Most soil mechanics was developed for transported soils: clays, silts and sands laid down by water, ice or wind. Residual soils formed in place by the weathering of rock, and soils in arid climates, follow different rules. Their strength comes partly from relict rock structure or cementation, their properties change gradually with depth rather than at layer boundaries, and their behavior depends heavily on moisture. In North America the most important residual soils are the saprolites of the Piedmont and Blue Ridge, and the most important arid soils are those of the Southwest and Great Basin.
This chapter groups three soil families that share one lesson: the standard correlations between index properties, blow counts and engineering parameters were not derived for them and should be used with caution. Residual soils carry inherited structure from the parent rock; tropical soils add intense chemical weathering; arid soils add cementation, desiccation and salts. Each is described below with its railroad implications.
A residual profile grades from soil at the surface to fresh rock at depth, with no sharp boundary. Practice in the southeastern United States uses a small number of zones defined largely by SPT resistance and the presence of relict structure.
| Zone | Description | Typical SPT N (bpf) | Excavation |
|---|---|---|---|
| Residual soil | Completely weathered; no relict structure; often red to brown sandy clay or clayey silt | 4 to 15 | Common excavation |
| Saprolite | Weathered in place; relict foliation, veins and joints visible; micaceous sandy silt or silty sand | 10 to 60, increasing with depth | Common excavation |
| Partially weathered rock (PWR) | Transition zone of soil-like and rock-like material | ≥ 100 bpf (sampler advance ≤ 6 in. per 50 blows) | Ripping or light blasting |
| Weathered to fresh rock | Rock core recovery; RQD increases with depth | Auger refusal | Blasting |
The depth to each zone varies sharply over short distances, following the parent rock's mineralogy and jointing: boulders of fresh rock can sit in saprolite, and deep weathered slots can cut into rock. Borings define the profile at points only; rippability and refusal depths should be presented as ranges, and geophysics (seismic refraction or MASW) is useful between borings.
Intense weathering in hot, wet climates produces laterites (iron- and aluminum-rich soils that can harden on exposure into ironstone), halloysite and allophane clays with very high natural water content but good strength, and black cotton soils (highly expansive montmorillonite clays) in seasonally wet-dry areas. Their natural water contents and liquid limits can look alarming while the soil performs well, and drying in the laboratory changes their properties irreversibly. Classification tests on tropical soils should be run without oven drying the sample first, and the drying method reported. These soils are rare on mainland North American railroads but matter for work in the Caribbean, Central America, Hawaii and the Pacific islands.
| Feature | Description | Significance |
|---|---|---|
| Caliche (calcrete) | Calcium carbonate cemented layers near the surface, from weak nodules to hard rock-like caps | High strength and hard excavation when dry; can mask loose or collapsible soil beneath; variable thickness |
| Desiccated crusts | Dry, stiff, fissured upper clays | Overstate strength in summer; swell and soften on wetting |
| Collapsible fans and debris flows | Loose, dry, clay-bonded silts and sands | Collapse on wetting (Chapter 2.9) |
| Sabkha and salt flats | Saline, often loose and soft, with crusts of salt and gypsum | Dissolution, corrosion, sulfate attack, very low strength when wet |
| Expansive clays | Clays that remain dry most of the year | Large seasonal and wetting-induced heave (Chapter 2.5) |
| Flash flooding | Ephemeral washes with intense short storms | Scour of culverts and bridge foundations; debris flows |
In arid ground the controlling variable is water, and water usually comes from the railroad: a culvert that concentrates flow, a ditch that ponds, or irrigation or development beside the corridor. The same soil that has supported track for decades can collapse, swell or dissolve when water is introduced, so drainage design is as important as foundation design. Erosion and scour in washes are covered with the hydraulic hazards in Chapter 1.1.
A new rail cut 400 ft long and 26 ft deep at its centerline is planned in Piedmont saprolite. The control boring shows residual soil and saprolite to 22 ft, PWR (N ≥ 100 bpf) from 22 to 30 ft and auger refusal at 30 ft. For a first quantity split, the cut is idealized as a 60-ft-wide prism (the side slopes are handled separately).
| Variable | Value | Description |
|---|---|---|
| L × B | 400 ft × 60 ft = 24,000 sq ft | Plan area of the idealized cut |
| Soil and saprolite | 0 to 22 ft | Common excavation |
| PWR | 22 to 30 ft | N ≥ 100 bpf; ripping or light blasting |
| Cut depth | 26 ft | Bottom of cut is in PWR |
| Conversion | 27 cf = 1 cy | Cubic feet to cubic yards |
At the control boring the idealized cut contains about 19,600 cy of common excavation and 3,600 cy of PWR, with refusal 4 ft below grade.
A single boring cannot carry these quantities: in Piedmont terrain the PWR and refusal surfaces can rise or fall 10 ft or more within a few tens of feet. Additional borings along the cut, or a seismic refraction line along the centerline, are needed before quantities are bid, and the bid items should include a unit price for rock in case refusal rises into the cut.
The report should state the PWR definition used (N ≥ 100 bpf) so that the contractor can relate the quantities to equipment: PWR in this definition can often be ripped with a large dozer, while material below refusal generally needs blasting.
Related chapters in this manual:
Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.