainage: Good | 3 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Inorganic silts (high plasticity) and clays | MH, CL, CH | Drainage: Poor | 3 | % | LOOK T13.9, p.183 | ||
| California bearing ratio | Heavy clay | PI = 70; water table >2 ft below formation | 2 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 70; water table <2 ft below formation | 1 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 60; water table >2 ft below formation | 2 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 60; water table <2 ft below formation | 1.5 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 50; water table >2 ft below formation | 2.5 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 50; water table <2 ft below formation | 2 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 40; water table >2 ft below formation | 3 | % | CB T7.2, p.166 | |||
| California bearing ratio | Heavy clay | PI = 40; water table <2 ft below formation | 2 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 30; water table >2 ft below formation | 5 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 30; water table <2 ft below formation | 3 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 20; water table >2 ft below formation | 6 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 20; water table <2 ft below formation | 4 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 10; water table >2 ft below formation | 7 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 10; water table <2 ft below formation | 5 | % | CB T7.2, p.166 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Frost susceptibility group | Gravelly soils with >20% finer than 0.02 mm; sands (except silty fine sands) with >15% finer; clays with PI > 12; varved clays with uniform conditions | F3 | F3 | CB T9.2, p.197 | ||||
| Frost susceptibility group | Silts, including sandy silts; fine silty sands with >15% finer than 0.02 mm; lean clays with PI < 12; varved clays with non-uniform conditions | F4 | F4 | CB T9.2, p.197 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Natural water content (saturated) | Stiff clay | Saturated, natural | 20 | % | DAS T2-3, p.12 | |||
| Natural water content (saturated) | Soft clay | Saturated, natural | 30 | 40 | 50 | % | DAS T2-3, p.12 | |
| Natural water content (saturated) | Soft organic clay | Saturated, natural | 80 | 105 | 130 | % | DAS T2-3, p.12 | |
| Specific gravity of soil solids | Silts | ML-MH | 2.65 | 2.675 | 2.7 | – | DAS T3-1, p.14 | |
| Specific gravity of soil solids | Clay and silty clay | CL-CH | 2.67 | 2.785 | 2.9 | – | DAS T3-1, p.14 | |
| Plasticity index of clay mineral | Kaolinite | Clay mineral | 20 | 30 | 40 | % | DAS ch. 7 comments, p.45 | |
| Plasticity index of clay mineral | Illite | Clay mineral | 35 | 42.5 | 50 | % | DAS ch. 7 comments, p.45 | |
| Plasticity index of clay mineral | Montmorillonite | Clay mineral | 50 | 75 | 100 | % | DAS ch. 7 comments, p.45 | |
| Pore pressure parameter at failure | Clays with high sensitivity | CL-CH | Triaxial (CU with pore pressure) | 0.75 | 1.125 | 1.5 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Normally consolidated clays | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.75 | 1 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Overconsolidated clays | CL-CH | Triaxial (CU with pore pressure) | -0.5 | -0.25 | 0 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Compacted sandy clay | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.625 | 0.75 | – | DAS ch. 18 comments, p.134 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very low expansion potential | 0 | 10 | 20 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Low expansion potential | 21 | 35.5 | 50 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Medium expansion potential | 51 | 70.5 | 90 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | High expansion potential | 91 | 110.5 | 130 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very high expansion potential | 130 | – | D4829-19 T1, p.2 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Soil behavior type index | Organic soils – clay | SBT zone 2 | 3.6 | – | ROB Fig. 22, p.35 | |||
| Permeability from soil behavior type | Organic soils – clay | SBT zone 2 | 1.0×10⁻⁸ | 1.0×10⁻⁷ | 1.0×10⁻⁶ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Organic soils – clay | SBT zone 2 | 1 | – | ROB T5, p.41 | |||
| Soil behavior type index | Clays – silty clay to clay | SBT zone 3 | 2.95 | 3.275 | 3.6 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Clays – silty clay to clay | SBT zone 3 | 1.0×10⁻⁸ | 3.2×10⁻⁸ | 1.0×10⁻⁷ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Clays – silty clay to clay | SBT zone 3 | 1.5 | – | ROB T5, p.41 | |||
| Soil behavior type index | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 2.6 | 2.775 | 2.95 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 3.0×10⁻⁷ | 1.7×10⁻⁶ | 1.0×10⁻⁵ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 2 | – | ROB T5, p.41 | |||
| Permeability from soil behavior type | Very stiff sand to clayey sand (OC or cemented) | SBT zone 8 | 1.0×10⁻⁶ | 3.2×10⁻⁴ | 1.0×10⁻¹ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Very stiff sand to clayey sand (OC or cemented) | SBT zone 8 | 5 | – | ROB T5, p.41 | |||
| Permeability anisotropy kh/kv | Soft clay – No or slightly developed macrofabric, essentially homogeneous | CL-CH | 1 | 1.25 | 1.5 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Fairly to well-developed macrofabric (discontinuous permeable lenses) | CL-CH | 2 | 3 | 4 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Varved clays and deposits with continuous permeable layers | CL-CH | 3 | 9 | 15 | – | ROB T7, p.57 | |
| Cone factor for undrained strength | Clays | CL-CH | su = (qt − σvo)/Nkt | 10 | 14 | 18 | – | ROB text, p.43 |
| OCR factor k in OCR = k·Qt | Clays | CL-CH | Kulhawy & Mayne (1990) | 0.2 | 0.33 | 0.5 | – | ROB text, p.46 |
| Assumed effective friction angle | Clays | CL-CH | Small to medium projects without triaxial data | 28 | deg | ROB text, p.49 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Cumulative plastic strain coefficient a | Fat clay | CH | Li & Selig (1996) model | 0.82 | 1.2 | 1.5 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent b | Fat clay | CH | Li & Selig (1996) model | 0.12 | 0.18 | 0.27 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent m | Fat clay | CH | Li & Selig (1996) model | 1.3 | 2.4 | 3.9 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain coefficient a | Lean clay | CL | Li & Selig (1996) model | 0.3 | 1.1 | 3.5 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent b | Lean clay | CL | Li & Selig (1996) model | 0.08 | 0.16 | 0.34 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent m | Lean clay | CL | Li & Selig (1996) model | 1 | 2 | 2.6 | – | LI16 T4.7, p.174 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 10 | 0.685 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 10 | 0.958 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 20 | 0.606 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 20 | 0.878 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 30 | 0.535 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 30 | 0.816 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 40 | 0.472 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 40 | 0.772 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 50 | 0.417 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 50 | 0.746 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter a | Fine-grained soil | PI = 60 | 0.37 | – | CASTELLANOS T6.4 / Eq. 6.15, p.184 | |||
| Fully softened strength envelope τ/pa = a (σ'/pa)^b – parameter b | Fine-grained soil | PI = 60 | 0.738 | – | CASTELLANOS T6.4 / Eq. 6.16, p.184 |
| Estimate | Correlation | Limits / notes | Source |
|---|---|---|---|
| Fully softened strength from PI (curved envelope) | τFS/pa = a (σ'n/pa)^b; a = 0.00004 PI² – 0.0091 PI + 0.7716; b = 0.00009 PI² – 0.0107 PI + 1.0561 | pa = 2,116 psf; σ(a) = 0.0247, σ(b) = 0.0407 (mean – 1σ ≈ 16% chance of lower value) | CASTELLANOS Eq. 6.15–6.16, p.184 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Clays are fine-grained soils whose behavior is controlled by clay minerals: plate-shaped particles finer than about 0.00008 in. with large surface areas and electrical charges that bind water. Clays are classified CL (lean) or CH (fat) under the USCS, and they dominate the subgrade, embankment and cut-slope problems of many railroad lines.
The engineering problems come from five properties:
This chapter gives typical values, correlations and equations for clays, and the screening and design steps for each problem. Use Appendix D for first-pass values from blow counts and Atterberg limits.
| Deposit | Typical setting | Characteristic behavior |
|---|---|---|
| Soft alluvial and estuarine clay | River crossings, coastal lines, bridge approaches | Normally consolidated, low strength, large and slow settlement; undrained failure under new fill |
| Glacial lake and marine clay | Great Lakes basin, northern plains, St. Lawrence valley, eastern Canada | Varved or sensitive; quick clays prone to retrogressive flow slides along valleys |
| Glacial till (lean clay matrix) | Northern U.S. and Canada | Stiff, overconsolidated, with cobbles and boulders; generally good foundation; perched water in sand lenses |
| Overconsolidated and fissured clays and clay shales | Plains and Gulf coast (for example Pierre, Bearpaw, Yazoo, Taylor and Eagle Ford formations) | Strength loss with time in cuts; expansive; progressive and reactivated landslides |
| Expansive residual and alluvial clays | Texas, Colorado, the Dakotas, the southeast Gulf coast and the prairies | Seasonal heave and shrinkage; track geometry defects; cracking of structures |
| Residual clay over rock | Piedmont, Appalachians, karst regions | Variable thickness over pinnacled rock; may hide voids in karst |
| Clay fill | Older embankments built from the nearest cut | Variable density; softening and shoulder failures; ballast pockets |
On an operating railroad, clay problems usually appear first as recurring track surface and alignment defects: soft track that will not hold surface, ballast pockets, bulging shoulders, slow slides in cuts after wet years, or seasonal heave in a dry year followed by a wet one. Chapter 2.3, Section 2.3.5 describes the subgrade failure modes and Chapter 3.8, Section 3.8.3 the slope mechanisms.
Clays plot on or above the A-line on the Casagrande plasticity chart: CL for LL < 50 and CH for LL ≥ 50 (ASTM D2487). Soils with 4 ≤ PI ≤ 7 above the A-line are CL-ML and often behave like silt (Chapter 2.4).
Eq. 2.5-1
The activity (Skempton 1953) relates plasticity to the amount of clay-size material and indicates the clay mineral:
Eq. 2.5-2 (Skempton 1953)
| Mineral | Activity, A | Typical LL | Typical PI | Swell potential | Residual φ′r (deg) |
|---|---|---|---|---|---|
| Kaolinite | 0.3–0.5 | 30–110 | 25–40 | Low | 12–18 |
| Illite | 0.5–1.3 | 60–120 | 35–60 | Low to moderate | 8–12 |
| Ca-montmorillonite (smectite) | 1.5 | 100–200 | 50–120 | High | 5–8 |
| Na-montmorillonite (smectite) | 4–7 | 300–700 | 250–650 | Very high | 4–6 |
Ranges compiled from Mitchell and Soga (2005) and Holtz, Kovacs and Sheahan (2011) for pure minerals; natural clays are mixtures and fall between these values.
| Activity | Class | Meaning |
|---|---|---|
| < 0.75 | Inactive | Kaolinite or illite-rich; low volume change |
| 0.75–1.25 | Normal | Mixed mineralogy |
| > 1.25 | Active | Smectite-rich; check for swell and low residual strength |
Clay has no to slow dilatancy, medium to very high dry strength and medium to high toughness. Fat clay (CH) feels sticky and greasy and dries to hard lumps that cannot be crushed with the fingers. Record the consistency (very soft to hard) from the thumb test or a pocket penetrometer on every sample.
| Property | Soft CL/CH (normally consolidated) | Stiff CL (overconsolidated) | CH (fat clay) | Glacial till (CL matrix) | Sensitive glacial marine clay |
|---|---|---|---|---|---|
| Liquid limit, LL | 30–80 | 25–45 | 50–100 | 20–35 | 30–60 |
| Plasticity index, PI | 12–50 | 10–25 | 30–70 | 8–18 | 10–30 |
| Natural water content, w (%) | 30–70 (near or above LL) | 15–25 (near PL) | 25–60 | 8–15 | 40–80 (above LL) |
| Liquidity index, LI | 0.6–1.2 | 0–0.3 | 0.1–0.8 | < 0.2 | 1.0–2.5 |
| Total unit weight, γ (pcf) | 95–115 | 120–130 | 100–120 | 130–145 | 95–110 |
| Void ratio, e | 0.9–2.0 | 0.4–0.7 | 0.7–1.6 | 0.2–0.4 | 1.0–2.2 |
| Specific gravity, Gs | 2.65–2.80 | 2.68–2.75 | 2.70–2.80 | 2.68–2.75 | 2.70–2.80 |
| Permeability, k (ft/day) | 0.00003–0.003 | 0.00003–0.003 (higher through fissures) | 0.000003–0.0003 | 0.0003–0.03 (sand lenses higher) | 0.0003–0.003 |
| USACE frost group | F3 (PI > 12) or F4 (PI < 12) | F3 (PI > 12) or F4 (PI < 12) | F3 | F2–F3 | F4 (varved) |
Ranges compiled from Holtz, Kovacs and Sheahan (2011), Terzaghi, Peck and Mesri (1996), Kulhawy and Mayne (1990) and USACE EM 1110-3-138.
Moisture content relative to the Atterberg limits is the quickest indicator of clay condition: a clay with w near or above its liquid limit is soft and normally consolidated (or sensitive); a clay with w near its plastic limit is stiff and overconsolidated or desiccated. The liquidity index (LI = (w − PL)/PI) and its relation to strength are given in Appendix D, Section D.4.
For rapid loading of saturated clay (embankment construction, train loading, end-of-construction cut slopes), stability is controlled by the undrained shear strength su. su is not a single property: it depends on the stress history, the mode of shear and the rate of loading.
Eq. 2.5-3 (σ′p from consolidation tests, or from CPTu after Mayne)
Eq. 2.5-4 (Ladd and Foott 1974; Ladd 1991)
Where:
Eq. 2.5-5 (fit by Morris and Williams 1994 to Bjerrum 1972; μ ≈ 1.0 at PI = 20 and 0.83 at PI = 40)
| Parameter | Typical value | Notes |
|---|---|---|
| su/σ′v0, normally consolidated (DSS) | 0.20–0.25 | Mesri (1975): su/σ′p ≈ 0.22 for field-vane-corrected strength |
| su/σ′p from PI | 0.11 + 0.0037 PI | Skempton (1957); normally consolidated clays |
| Sensitivity, St = su/su,remolded | 2–4 most clays; 4–16 sensitive to extra-sensitive; > 16 quick | Quick clays occur mainly in glacial marine deposits of eastern Canada and Scandinavia |
| Undrained modulus, Eu/su | 200–500 (CL); 100–300 (CH) | Duncan and Buchignani (1976); lower at high OCR and high PI |
| Rate effect | +5% to +10% per log cycle of strain rate | Rapid train loading sees higher su than slow fill placement |
For long-term stability of cut slopes and embankments, use effective-stress strength. Stiff, overconsolidated and fissured clays lose strength in cuts and compacted fills over years to decades, as swelling and weathering break down their structure. That is why many clay cut slopes stand for decades and then fail without any obvious trigger.
| Strength | Where it applies | How to obtain it |
|---|---|---|
| Peak (c′, φ′) | Intact, unweathered clay that has not been unloaded or softened; first-time analyses of new fills in lean clay | CU triaxial with pore pressure (ASTM D4767) or direct shear (D3080) on undisturbed samples |
| Fully softened (c′ ≈ 0, φ′fs) | Cut slopes in stiff clay; compacted clay embankments; any slope where the clay has been through wetting and drying cycles | Direct shear or triaxial on normally consolidated reconstituted samples; torsional ring shear (ASTM D7608); Stark correlations |
| Residual (c′ = 0, φ′r) | Slip surfaces of previous slides; bedding shears in clay shale; reactivated landslides | Torsional ring shear (ASTM D6467); repeated direct shear; Stark correlations |
Eq. 2.5-6 (Bjerrum and Simons 1960; peak, normally consolidated)
| Liquid limit | Clay fraction (%) | Peak φ′ (deg) | Fully softened φ′fs (deg) | Residual φ′r (deg) |
|---|---|---|---|---|
| 30–40 | < 20 | 30–34 | 30–33 | 24–32 |
| 40–60 | 25–45 | 26–30 | 24–30 | 15–24 |
| 60–100 | > 50 | 22–26 | 18–25 | 9–16 |
| 100–200 (smectitic clay shale) | > 50 | 18–22 | 12–18 | 5–9 |
Fully softened and residual ranges after Stark and Eid (1994, 1997) and Stark, Choi and McCone (2005), for effective normal stress of about 1,000 to 4,000 psf. Both envelopes are curved: at the low normal stresses of shallow slides the secant angle is higher than at 4,000 psf. Use the stress-dependent envelope, not one angle, for shallow failures.
For railroad cut slopes in stiff clay and clay shale, design long-term stability with fully softened strength and c′ = 0, and analyze any slope with past movement using residual strength along the existing slip surface. See Chapter 6.3, Section 6.3.6.
| Parameter | Soft CL | Soft CH | Stiff CL (OC) | Sensitive clay |
|---|---|---|---|---|
| Compression ratio, Cc/(1 + e0) | 0.10–0.20 | 0.15–0.30 | 0.05–0.12 (beyond σ′p) | 0.2–0.5 (beyond σ′p) |
| Recompression ratio, Cr/(1 + e0) | 0.01–0.03 | 0.02–0.05 | 0.005–0.02 | 0.005–0.02 |
| Coefficient of consolidation, cv (ft2/day) | 0.1–1 | 0.02–0.3 | 0.3–3 | 0.05–0.5 |
| Cα/Cc | 0.04 ± 0.01 | 0.04 ± 0.01 | 0.04 ± 0.01 | 0.025–0.035 |
After Terzaghi, Peck and Mesri (1996), Mesri and Godlewski (1977) and Holtz, Kovacs and Sheahan (2011). cv from laboratory tests is often lower than field values, where sand seams and fissures shorten drainage paths.
Eq. 2.5-7 (Terzaghi and Peck 1967; Koppula 1981)
Eq. 2.5-8
Eq. 2.5-9 (Tv = 0.197 at 50% and 0.848 at 90% consolidation)
Knowing the preconsolidation stress matters more than any other parameter: the worked example in Section 2.5.12 shows a lightly overconsolidated clay settling about half as much as the same clay assumed normally consolidated. Measure σ′p with consolidation tests (ASTM D2435 or D4186) on high-quality samples; sample disturbance flattens the curve and hides σ′p. See Chapter 6.2, Sections 6.2.4 to 6.2.6.
Placing fill on soft clay loads it faster than it can drain, so the critical condition is usually at the end of construction, using undrained strength. For a quick check of a wide fill on uniform soft clay:
Eq. 2.5-10 (bearing capacity of a strip load on undrained clay)









Track that keeps settling over soft clay is usually treated with ballast, and that works when the cause is consolidation, because consolidation slows down with time. A conference paper on very weak subgrade points out that the same symptom can come from a different mechanism: bearing-capacity (shear) failure of the clay under the embankment. Then the settlement rate does not slow, and each lift of ballast adds weight that drives the failure further. The paper's working rule is that a steady leveling effort, such as a carload of ballast every month, will not be cured by more surfacing. Telling the two apart early saves years of maintenance.
| Compression (consolidation) | Displacement (bearing failure) | |
|---|---|---|
| Rate with time | Falls; approaches equilibrium | Steady or increasing |
| Effect of added ballast | Small extra settlement, then levels off | Adds driving load; can accelerate movement |
| Field signs | Uniform sag; no heave | Bulging or heave at the toe or shoulder, ditch distortion |
| Remedies | Time, surcharge, drains | Toe berm (buttress); compaction or permeation grouting; sheet piles or other reinforcement, usually at least 25 ft long |
Equation 2.5-13. Bearing check for an embankment on soft clay (strip, φ = 0)
su = undrained shear strength; γH = embankment pressure; q = track and train load spread to the base of the embankment.
The calculator converts ballast deliveries to an equivalent settlement over the affected length, computes the rate in each period, and compares the last third of the record with the first. A ratio below 0.7 is read as consolidation and 0.7 or more as displacement. These thresholds are a screening choice, not a published criterion. The diagnosis should be confirmed with survey points, an inclinometer at the toe and piezometers before a remedy is chosen.
| Record | Rate first third / last third | Diagnosis | Bearing FS |
|---|---|---|---|
| About one 30-cu-yd car per month over 1,000 ft | 8.33 in./yr / 8.33 in./yr | Rate steady: consistent with bearing-capacity displacement | 0.95 (su 400 psf, 8 ft fill) |
| Surveyed settlement 1.2, 0.8, 0.6 ... 0.2 in. per quarter | 4.00 in./yr / 0.90 in./yr | Rate falling: consistent with consolidation (compression) |
The first site settles at a constant rate on clay whose bearing factor of safety is below one; more ballast will not fix it. A toe berm is often the cheapest remedy where right-of-way and wetland permits allow; grouting or sheet piles work from within the right-of-way. The second site is consolidating and should level off.
Open the settlement diagnosis calculator →
Settlement rate from surfacing or survey records, trend classification, and the bearing factor of safety of the embankment on soft clay.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads are not named.
Soft clay may not carry a new embankment or siding fill placed all at once, but it gains strength as it consolidates under each lift. Duncan, Wright and Brandon devote a chapter to this. The critical moments are the ends of the fast placement periods, when pore pressures are highest. The factor of safety then rises during each pause as the pressures dissipate. They cite Polish test fills that, built in stages, safely reached twice the thickness the original strength would allow, and later twice that again before failing. They also show the reverse: where consolidation during construction is ignored, an analysis can call for staging or drains that are not needed. For a first estimate, their bearing capacity screen F = 5.53 su/(γH) gives the height each stage can reach. The strength gained after each pause is the undrained strength ratio times the effective stress actually gained.






Equation 2.5-14. Stage height and strength gain
su(t) = su0 + (su/σ′v) Σ Δσi U(t − ti); su/σ′v = 0.11 + 0.0037PI (Das) or from CU tests
| Approach | Steps | Notes |
|---|---|---|
| Effective stress | Get c′ and φ′ from drained or CU tests; estimate undrained excess pore pressures; compute dissipation during construction; analyze the ends of the fast placement periods | Depends on predicting pore pressures, which is difficult; field piezometers are essential |
| Total stress (undrained strength) | Estimate the strength gain from consolidation and the strength ratio; analyze each stage with the increased undrained strength | Matches how failure would actually occur (undrained); the approach used in this calculator |
The profession does not agree on which approach is better (Ladd, 1991). Either way, the critical times are the ends of the fast placement periods.
A 25 ft embankment is to go over 30 ft of soft clay with su = 400 psf, PI = 30 (strength ratio 0.221), cv = 0.15 and ch = 0.30 ft²/day, and a required factor of 1.3 at the end of each stage. The initial strength carries only 13.6 ft. With wick drains at 6 ft, a first lift to 13.6 ft and a 90-day wait add enough strength to finish in 2 stages, by about day 120. Without drains, 90-day waits stall short of the final height. Waits of a year are needed, and the embankment takes 775 days. Drains, a lighter fill, or reinforcement are the alternatives to time.
Open the staged construction calculator →
Stage heights from the 5.53 su screen, strength gain from consolidation of each lift (vertical and, with wick drains, radial), the number of stages and the time to reach the final height.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Clays rich in smectite take up water between their mineral layers and swell; they shrink when they dry. Under track, the seasonal cycle causes heave in wet seasons, shrinkage and longitudinal cracking of the embankment shoulders in dry seasons, and recurring surface and cross-level defects. Damage is greatest where moisture changes unevenly: at the edges of embankments, near trees, at culverts and at transitions between cut and fill.
| Percent passing No. 200 | Liquid limit | SPT N (blows/ft) | Probable expansion (%) | Swelling pressure (ksf) | Degree of expansion |
|---|---|---|---|---|---|
| > 95 | > 60 | > 30 | > 10 | > 20 | Very high |
| 60–95 | 40–60 | 20–30 | 3–10 | 5–20 | High |
| 30–60 | 30–40 | 10–20 | 1–5 | 3–5 | Medium |
| < 30 | < 30 | < 10 | < 1 | < 1 | Low |
Probable expansion is the total volume change from air-dry to saturated under 1 ksf. Index classification is a screen only.
Eq. 2.5-11 (Seed, Woodward and Lundgren 1962; compacted soils at optimum moisture under 1 psi surcharge)
Eq. 2.5-11 gives about 3% swell at PI = 20, 9% at PI = 30, 23% at PI = 45 and 47% at PI = 60. It overestimates swell of natural undisturbed clays; use it to rank soils, then measure swell with ASTM D4546 (one-dimensional swell or collapse) under the design overburden.
Eq. 2.5-12 (oedometer method; σ′sw = swelling pressure, σ′f = final vertical stress, Cs = swell index)


Clay subgrade failures under track develop in stages (Selig and Waters 1994; Chapter 2.3, Section 2.3.5):
| Mode | Mechanism | Signs | Remedies |
|---|---|---|---|
| Progressive shear failure | Repeated wheel loads exceed the strength of wet clay just below the subballast | Heaving of the shoulder; ballast in the ditch line; recurring surface defects | Thicker granular layer; improve drainage; lime or cement stabilization |
| Excessive plastic deformation (ballast pocket) | Accumulated permanent strain forms a trough that traps water and ballast | Water-filled pockets of ballast found when trenching across the track; soft spots | Drain the pocket (lateral drains through the shoulder); undercut and rebuild with a blanket layer |
| Subgrade attrition and mud pumping | Wet clay surface abrades and slurries under ballast or subballast and is pumped upward | Fines and mud at the ballast surface; white or gray stains on ties | Sand blanket or geotextile separation; restore drainage |
| Consolidation settlement | Clay foundation under new or raised fill continues to consolidate | Long, smooth dips over soft ground | Surcharge, wick drains, lightweight fill |
| Shrink and swell | Seasonal moisture change in expansive clay | Seasonal cross-level and surface variation; shoulder cracking | Section 2.5.8 |
Design the granular layer thickness above clay subgrade so that the deviator stress at the subgrade is well below its strength under repeated loading (Chapter 2.3, Section 2.3.4). Soaked CBR of CL is typically 3 to 8 and of CH 1 to 5 (Chapter 7.3, Section 7.3.2).
| Hazard | Recognition | Engineering response |
|---|---|---|
| Sensitive and quick clay | St > 8; LI > 1; low salt content in marine clay; history of flow slides along the valley | Avoid unloading the toe or cutting into slopes; check retrogressive flow-slide potential; restrict vibration and pile driving |
| Dispersive clay | Tunnels, jug holes and gullies after first rains; cloudy water in ditches | Crumb (ASTM D6572), double hydrometer (D4221) and pinhole (D4647) tests; filters and lime treatment |
| Desiccation cracks and fissures | Polygonal cracks at the surface; slickensided fissures in samples | Mass strength lower than small-sample strength; water enters cracks and adds pressure at the back of slides |
| Frost in clay | PI > 12 clays are F3; lean clays with PI < 12 and varved clays are F4 | Frost protection depth per Chapter 7.3, Section 7.3.5 |
| Clay over karst | Sinkholes, closed depressions, pinnacled rock | Geophysics and probing; see Chapter 2.7 |
| Eq. | Quantity | Expression | Use and limits |
|---|---|---|---|
| 21-1 | A-line | PI = 0.73(LL − 20) | Clays plot above |
| 21-2 | Activity | A = PI / % finer than 2 µm size | Mineral indicator |
| 21-3 | OCR; σ′p from CPTu | σ′p ≈ 0.33(qt − σv0) | Intact clays; calibrate |
| 21-4 | SHANSEP | su/σ′v0 = S · OCRm | S ≈ 0.22, m ≈ 0.8 |
| 21-5 | Vane correction | μ = 1.7 − 0.54 log(PI) | After Bjerrum (1972) |
| 21-6 | Peak φ′ from PI | sin φ′ = 0.8 − 0.094 ln(PI) | NC clays |
| 21-7 | Compression index | Cc = 0.009(LL − 10); 0.01 wn | ±30% |
| 21-8 | OC settlement | S = H/(1+e0)[Cr log(σ′p/σ′v0) + Cc log(σ′f/σ′p)] | σ′f > σ′p |
| 21-9 | Time rate; secondary | t = TvHdr2/cv; Ss = CαH log(t/tp)/(1+ep) | — |
| 21-10 | Embankment height on soft clay | Hmax = 5.14 su/(γ FS) | Wide fill, uniform clay |
| 21-11 | Swell potential | S = 2.16×10−3 PI2.44 (%) | Compacted soils; screening |
| 21-12 | Heave | ΔH = Σ CsH log(σ′sw/σ′f)/(1+e0) | Active zone only |
A siding embankment is to be built on soft clay. Before any detailed analysis, the undrained bearing capacity of a strip load gives the height the clay can carry in one placement at the end of construction, which is when an embankment on soft clay is weakest.
| Variable | Value | Description |
|---|---|---|
| su | 400 psf | Field-vane-corrected undrained strength, fairly uniform with depth |
| γ | 125 pcf | Fill unit weight |
| FS | 1.3 | Required end-of-construction factor of safety |
| Nc | 5.14 | Bearing capacity factor, strip load, φ = 0 |
The clay can carry about 12.7 ft of fill in one stage at FS = 1.3.
A 16-ft embankment would need staged construction (Section 2.5.7.2), berms or ground improvement. The screen ignores the crust, the strength increase with depth and the actual side slopes, so confirm it with a limit-equilibrium analysis of the real geometry and strength profile (Section 6.3.3).
The settlement of a clay depends strongly on where the new stress sits relative to the preconsolidation stress. Below it the clay is stiff (recompression index); above it the clay is soft (compression index). This example shows how much the measured preconsolidation stress changes the answer.
| Variable | Value | Description |
|---|---|---|
| H | 12 ft, drained top and bottom | Clay layer |
| e0 | 1.05 | Initial void ratio |
| Cc, Cr | 0.45 and 0.06 | Compression and recompression indices |
| cv | 0.5 ft²/day | Coefficient of consolidation |
| σ′v0 | 1,200 psf | Effective stress at mid-layer |
| σ′p | 1,800 psf (OCR = 1.5) | Preconsolidation stress |
| Δσ | 1,500 psf | Stress increase from new fill |
Settlement 6.3 in., 90% complete in about 61 days. Assuming the clay normally consolidated would give 11.1 in.
Measuring the preconsolidation stress nearly halves the estimate. That is the strongest argument for consolidation tests on undisturbed samples: a correlation for Cc alone would have missed the stiff recompression range entirely. With drainage at both faces the settlement is largely complete within one construction season.
A cut for a new connecting track exposes high-plasticity clay. Before swell tests are run, three screens are used to decide whether the clay should be treated as expansive: activity, the Chen classification from index data and blow count, and the Seed et al. swell estimate.
| Variable | Value | Description |
|---|---|---|
| Soil | CH | Exposed in the cut |
| LL, PI | 68 and 45 | Atterberg limits |
| F | 97% | Passing the No. 200 sieve |
| CF | 52% | Clay fraction, finer than 2 μm |
| N | 22 | SPT blow count |
| Chen (1988) | Fines > 95%, LL > 60, N 20 to 30: high to very high expansion | Classification table (Section 2.5.9) |
Activity 0.87 (normal), but Chen rates the clay high to very high and the Seed et al. estimate is about 23% swell. Treat it as highly expansive.
Normal activity does not clear a clay with a PI of 45: the amount of clay matters as much as its mineral. Run ASTM D4546 swell tests at the design overburden, test for sulfates before choosing lime, and plan lime stabilization of the top 12 to 18 in. of subgrade with shoulder moisture control. Do not use this CH as embankment fill near the subgrade surface.
| Clay and condition | N60 | w (%) | LL | γ (pcf) | su (psf) | φ′ peak / fully softened / residual (deg) | Cc/(1+e0) | cv (ft2/day) |
|---|---|---|---|---|---|---|---|---|
| Soft CL, normally consolidated | 0–4 | 30–45 | 30–45 | 105–115 | 200–500 | 30 / 28 / 22 | 0.10–0.20 | 0.1–1 |
| Soft CH, normally consolidated | 0–3 | 45–80 | 55–90 | 95–110 | 150–400 | 24 / 22 / 12 | 0.15–0.30 | 0.02–0.3 |
| Stiff CL, overconsolidated | 9–20 | 16–25 | 30–45 | 120–130 | 1,000–2,500 | 30 / 28 / 22 | 0.05–0.10 | 0.3–3 |
| Stiff fissured CH or clay shale | 15–40 | 20–35 | 60–120 | 115–125 | 2,000–6,000 (mass lower) | 24 / 18 / 8 | 0.05–0.12 | 0.05–0.5 |
| Glacial till, CL matrix | 20–60 | 8–15 | 20–35 | 130–145 | 3,000–8,000 | 34 / 32 / 28 | 0.02–0.05 | 1–10 |
| Sensitive glacial marine clay | 0–5 | 40–80 | 30–60 | 95–110 | 300–1,000 (remolded < 100) | 28 / 26 / 20 | 0.2–0.5 | 0.05–0.5 |
| Compacted clay fill | 8–20 | 15–25 | 30–60 | 115–125 | 1,000–3,000 | 28 / 24 / 14 | 0.03–0.08 | — |
Starting values only; replace with test data. See Appendix D for the sources and limitations of correlation-based values.
Checklist · Part X · Problem Soils
A clay sample from the cut slope of a Class I railroad has the Atterberg limits, water content and clay fraction shown. The engineer must classify the clay, compute its activity and liquidity index, and say what they suggest about the clay’s history and behavior in the cut.
Three index properties that together say what kind of clay this is and what state it is in.
| Variable | Value | Description |
|---|---|---|
| LL, PL | 52 and 24 | Atterberg limits |
| wn | 30% | Natural water content |
| CF | 40% | Finer than 2 μm |
CH (fat clay); activity 0.70; liquidity index 0.21.
A water content this close to the plastic limit suggests the clay is overconsolidated or desiccated. It will be stiff in its present state but can soften if it gets wetter, which matters for cut slopes and subgrades exposed to water (Question 2.5-3).
A Class I railroad embankment over normally consolidated clay is to be raised. Field vane tests gave the strength shown at a depth where the effective stress is known. The engineer must find the design undrained strength for the stability analysis and check it against a SHANSEP estimate.
Field vane tests in plastic clays overestimate the strength that is mobilized in an embankment failure. Bjerrum’s correction reduces the vane value; SHANSEP gives an independent estimate from the effective stress.
| Variable | Value | Description |
|---|---|---|
| PI | 40 | Plasticity index |
| su,VST | 600 psf | Field vane strength |
| σ′v0 | 2,500 psf | Effective stress at the test depth |
| OCR | 1.0 | Normally consolidated |
| S | 0.22 | SHANSEP strength ratio |
Design su ≈ 500 psf. SHANSEP gives 550 psf, within 10%.
Two independent methods agreeing within 10% is good confirmation. Use the lower, vane-based value for design; the agreement shows the vane results are not disturbed or affected by sand layers.
A cut in stiff fissured clay on a Class I railroad stood for 40 years and then failed onto the track. The railroad needs a repair design and asks why the original cut failed. The engineer must say which drained strength the original design should have used and which the repair must use.
A reasoning question about the three drained strengths of a stiff clay: peak, fully softened and residual. Each applies to a different stage in the life of a slope.
| Variable | Value | Description |
|---|---|---|
| Soil | Stiff fissured clay; LL = 75, clay fraction 55% | High plasticity |
| History | The cut stood 40 years, then failed | Delayed failure |
| Strengths | Fully softened about 18° to 25°; residual about 9° to 16° (c′ = 0) | Table 2.5-7 |
No equation is needed; the answer follows from the criteria listed under Given.
The original design should have used the fully softened strength (about 18° to 25°, c′ = 0). The repair must use the residual strength on the existing slip surface (about 9° to 16°).
The 40-year delay is typical of cuts in stiff plastic clay and is the reason peak strengths are not used for permanent cuts. Once a slip surface exists, it does not regain strength, so a repair that assumes the fully softened strength will fail again on the same surface.
| Topic | Refer To |
|---|---|
| Track subgrade failure modes and blanket layers | Chapter 2.3, Sections 2.3.4–2.3.5 |
| Slope failure mechanisms | Chapter 3.8, Section 3.8.3 |
| CPTu and field vane testing | Chapter 5.1, Sections 5.1.2–5.1.3 |
| Classification and Atterberg limits | Chapter 2.2, Section 2.2.3 |
| Consolidation settlement and time rate | Chapter 6.2, Sections 6.2.4–6.2.8 |
| Residual strength and progressive failure | Chapter 6.3, Section 6.3.6 |
| Wick drains, DSM, lime and cement stabilization | Chapter 7.2, Sections 7.2.3–7.2.7 |
| Silts | Chapter 2.4 |
| Peats and organic soils | Chapter 2.6 |
| Typical values from blow counts and Atterberg limits | Appendix D |
Many clay embankments on older main lines were built by tipping clay from wagons onto the natural ground with no systematic compaction. The fill was unsaturated when placed, so it settled heavily when rain soaked it, and the settlement was made up over decades with locomotive ash and ballast. These “dumped” fills behave differently from both the parent clay and a modern compacted fill (O'Brien, 2013, pp. 19–21).
| Fill | Moisture content (%) | Liquid limit (%) | Plasticity index (%) | Clay fraction (%) | Sand and gravel (%) |
|---|---|---|---|---|---|
| Gault Clay fill | 24.9 (SD 3.3) | 57.4 (SD 10.9) | 34.1 (SD 9.1) | 30–60 | 5–40 |
| London Clay fill | 25.1 (SD 5.0) | 53.8 (SD 12.5) | 33.0 (SD 9.7) | 25–50 | 10–40 |
| London Clay fill, six metro sites | 26.5–35.8 | 67.7–74.4 | 42.7–49.4 | 50–70 | 0–15 |
After O'Brien (2013), Table 2, p. 22. SD = standard deviation. Published research data; no client sites are identified.
Monitoring of instrumented embankments shows that climate and vegetation, not train loading, drive most of the movement of high-plasticity clay fill:
Each wet season pushes the slope out further than the dry season pulls it back. This “ratcheting” accumulates plastic strain near the toe, the clay there softens past its peak strength, and a slip surface grows back toward the crest. Numerical models of these fills reproduce the coat-hanger shape and the delayed, deep failure through the crest (O'Brien, 2013, pp. 25–28; McGinnity and Saffari, 2012, p. 1071). In the models the clay was given peak strength until about 0.2 in. (5 mm) of plastic displacement, post-rupture strength after that, and residual strength after about 4 in. (100 mm) (O'Brien, 2013, p. 30). Fills with permeability in an intermediate range let enough winter rain in to raise pore pressure and are the most prone to delayed failure (Chapter 6.4, Section 6.4.12).
The two mechanisms pull against each other. Large trees on the slope keep it dry and suppress delayed failure but cause the summer track movement; clearing them stops the track movement but can let the fill wet up and start a winter failure. Vegetation management on a clay embankment is therefore a stability decision, not only a maintenance one.
A 16-ft clay embankment on an older main line has a 1.5H:1V side slope with mature oaks on the lower half and grass above. Track geometry records show a dip that deepens every August and recovers partly each spring. The fill is a brown clay with LL = 58 and PI = 34; there is no record of compaction.
| Variable | Value | Description |
|---|---|---|
| H | 16 ft | Embankment height |
| β | 33.7° (1.5H:1V) | Side slope angle |
| LL, PI | 58, 34 | Index properties of the fill |
| Vegetation | Oaks on lower half, grass above | High-water-demand trees on the slope |
| Track record | Dip deepens each August | Seasonal geometry defect |
The fill and the August dip match the pattern in the UK monitoring: summer drying by high-water-demand trees settles the crest and the track follows it. A conventional analysis with a hydrostatic water table would call a 33.7° slope in this clay unstable, so it cannot explain the observed behaviour and should not drive the decision.
Do not clear the oaks as a first step. Removing them stops the summer drying but can wet the fill and start outward movement or a delayed failure the following winter. Install inclinometers and pore pressure or suction sensors, read them through at least one dry and one wet season, and plan any clearance in stages with monitoring (Chapter 5.3).
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.
Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.