↑ Parent Menu⌂ Main Menu
← Railway Ground Hazard Risk Management
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

Chapter 2.9 — Collapsible Soils: Identification, Testing and Railroad Impacts

Dry, low-density soils that hold their shape until they get wet, then lose volume suddenly under the load they already carry.
Author: Daniel P. Colwell

Collapsible soils are a quiet hazard. They stand in near-vertical cuts, give high blow counts when dry and carry an embankment for decades, then settle inches in days when a culvert leaks, a ditch ponds or a wet year raises the water table. This chapter covers where they come from, how to screen and test them, how to estimate collapse settlement, and what a railroad can do about them. Loess is treated in detail in the silts chapter; this chapter covers collapse as a behavior across all the soil types that show it.

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
2.9.0 Purpose and Overview

A collapsible soil is a partly saturated soil with an open structure of grains held together at their contacts by clay bridges, carbonate or salt cement, or capillary suction. While the soil stays dry those bonds carry the load. Wetting dissolves or softens the bonds, the grains slide into the open pores, and the soil compresses with no added load. The volume change is fast (hours to weeks), it is mostly irreversible, and it happens only where the water goes, so it is almost always differential.

For a railroad the importance is that wetting is usually caused by the railroad itself: a blocked ditch, a leaking or undersized culvert, a new drainage outfall, a pond formed against a new embankment, or irrigation on adjacent land. A collapsible foundation that has been stable for a century can start to move the year drainage changes. The chapter therefore treats collapse as a trigger problem as much as a soil problem.

2.9.1 Where Collapsible Soils Are Found

Collapse needs three things: a loose, open structure; low natural moisture; and bonding that is sensitive to water. These conditions come from a small number of depositional settings, which makes the desktop study the most efficient screening tool.

Table 2.9-1. Depositional settings that produce collapsible soils
SettingTypical soilBondingWhere in North America
Wind-blown (eolian) siltLoess: ML, CL-MLClay coatings, carbonateMissouri, Mississippi and Ohio valley bluffs; Palouse; central plains
Alluvial fans and debris flowsSilty and clayey sands, gravelly siltsClay bridges, salts, rapid depositionDesert Southwest, Great Basin, foothills of the Rockies
ColluviumMixed silty and clayey sand with rock fragmentsClay, low densityFoot of steep slopes in arid and semi-arid areas
Residual soilsLeached silty sands and sandy siltsRelict iron and clay bondsPiedmont, some granite terrains (see Chapter 2.13)
Volcanic ash and pumiceSilt-size ashWeak cementPacific Northwest, Intermountain West
Dry-placed or poorly compacted fillAny silt or clayey sand placed dry of optimumSuction onlyOld embankments and widenings (see Chapter 2.10)

Collapse is a function of moisture as well as soil type. A loess bluff in a wet climate may be close to saturated and no longer collapsible, while the same deposit a few hundred miles west is dry and highly collapsible. Climate maps and the natural moisture content measured in borings are as important as the geology map.

2.9.2 Field Recognition

In the field, suspect collapse when several of these are seen together:

  • Low dry density, typically below about 90 pcf for silts and 100 pcf for sandy soils, with pinhole voids or root holes visible in a cut face.
  • Near-vertical cuts that stand for years but slake and slump quickly where water runs over them.
  • High SPT blow counts in dry soil that drop sharply below the water table or in wet borings, and drilling fluid lost into the formation.
  • Settlement concentrated around culverts, ditch inlets, ponds and other places water collects, with tension cracks parallel to the track.
  • Piping holes and small sinks in fine soils on the face of an embankment or cut (also a sign of dispersive soil; see Chapter 2.5).
  • Track geometry defects that recur at the same culvert or drainage feature after wet periods rather than after heavy traffic.

A hand penetrometer or pocket vane reading taken on a dry block and again after the block is soaked for an hour is a cheap field indicator: a large drop in strength on wetting points to water-sensitive bonding.

2.9.3 Screening Criteria

Screening criteria use index properties to decide which samples go to collapse testing. None of them predicts the amount of collapse; they flag soils that need testing.

wsat = γw / γd − 1 / Gs(Eq. 2.9-1)
Moisture content at full saturation for the natural dry unit weight. Gibbs criterion: if wsat > LL the soil can collapse to a density at which, saturated, it is wetter than its liquid limit.
S = w Gs / e(Eq. 2.9-2)
Degree of saturation. Collapse is rarely significant above about S = 60 to 70%.
Table 2.9-2. Screening indicators
IndicatorSuggests collapse whenNotes
Gibbs criterion (Eq. 2.9-1)wsat > LLBest for loess and silty soils
Dry unit weightγd < about 90 pcf (silts), 100 pcf (sands)Rule of thumb only
Degree of saturation (Eq. 2.9-2)S < about 60%Natural moisture from samples sealed in the field
Fines content10 to 40% clay-size bonding fines in a silt or sandClean sands rarely collapse; fat clays swell instead
Field soak testLarge strength loss after wettingQualitative

Use undisturbed samples for natural moisture and density. Split-spoon samples are disturbed and usually overstate density in loose collapsible soil; thin-walled tubes or block samples from test pits are preferred (see Chapter 4.1).

2.9.4 Laboratory Testing

The standard test is a one-dimensional collapse test in the oedometer (ASTM D5333, withdrawn 2012; collapse is now measured with D4546-21 for the collapse index, ASTM D4546 for one-dimensional swell or collapse). An undisturbed specimen at natural moisture is loaded in steps to a vertical stress, then flooded, and the change in height on flooding is recorded.

Ic (%) = 100 (e1 − e2) / (1 + e0) = 100 ΔH / H0(Eq. 2.9-3)
Collapse index at 2 tsf (ASTM D5333, withdrawn 2012; collapse is now measured with D4546-21). e0 = initial void ratio; e1, e2 = void ratio just before and after wetting.
Table 2.9-3. Degree of collapse from the collapse index (ASTM D5333, withdrawn 2012; collapse is now measured with D4546-21)
Ic at 2 tsf (%)Degree of collapse
0None
0.1 to 2.0Slight
2.1 to 6.0Moderate
6.1 to 10.0Moderately severe
> 10Severe

The collapse index is a classification at a fixed stress. For design, run the test at the actual stress in the layer (overburden plus embankment and train load), or run a double oedometer test: one specimen loaded at natural moisture and one soaked first, giving the collapse strain at any stress as the difference between the two curves. Collapse strain usually rises with stress to a peak and then falls, so a test at 2 tsf can under- or over-state collapse in a shallow layer under a low embankment.

2.9.5 Estimating Collapse Settlement
Sc = Σ εc,i Hi(Eq. 2.9-4)
εc,i = collapse strain of layer i at its design stress; Hi = thickness of the layer that will be wetted.

The hardest judgment is not the strain but the thickness that will actually get wet. A leaking culvert wets a bulb of soil a few feet to tens of feet across; a rising water table wets everything below it; surface ponding wets a front that advances slowly downward. Estimate a wetted zone for each credible water source and compute settlement for each, rather than assuming the whole profile wets at once. The difference between the wetted and dry zones is the differential settlement that the track will see.

Collapse settlement also adds to, rather than replaces, ordinary consolidation and creep. For new embankments on collapsible ground, check both: settlement under the new load at natural moisture, and the additional collapse if the foundation later wets (see Chapter 6.2).

2.9.6 Railroad Impacts and Risk Rating

Collapse shows up on a railroad as localized sags, twist and cross-level defects at drainage features, cracking and slumping of embankment shoulders, and loss of support under culvert ends and bridge approaches. Because the trigger is water, the frequency side of the risk rating is driven by drainage condition and climate, and the severity side by the collapse index and the thickness of collapsible soil.

Table 2.9-4. Suggested collapse hazard inputs to the 1-to-5 risk rating (Chapter 3.8)
RatingCollapse index / soilWetting exposure
1 Very lowIc < 1%, or soil already near saturationPositive drainage; no ponding
2 LowIc 1 to 2%Minor seasonal ponding away from track
3 ModerateIc 2 to 6% in less than 10 ft of soilCulverts or ditches crossing the collapsible zone
4 HighIc 2 to 6% over more than 10 ft, or 6 to 10%Known leaking culvert, ponding against embankment
5 SevereIc > 10%Active wetting with observed settlement or cracking

These bands are offered as a starting point; they should be calibrated in the risk-ratings workbook alongside the other ground hazards so that a "4" for collapse means the same likelihood of a track defect as a "4" for any other hazard.

2.9.7 Mitigation
Table 2.9-5. Mitigation of collapsible soils
ApproachMethodBest useLimitations
Keep it dryRepair culverts and joints, line ditches, regrade to drain away from the track, seal tension cracksExisting track; always the first stepNeeds ongoing maintenance
Remove and replaceExcavate collapsible soil and recompact at or above optimum moistureShallow deposits under new worksTrack outage; cost grows fast with depth
Pre-wet (prewetting / ponding)Flood the foundation before building so collapse happens firstNew embankments on thick depositsSlow; uneven wetting; can soften the ground
DensifyDynamic compaction, rapid impact compaction, compaction groutingDeposits 10 to 30 ft thickVibration near operating track
StabilizeChemical (lime, cement) or permeation groutingCulvert bedding, bridge approachesSulfate check needed (Chapter 2.12)
BypassDeep foundations through the collapsible zoneBridges and structuresDowndrag when collapse occurs

Densification and stabilization methods are described in Chapter 7.2. Whatever is done to the soil, the drainage that started the problem has to be fixed as well.

2.9.8 Worked Example
The example uses a generic site and is not taken from any client project. It follows the five-part format: Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 2.9-1: Screening and Collapse Settlement at a Leaking Culvert

A 15-ft-high embankment on a loess terrace has developed a recurring sag over a corrugated metal culvert. Test pits beside the culvert found 8 ft of dry, light-brown silt over moist, denser silt. Block samples were taken for index and collapse testing.

Given

VariableValueDescription
γd85 pcfNatural dry unit weight of the upper silt
Gs2.68Specific gravity
LL / PI30 / 6Liquid limit and plasticity index
e00.95Initial void ratio of collapse specimen
e1, e20.82, 0.74Void ratio before and after flooding at 2 tsf
H8 ftThickness of collapsible silt in the wetted zone

Required

  • Whether the silt is collapse-prone by the Gibbs criterion
  • Collapse index and degree of collapse
  • Estimated collapse settlement of the wetted zone

Equations

  1. Eq. 2.9-1: wsat = γw/γd − 1/Gs — Gibbs criterion
  2. Eq. 2.9-3: Ic = (e1 − e2)/(1 + e0) — collapse index
  3. Eq. 2.9-4: Sc = εc H — collapse settlement

Steps

Step 1 · Gibbs criterion (Eq. 2.9-1)
wsat = 62.4 / 85 − 1 / 2.68 = 0.734 − 0.373 = 0.361
wsat = 36.1% > LL = 30%: collapse-prone
Spot check: At 36% moisture the silt would be well wetter than its liquid limit, which is why it can collapse to a denser state.
↓
Step 2 · Collapse index (Eq. 2.9-3)
Ic = (0.82 − 0.74) / (1 + 0.95) = 0.08 / 1.95
Ic = 0.041 = 4.1%
Spot check: Table 2.9-3: 2.1 to 6.0% is moderate. A 0.08 change in void ratio on a 1.95 base is about 4%: consistent.
↓
Step 3 · Collapse settlement (Eq. 2.9-4)
Sc = 0.041 × (8 ft × 12 in/ft) = 0.041 × 96 in
Sc ≈ 3.9 in
Spot check: Order of magnitude: 4% of 8 ft is about a third of a foot, or 4 in.
↓
Solution
The silt is collapse-prone (wsat = 36% > LL = 30%), the collapse index is 4.1% (moderate), and wetting of the 8 ft zone around the culvert can produce about 4 in of settlement.

Solution

The silt is collapse-prone (wsat = 36% > LL = 30%), the collapse index is 4.1% (moderate), and wetting of the 8 ft zone around the culvert can produce about 4 in of settlement.

Four inches of settlement concentrated over a culvert 20 to 40 ft wide is a sharp sag, which matches the recurring geometry defect. The collapse is driven by the leaking culvert, so tamping alone will keep chasing it. The first action is to stop the water: reline or replace the culvert with watertight joints and regrade the inlet so water does not pond against the toe.

Because collapse is irreversible, soil that has already collapsed will not settle again; the remaining risk is in the dry silt beyond the wetted bulb. If the culvert is replaced by open cut, excavate the collapsible silt in the trench zone and recompact it at or slightly above optimum moisture. In the risk rating this site is a 4 (moderate collapse over a known leaking culvert) before repair and should fall to a 2 after the culvert is sealed.

2.9.9 Cross-References
← Previous · 2.0 The Underworld Chapter 2.8 — Groundwater Characterization and Seepage
Next · 2.0 The Underworld → Chapter 2.10 — Non-Engineered Fills: Old Embankments, Waste and Made Ground