Primary References: Holtz, Kovacs and Sheahan (2011); Terzaghi, Peck and Mesri (1996); Kulhawy and Mayne (1990), EPRI EL-6800; Boulanger and Idriss (2006, 2007); Bray and Sancio (2006); Idriss and Boulanger (2008), EERI MNO-12; Youd et al. (2001); Robertson and Wride (1998); USACE EM 1110-3-138; NRCS NEH Part 633, Chapter 26; ASTM D2487, D2488, D4318, D4546.
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Values for silts (ML, MH) from the database. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 50.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 76.4 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – soft sedimentary (chalk, shale, siltstone, coal) | Rockfill | Compacted | 76.4 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – soft sedimentary (chalk, shale, siltstone, coal) | Rockfill | Compacted | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Bulk (saturated) unit weight | Clay – soft, open-structured | CL-CH | Natural | 108.2 | 114.6 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – soft, open-structured | CL-CH | Natural | 70 | 79.5 | 89.1 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 114.6 | 127.3 | 140 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 82.8 | 101.9 | 121 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Tropical red clays | CL-MH | Natural | 108.2 | 120.9 | 133.7 | pcf | CB T3.1, p.79 |
| Dry unit weight | Tropical red clays | CL-MH | Natural | 82.8 | 98.7 | 114.6 | pcf | CB T3.1, p.79 |
| Specific gravity of solids | Most clay minerals | CL-CH | 2.67 | 2.7 | 2.73 | – | CB T3.1, p.79 | |
| Void ratio (natural) | Loose angular-grained silty sand | Natural state | 0.65 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Loose angular-grained silty sand | Natural state | 25 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Loose angular-grained silty sand | Natural state | 102 | pcf | DASP T3.2, p.76 | |||
| Void ratio (natural) | Dense angular-grained silty sand | Natural state | 0.4 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Dense angular-grained silty sand | Natural state | 15 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Dense angular-grained silty sand | Natural state | 121 | pcf | DASP T3.2, p.76 | |||
| Saturated unit weight | Silt | 114.6 | 120.9 | 127.3 | pcf | BUDHU T4.1, p.71 | ||
| Dry unit weight | Silt | 89.1 | 101.8 | 114.6 | pcf | BUDHU T4.1, p.71 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Maximum dry unit weight | Gravel–sand, well graded, small silt content | GM | AASHTO T 99 | 121 | 128.9 | 136.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Gravel–sand, well graded, small silt content | GM | AASHTO T 99 | 8 | 10 | 12 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, poorly graded, small silt content | SP | AASHTO T 99 | 101.9 | 111.5 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, poorly graded, small silt content | SP | AASHTO T 99 | 12 | 16.5 | 21 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Sand, well graded, small silt content | SM | AASHTO T 99 | 111.4 | 119.3 | 127.3 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Sand, well graded, small silt content | SM | AASHTO T 99 | 11 | 13.5 | 16 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silts, low plasticity | ML | AASHTO T 99 | 95.5 | 108.2 | 121 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Silts, low plasticity | ML | AASHTO T 99 | 12 | 18 | 24 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Organic silts, low plasticity | OL | AASHTO T 99 | 82.8 | 92.3 | 101.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Organic silts, low plasticity | OL | AASHTO T 99 | 21 | 26.5 | 32 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silts, high plasticity | MH | AASHTO T 99 | 70 | 82.8 | 95.5 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Silts, high plasticity | MH | AASHTO T 99 | 24 | 32 | 40 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 66.8 | 84.3 | 101.9 | pcf | CB T3.2, p.80 |
| Optimum moisture content | Organic silts/clays, high plasticity | OH | AASHTO T 99 | 21 | 33 | 45 | % | CB T3.2, p.80 |
| Maximum dry unit weight | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 111.4 | 124.2 | 136.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Silty or clayey gravel and sand | A-2 | AASHTO T 99 | 9 | 13.5 | 18 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Silty sands and gravels of low plasticity | A-4 | AASHTO T 99 | 95.5 | 111.4 | 127.3 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Silty sands and gravels of low plasticity | A-4 | AASHTO T 99 | 10 | 15 | 20 | % | CB T3.3, p.81 |
| Maximum dry unit weight | Elastic silts, diatomaceous or micaceous | A-5 | AASHTO T 99 | 85.9 | 93.9 | 101.9 | pcf | CB T3.3, p.81 |
| Optimum moisture content | Elastic silts, diatomaceous or micaceous | A-5 | AASHTO T 99 | 20 | 27.5 | 35 | % | CB T3.3, p.81 |
| Maximum dry unit weight (ASTM D698) | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 120 | 127.5 | 135 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 8 | 10 | 12 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silty sands | SM | UFC 3-220-20 Table 3-1 | 110 | 117.5 | 125 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silty sands | SM | UFC 3-220-20 Table 3-1 | 11 | 13.5 | 16 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty sands | SM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 110 | 120 | 130 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 11 | 13 | 15 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 95 | 107.5 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 12 | 18 | 24 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Maximum dry unit weight (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 100 | 110 | 120 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 12 | 17 | 22 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 80 | 90 | 100 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 21 | 27 | 33 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum dry unit weight (ASTM D698) | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 70 | 82.5 | 95 | pcf | UFC322020 T3-1, p.120 |
| Optimum moisture content (ASTM D698) | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 24 | 32 | 40 | % | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 6 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 10 t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed vibratory 15 t | 39 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed padfoot 6 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Towed padfoot 10 t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 7 (3) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 10 (5) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 15 (10) t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled vibratory 8 (4) t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled padfoot 11 (7) t | 16 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Self-propelled padfoot 15 (10) t | 28 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 2 t | 8 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 7 t | 12 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 10 t | 14 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Vibratory tandem 13 t | 18 | in | LOOK23 T7.8, p.223 | |||
| Maximum compacted layer thickness by roller type | Silt | Padfoot tandem 18 t | 28 | in | LOOK23 T7.8, p.223 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Plasticity index for swelling potential | Expansive clays | CL-CH | Low swell potential (Seed et al. 1962) | 0 | 7.5 | 15 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | Medium swell potential (Seed et al. 1962) | 10 | 20 | 30 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | High swell potential (Seed et al. 1962) | 20 | 37.5 | 55 | % | CB T8.4, p.180 |
| Plasticity index for swelling potential | Expansive clays | CL-CH | Very high swell potential (Seed et al. 1962) | 40 | % | CB T8.4, p.180 | ||
| Plasticity index for expansion potential | Expansive clays | CL-CH | Very high (probable expansion >30% of volume) | 35 | % | CB T8.6, p.185 | ||
| Plasticity index for expansion potential | Expansive clays | CL-CH | High (probable expansion 20–30% of volume) | 25 | 33 | 41 | % | CB T8.6, p.185 |
| Plasticity index for expansion potential | Expansive clays | CL-CH | Medium (probable expansion 10–30% of volume) | 15 | 21.5 | 28 | % | CB T8.6, p.185 |
| Plasticity index for expansion potential | Expansive clays | CL-CH | Low (probable expansion <10% of volume) | 18 | % | CB T8.6, p.185 | ||
| Liquid limit | Silt | ML | 30 | 35 | 40 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Silt | ML | 20 | 22.5 | 25 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Silt | ML | 10 | 12.5 | 15 | % | BUDHU T4.5, p.80 | |
| Liquid limit | Clay | CL-CH | 40 | 95 | 150 | % | BUDHU T4.5, p.80 | |
| Plastic limit | Clay | CL-CH | 25 | 37.5 | 50 | % | BUDHU T4.5, p.80 | |
| Plasticity index | Clay | CL-CH | 15 | 57.5 | 100 | % | BUDHU T4.5, p.80 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Undrained shear strength | Clay | CL-CH | Very soft | 251 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 251 | 386.5 | 522 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Firm | 522 | 783 | 1,044 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,044 | 1,566 | 2,088 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 2,088 | 3,132 | 4,177 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Hard | 4,177 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Very soft (N < 2) | 0.25 | tsf | IDOT T4.4.6.1.2-2, p.119 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Soft (N = 2–4) | 0.25 | 0.375 | 0.5 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Medium stiff (N = 4–8) | 0.5 | 0.75 | 1 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Stiff (N = 8–15) | 1 | 1.5 | 2 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Very stiff (N = 15–30) | 2 | 3 | 4 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Hard (N > 30) | 4 | 6 | 8 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| SPT N-value | Cohesive soil | CL-CH | Very soft | 0 | 0.5 | 1 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Soft | 2 | 3 | 4 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Medium stiff | 5 | 6.5 | 8 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Stiff | 9 | 12 | 15 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very stiff | 16 | 23 | 30 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Hard | 31 | 45.5 | 60 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very hard | 60 | blows/ft | GEC5 T23, p.137 | ||
| Undrained shear strength | Clay | CL-CH | Very soft | 418 | psf | CRAIG T4.1, p.121 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 418 | 626.5 | 835 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Firm | 835 | 1,200 | 1,566 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,566 | 2,350 | 3,133 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 3,133 | 4,700 | 6,266 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Hard | 6,266 | psf | CRAIG T4.1, p.121 | ||
| Presumed allowable bearing value (BS 8004) | Soft clay and silt | CL, CH, ML | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 1.6 | ksf | CURTIN T1.1, p.5 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Friction angle | Silty sand | Loose | 27 | 30 | 33 | deg | CB T6.4, p.159 | |
| Friction angle | Silty sand | Dense | 30 | 32 | 34 | deg | CB T6.4, p.159 | |
| Friction angle | Inorganic silt | Loose | 27 | 28.5 | 30 | deg | CB T6.4, p.159 | |
| Friction angle | Inorganic silt | Dense | 30 | 32.5 | 35 | deg | CB T6.4, p.159 | |
| Friction angle (compacted) | Silty gravels | GM | Compacted to standard Proctor MDD | 34 | deg | CB T6.5, p.159 | ||
| Effective friction angle (compacted) | Silty sands, sand–silt mix | SM | Compacted to standard Proctor MDD | 34 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Silts and clayey silts | ML | Compacted to standard Proctor MDD | 32 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Clayey silts, elastic silts | MH | Compacted to standard Proctor MDD | 25 | deg | CB T6.3, p.158 | ||
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Soft – organic | 104 | 156.5 | 209 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Soft – organic | 10 | 15 | 20 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 209 | 313.5 | 418 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 15 | 20 | 25 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Stiff | 418 | 731 | 1,044 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Stiff | 20 | 25 | 30 | deg | LOOK T7.9, p.107 |
| Effective cohesion (peak) | Cohesive soils | CL-CH / OL-OH | Hard | 1,044 | 1,566 | 2,088 | psf | LOOK T7.9, p.107 |
| Effective friction angle (peak) | Cohesive soils | CL-CH / OL-OH | Hard | 25 | 27.5 | 30 | deg | LOOK T7.9, p.107 |
| Undrained shear strength (compacted) | Silts, sands, sand–silt mix | SM | As compacted (standard Proctor MDD) | 1,044 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts, sands, sand–silt mix | SM | Saturated after compaction | 418 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts and clayey silts | ML | As compacted (standard Proctor MDD) | 1,358 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts and clayey silts | ML | Saturated after compaction | 209 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey silts, elastic silts | MH | As compacted (standard Proctor MDD) | 1,462 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey silts, elastic silts | MH | Saturated after compaction | 418 | psf | CB T6.1, p.145 | ||
| Drained friction angle | Silts | ML | 26 | 30.5 | 35 | deg | DASP T12.1, p.383 | |
| Critical-state friction angle | Silt or silty sand | ML / SM | Critical state | 24 | 28 | 32 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Silt or silty sand | ML / SM | Peak | 27 | 31 | 35 | deg | BUDHU T10.3, p.300 |
| Critical-state friction angle | Clays | CL-CH | Critical state | 15 | 22.5 | 30 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Clays | CL-CH | Peak | 20 | 25 | 30 | deg | BUDHU T10.3, p.300 |
| Residual friction angle | Clays | CL-CH | Residual | 5 | 10 | 15 | deg | BUDHU T10.3, p.300 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Friction coefficient, mass concrete on soil/rock | Clean fine to medium sand, silty medium to coarse sand, silty or clayey gravel | 0.45 | 0.5 | 0.55 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Clean fine sand, silty or clayey fine to medium sand | 0.35 | 0.4 | 0.45 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Fine sandy silt, non-plastic silt | 0.3 | 0.325 | 0.35 | – | CB T11.1, p.208 | ||
| Friction coefficient, mass concrete on soil/rock | Stiff clay and silty clay | 0.3 | 0.325 | 0.35 | – | CB T11.1, p.208 | ||
| Friction coefficient, steel sheet piles | Clean sand, silty sand–gravel mixtures, single-size hard rock fill | 0.3 | – | CB T11.1, p.208 | ||||
| Friction coefficient, steel sheet piles | Silty sand, gravel or sand mixed with silt or clay | 0.25 | – | CB T11.1, p.208 | ||||
| Friction coefficient, steel sheet piles | Fine sandy silt, non-plastic silt | 0.2 | – | CB T11.1, p.208 | ||||
| Adhesion, steel sheet piles | Soft clay and clayey silt | 104 | 365.5 | 627 | psf | CB T11.1, p.208 | ||
| Adhesion, steel sheet piles | Stiff and hard clay and clayey silt | 627 | 940 | 1,253 | psf | CB T11.1, p.208 | ||
| Friction coefficient, formed concrete / concrete sheet piling | Clean sand, silty sand–gravel mixtures, single-size hard rock fill | 0.3 | 0.35 | 0.4 | – | CB T11.1, p.208 | ||
| Friction coefficient, formed concrete / concrete sheet piling | Silty sand, gravel or sand mixed with silt or clay | 0.3 | – | CB T11.1, p.208 | ||||
| Friction coefficient, formed concrete / concrete sheet piling | Fine sandy silt, non-plastic silt | 0.25 | – | CB T11.1, p.208 | ||||
| Adhesion, formed concrete / concrete sheet piling | Soft clay and clayey silt | 209 | 470 | 731 | psf | CB T11.1, p.208 | ||
| Adhesion, formed concrete / concrete sheet piling | Stiff and hard clay and clayey silt | 731 | 992 | 1,253 | psf | CB T11.1, p.208 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Young's modulus, short term (undrained) | Silt | ML-CH | Soft | 208.9 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Silt | ML-CH | Soft | 167.1 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Silt | ML-CH | Stiff | 208.9 | 313.3 | 417.7 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Silt | ML-CH | Stiff | 167.1 | 240.2 | 313.3 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Silt | ML-CH | Hard | 417.7 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Silt | ML-CH | Hard | 313.3 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Clay | ML-CH | Very soft | 62.7 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, long term (drained) | Clay | ML-CH | Very soft | 41.8 | ksf | LOOK T11.7, p.152 | ||
| Young's modulus, short term (undrained) | Clay | ML-CH | Soft | 41.8 | 94 | 146.2 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Soft | 20.9 | 62.7 | 104.4 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Firm | 104.4 | 177.5 | 250.6 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Firm | 83.5 | 125.3 | 167.1 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Stiff | 208.9 | 365.5 | 522.1 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Stiff | 146.2 | 281.9 | 417.7 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Very stiff | 417.7 | 731 | 1,044 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Very stiff | 313.3 | 522.1 | 731 | ksf | LOOK T11.7, p.152 |
| Young's modulus, short term (undrained) | Clay | ML-CH | Hard | 835.4 | 1,253 | 1,671 | ksf | LOOK T11.7, p.152 |
| Young's modulus, long term (drained) | Clay | ML-CH | Hard | 626.6 | 939.8 | 1,253 | ksf | LOOK T11.7, p.152 |
| Small-strain shear modulus | Silty sands | 576 | 1,729 | 2,882 | ksf | GEC5 T30, p.181 | ||
| Poisson's ratio | Cohesive soil (settlement analysis) | CL-CH | 0.4 | – | USACE para. 3-9c, p.47 | |||
| Poisson's ratio | Silty sand | 0.2 | 0.3 | 0.4 | – | DASP T11.5, p.320 | ||
| Coefficient of subgrade reaction (1-ft plate) | Silty sand | 73.7 | 128.9 | 184.2 | pci | ROB T9, p.84 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of volume compressibility | Hard, heavily overconsolidated glacial till, stiff weathered rocks, hard clays | CL-CH / OH / Pt | Very low compressibility | 0.0024 | ft²/kip | CB T5.1, p.108 | ||
| Compression index | Hard, heavily overconsolidated glacial till, stiff weathered rocks, hard clays | CL-CH / OH / Pt | Very low compressibility | 0.025 | – | CB T5.1, p.108 | ||
| Coefficient of volume compressibility | Stiff glacial till, marls, very stiff tropical residual clays | CL-CH / OH / Pt | Low compressibility | 0.0024 | 0.0036 | 0.0048 | ft²/kip | CB T5.1, p.108 |
| Compression index | Stiff glacial till, marls, very stiff tropical residual clays | CL-CH / OH / Pt | Low compressibility | 0.025 | 0.0375 | 0.05 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Firm clays, glacial outwash clays, lake deposits, NC clays at depth | CL-CH / OH / Pt | Medium compressibility | 0.0048 | 0.0096 | 0.0144 | ft²/kip | CB T5.1, p.108 |
| Compression index | Firm clays, glacial outwash clays, lake deposits, NC clays at depth | CL-CH / OH / Pt | Medium compressibility | 0.05 | 0.1 | 0.15 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Poorly consolidated alluvial clays (estuarine), sensitive clays | CL-CH / OH / Pt | High compressibility | 0.0144 | 0.0431 | 0.0718 | ft²/kip | CB T5.1, p.108 |
| Compression index | Poorly consolidated alluvial clays (estuarine), sensitive clays | CL-CH / OH / Pt | High compressibility | 0.15 | 0.45 | 0.75 | – | CB T5.1, p.108 |
| Coefficient of volume compressibility | Highly organic alluvial clays and peats | CL-CH / OH / Pt | Very high compressibility | 0.0718 | ft²/kip | CB T5.1, p.108 | ||
| Compression index | Highly organic alluvial clays and peats | CL-CH / OH / Pt | Very high compressibility | 0.75 | 2.875 | 5 | – | CB T5.1, p.108 |
| Compression index | Uniform silts | ML / SP | 0.2 | – | USACE T3-7, p.59 | |||
| Compression index | Uniform sand, loose | ML / SP | 0.05 | 0.055 | 0.06 | – | USACE T3-7, p.59 | |
| Compression index | Uniform sand, dense | ML / SP | 0.02 | 0.025 | 0.03 | – | USACE T3-7, p.59 | |
| Recompression index | Clays | CL-CH | 0.015 | 0.1825 | 0.35 | – | CB T5.1 text, p.108 | |
| Secondary compression ratio | Silt | 0.03 | 0.0525 | 0.075 | – | USACE T3-14, p.79 | ||
| Secondary compression ratio | Organic silts | OL | 0.035 | 0.0475 | 0.06 | – | CB T5.4, p.117 | |
| Secondary compression ratio | Organic clays and silts | ML-MH | 0.04 | 0.05 | 0.06 | – | CB T5.4, p.117 | |
| Secondary compression ratio | Sensitive clay, Portland ME | CL-CH | 0.025 | 0.04 | 0.055 | – | CB T5.4, p.117 | |
| Coefficient of consolidation | Medium plasticity clays | CL-CH | 9.69 | ft²/yr | CB T5.3, p.114 | |||
| Coefficient of consolidation | Volcanic silt | MH | 3.23 | 4.305 | 5.38 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation | Organic silt | OL | 6.46 | 19.4 | 32.29 | ft²/yr | CB T5.3, p.114 | |
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – virgin compression | 1,292 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – virgin compression | 538.2 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – virgin compression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – virgin compression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – virgin compression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – virgin compression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – virgin compression | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – virgin compression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – virgin compression | 9.69 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Undisturbed – recompression | 215.3 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Undisturbed – recompression | 107.6 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Undisturbed – recompression | 53.82 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Undisturbed – recompression | 32.29 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Undisturbed – recompression | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Undisturbed – recompression | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Undisturbed – recompression | 8.61 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Undisturbed – recompression | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Undisturbed – recompression | 5.38 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 30% | ML-CH | Remolded | 43.06 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 40% | ML-CH | Remolded | 21.53 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 50% | ML-CH | Remolded | 16.15 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 60% | ML-CH | Remolded | 10.76 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 70% | ML-CH | Remolded | 6.46 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 80% | ML-CH | Remolded | 4.31 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 90% | ML-CH | Remolded | 3.77 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 100% | ML-CH | Remolded | 3.23 | ft²/yr | LOOK T8.14, p.122 | ||
| Coefficient of consolidation vs liquid limit | Fine-grained soil, LL = 110% | ML-CH | Remolded | 2.69 | ft²/yr | LOOK T8.14, p.122 | ||
| Overconsolidation ratio | Clays | CL-CH | Normally consolidated | 1 | 1.25 | 1.5 | – | LOOK T7.10, p.108 |
| Overconsolidation ratio | Clays | CL-CH | Lightly overconsolidated | 1.5 | 2.75 | 4 | – | LOOK T7.10, p.108 |
| Overconsolidation ratio | Clays | CL-CH | Heavily overconsolidated | 4 | – | LOOK T7.10, p.108 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of permeability | Gravel, silty | GM | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, silty | SM | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic silt, low plasticity | ML | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic silt, high plasticity | MH | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, low plasticity | OL | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, high plasticity | OH | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Silty and clayey sands | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Compacted silt | 7.0×10⁻⁸ | 7.0×10⁻⁷ | 7.0×10⁻⁶ | cm/s | CB T4.1, p.97 | ||
| Capillary rise | Silt | k ≈ 10⁻⁴ cm/s | 3.3 | 4.95 | 6.6 | ft | LOOK T7.20, p.113 | |
| Hydraulic conductivity | Silty clay | Saturated | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | DASP T7.1, p.181 | |
| Capillary rise | Silt | 2.5 | 13.8 | 25 | ft | DASP T9.2, p.262 | ||
| Coefficient of permeability for dewatering design | Sandy silt | USACE data | 5.0×10⁻⁴ | 1.0×10⁻³ | 2.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Silty sand | USACE data | 2.0×10⁻³ | 3.2×10⁻³ | 5.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability by grain size | Silt | 1.0×10⁻⁶ | 3.2×10⁻⁵ | 1.0×10⁻³ | cm/s | ATKINSON T6.2, p.78 | ||
| Typical height of capillary rise | Silt | 28 | 43.5 | 59 | in | LOOK23 T4.1, p.98 | ||
| Minimum Bligh creep ratio for dams on pervious foundations | Very fine sand or silt | 18 | – | EM1901 T9-10, p.9-62 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| California bearing ratio (soaked, design) | Sands, silty or clayey | SM, SC | Drainage: Good | 10 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Sands, silty or clayey | SM, SC | Drainage: Poor | 7 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Inorganic silts, low plasticity | ML | Drainage: Poor | 5 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Inorganic silts (high plasticity) and clays | MH, CL, CH | Drainage: Good | 3 | % | LOOK T13.9, p.183 | ||
| California bearing ratio (soaked, design) | Inorganic silts (high plasticity) and clays | MH, CL, CH | Drainage: Poor | 3 | % | LOOK T13.9, p.183 | ||
| California bearing ratio | Silty clay | PI = 30; water table >2 ft below formation | 5 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 30; water table <2 ft below formation | 3 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 20; water table >2 ft below formation | 6 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 20; water table <2 ft below formation | 4 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 10; water table >2 ft below formation | 7 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silty clay | PI = 10; water table <2 ft below formation | 5 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silt | Water table >2 ft below formation | 2 | % | CB T7.2, p.166 | |||
| California bearing ratio | Silt | Water table <2 ft below formation | 1 | % | CB T7.2, p.166 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Basic friction angle of joints | Sandstones, siltstone, chalk, gneiss, slate | Rock joints | Medium friction | 27 | 30.5 | 34 | deg | LOOK T9.15, p.134 |
| Allowable bearing capacity | Siltstone, coal, chalk, shale | Rock | Sedimentary – soft | 6.3 | 34.5 | 62.7 | ksf | LOOK T6.9, p.97 |
| Friction angle of rock discontinuity (clean, planar) | Sandstone, siltstone, chalk, gneiss, slate | Medium friction | 27 | 30.5 | 34 | deg | WYLLIE T4.1, p.81 | |
| Presumed allowable bearing value (BS 8004) | Strong shale, mudstone and siltstone | Preliminary design | 42 | ksf | CURTIN T1.1, p.5 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Frost susceptibility group | Gravelly soils with >20% finer than 0.02 mm; sands (except silty fine sands) with >15% finer; clays with PI > 12; varved clays with uniform conditions | F3 | F3 | CB T9.2, p.197 | ||||
| Frost susceptibility group | Silts, including sandy silts; fine silty sands with >15% finer than 0.02 mm; lean clays with PI < 12; varved clays with non-uniform conditions | F4 | F4 | CB T9.2, p.197 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Natural water content (saturated) | Loose angular-grained silty sand | Saturated, natural | 25 | % | DAS T2-3, p.12 | |||
| Natural water content (saturated) | Dense angular-grained silty sand | Saturated, natural | 15 | % | DAS T2-3, p.12 | |||
| Specific gravity of soil solids | Silts | ML-MH | 2.65 | 2.675 | 2.7 | – | DAS T3-1, p.14 | |
| Specific gravity of soil solids | Clay and silty clay | CL-CH | 2.67 | 2.785 | 2.9 | – | DAS T3-1, p.14 | |
| Pore pressure parameter at failure | Clays with high sensitivity | CL-CH | Triaxial (CU with pore pressure) | 0.75 | 1.125 | 1.5 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Normally consolidated clays | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.75 | 1 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Overconsolidated clays | CL-CH | Triaxial (CU with pore pressure) | -0.5 | -0.25 | 0 | – | DAS ch. 18 comments, p.134 |
| Pore pressure parameter at failure | Compacted sandy clay | CL-CH | Triaxial (CU with pore pressure) | 0.5 | 0.625 | 0.75 | – | DAS ch. 18 comments, p.134 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very low expansion potential | 0 | 10 | 20 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Low expansion potential | 21 | 35.5 | 50 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Medium expansion potential | 51 | 70.5 | 90 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | High expansion potential | 91 | 110.5 | 130 | – | D4829-19 T1, p.2 |
| Expansion index | Compacted fine-grained soil | CL-CH / MH | Very high expansion potential | 130 | – | D4829-19 T1, p.2 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Soil behavior type index | Clays – silty clay to clay | SBT zone 3 | 2.95 | 3.275 | 3.6 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Clays – silty clay to clay | SBT zone 3 | 1.0×10⁻⁸ | 3.2×10⁻⁸ | 1.0×10⁻⁷ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Clays – silty clay to clay | SBT zone 3 | 1.5 | – | ROB T5, p.41 | |||
| Soil behavior type index | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 2.6 | 2.775 | 2.95 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 3.0×10⁻⁷ | 1.7×10⁻⁶ | 1.0×10⁻⁵ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 2 | – | ROB T5, p.41 | |||
| Soil behavior type index | Sand mixtures – silty sand to sandy silt | SBT zone 5 | 2.05 | 2.325 | 2.6 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Sand mixtures – silty sand to sandy silt | SBT zone 5 | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Sand mixtures – silty sand to sandy silt | SBT zone 5 | 3 | – | ROB T5, p.41 | |||
| Soil behavior type index | Sands – clean sand to silty sand | SBT zone 6 | 1.31 | 1.68 | 2.05 | – | ROB Fig. 22, p.35 | |
| Permeability from soil behavior type | Sands – clean sand to silty sand | SBT zone 6 | 1.0×10⁻³ | 1.0×10⁻² | 1.0×10⁻¹ | cm/s | ROB T6, p.56 | |
| CPT–SPT ratio (qc/pa)/N60 | Sands – clean sand to silty sand | SBT zone 6 | 5 | – | ROB T5, p.41 | |||
| Permeability anisotropy kh/kv | Soft clay – No or slightly developed macrofabric, essentially homogeneous | CL-CH | 1 | 1.25 | 1.5 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Fairly to well-developed macrofabric (discontinuous permeable lenses) | CL-CH | 2 | 3 | 4 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Varved clays and deposits with continuous permeable layers | CL-CH | 3 | 9 | 15 | – | ROB T7, p.57 | |
| Cone factor for undrained strength | Clays | CL-CH | su = (qt − σvo)/Nkt | 10 | 14 | 18 | – | ROB text, p.43 |
| OCR factor k in OCR = k·Qt | Clays | CL-CH | Kulhawy & Mayne (1990) | 0.2 | 0.33 | 0.5 | – | ROB text, p.46 |
| Assumed effective friction angle | Clays | CL-CH | Small to medium projects without triaxial data | 28 | deg | ROB text, p.49 | ||
| Assumed effective friction angle | Silts | ML | Small to medium projects without triaxial data | 32 | deg | ROB text, p.49 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Cumulative plastic strain coefficient a | Elastic silt | MH | Li & Selig (1996) model | 0.84 | – | LI16 T4.7, p.174 | ||
| Cumulative plastic strain exponent b | Elastic silt | MH | Li & Selig (1996) model | 0.08 | 0.13 | 0.19 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent m | Elastic silt | MH | Li & Selig (1996) model | 1.3 | 2 | 4.2 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain coefficient a | Silt | ML | Li & Selig (1996) model | 0.64 | – | LI16 T4.7, p.174 | ||
| Cumulative plastic strain exponent b | Silt | ML | Li & Selig (1996) model | 0.06 | 0.1 | 0.17 | – | LI16 T4.7, p.174 |
| Cumulative plastic strain exponent m | Silt | ML | Li & Selig (1996) model | 1.4 | 1.7 | 2 | – | LI16 T4.7, p.174 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Silt is the fine, low-plasticity fraction of soil: particles that pass the No. 200 sieve (0.0029 in.) but are coarser than clay (about 0.00008 in.), with little or none of the clay minerals that make clay sticky and cohesive. Silts are classified ML or MH under the Unified Soil Classification System, and a great deal of railroad ground classed as CL-ML, SM or "lean clay" behaves like silt.
The engineering problems come from four properties that occur together in silt and in no other soil to the same degree:
This chapter collects typical values, correlations and equations for silts, and gives the screening and design steps for each problem. Section 2.4.2 covers identification; Sections 2.4.3 to 2.4.6 give typical properties; Sections 2.4.7 and 2.4.8 cover water and frost; Section 2.4.9 covers liquefaction; Section 2.4.10 covers loess and other special silts; and Section 2.4.11 turns all of it into earthwork guidance.
Railroads cross silt everywhere: on river floodplains and terraces where lines follow valleys, on glacial lake beds, on wind-blown loess uplands and bluffs, and in the residual soils of the Piedmont. Many older embankments were built from the nearest cut, so the fill under the ballast is often silt as well.
| Origin | Typical setting | Characteristic behavior |
|---|---|---|
| Alluvial (floodplain, terrace) | Valley alignments, bridge approaches, river crossings | Loose, saturated and layered with sand and clay; liquefiable in seismic regions; scour and piping at bridges and culverts |
| Lacustrine and glacial rock flour | Glacial lake plains of the Great Lakes, prairies, northern New England and eastern Canada | Varved silt and clay; very frost-susceptible; low strength when disturbed; can be sensitive |
| Loess (wind-blown) | Bluffs along the Mississippi and Missouri valleys, Iowa, Nebraska, Kansas, the Palouse | Low dry density; stands in near-vertical cuts while dry; collapses, erodes and pipes when wetted |
| Residual (saprolite) | Piedmont and Blue Ridge cuts and fills | Micaceous ML/MH; high void ratio, springy and hard to compact; erodible; strength declines as weathering increases |
| Fill derived from silt | Older embankments and subgrades | Variable density; pumps under traffic when wet; frost heave; surficial sloughing of side slopes |
| Mine tailings and dredge spoil | Industrial spurs, port and yard expansions | Very loose, saturated; high liquefaction and flow-slide potential |
On an operating railroad, silt problems usually show up first in the track, not in a boring log: soft spots and pumping ties, a winter heave that returns each year, sloughing on a cut face after rain, a sinkhole over a culvert, or a bridge approach that settles after a flood. Chapter 3.8, Section 3.8.13 sets out how to trace a symptom back to its mechanism. This chapter gives the soil-specific data to confirm whether silt is the cause.
Silt is identified by particle size and by plasticity. Particle size alone is not enough, because a soil can be mostly silt-sized and still behave like clay if it contains active clay minerals.
| System | Fines (silt + clay) | Silt size | Clay size |
|---|---|---|---|
| USCS (ASTM D2487) | Passing No. 200 sieve (finer than 0.0029 in.) | Defined by plasticity, not size | Defined by plasticity, not size |
| AASHTO M 145 | Passing No. 200 sieve | 0.0029 to 0.00008 in. | Finer than 0.00008 in. |
| Older ASTM practice (D422, D653) | Passing No. 200 sieve | 0.0029 to 0.0002 in. | Finer than 0.0002 in. (older practice) |
Silt grains cannot be seen individually with the naked eye but feel gritty between the teeth, unlike clay, which feels smooth.
Under the USCS, fine-grained soil (50% or more passing the No. 200 sieve) is classified from its liquid limit (LL) and plasticity index (PI) on the Casagrande plasticity chart. The A-line separates clays (above) from silts (below):
Eq. 2.4-1 (A-line) and Eq. 2.4-2 (U-line, upper bound of natural soils)
| Group | Plasticity criteria (ASTM D2487) | Typical description |
|---|---|---|
| ML | LL < 50; PI < 4 or plots below the A-line | Silt, sandy silt, rock flour; non-plastic to low plasticity |
| CL-ML | LL < 50; 4 ≤ PI ≤ 7 and on or above the A-line | Silty clay; transitional, often behaves like silt |
| MH | LL ≥ 50; plots below the A-line | Elastic silt; micaceous or diatomaceous silt, some saprolites |
| OL / OH | Organic; LL (oven-dried) < 0.75 LL (not dried) | Organic silt; high compressibility |
| SM (with high fines) | Fines 12% to 49%, fines classify ML or MH | Silty sand; silt-controlled drainage, frost and liquefaction behavior |
The visual-manual tests separate silt from clay in the field and should be recorded on every boring log where fine-grained soil is sampled:
| Test | Silt (ML) | Elastic silt (MH) | Lean clay (CL) |
|---|---|---|---|
| Dilatancy (shake a wet pat) | Rapid: water appears and disappears quickly | None to slow | None to slow |
| Dry strength (crush a dried ball) | None to low; powders easily | Low to medium | Medium to high |
| Toughness (roll a thread near the plastic limit) | Low; thread crumbles; cannot be re-rolled | Low to medium | Medium |
| Feel | Gritty, floury when dry; dries quickly on the hands | Smooth; may feel slick if micaceous | Smooth, sticky |
Silts fall in AASHTO groups A-4 (LL ≤ 40, PI ≤ 10) and A-5 (LL ≥ 41, PI ≤ 10), both with more than 35% passing the No. 200 sieve. The group index rates the soil as a subgrade (higher is worse):
Eq. 2.4-3
Where:
For details of grain-size and Atterberg limit testing, see Chapter 2.2, Sections 2.2.2 to 2.2.5.
Table 2.4-5 gives typical ranges for the main silt types. Use it to check laboratory results for reasonableness and for preliminary design before testing is complete.
| Property | ML | MH (elastic silt) | CL-ML | Loess | Micaceous saprolite (ML/MH) |
|---|---|---|---|---|---|
| Specific gravity, Gs | 2.65–2.75 | 2.65–2.80 (diatomaceous 2.0–2.5) | 2.65–2.72 | 2.65–2.72 | 2.70–2.90 |
| Liquid limit, LL | 25–45 | 50–80 | 20–30 | 25–35 | 35–60 |
| Plasticity index, PI | NP–12 | 15–35 | 4–7 | NP–12 | 5–20 |
| Natural water content, w (%) | 15–35 | 30–60 | 12–25 | 8–20 above water table | 20–45 |
| Total unit weight, γ (pcf) | 110–125 | 95–115 | 115–128 | 95–115 | 100–120 |
| Dry unit weight, γd (pcf) | 85–105 | 60–85 | 95–110 | 75–95 | 70–95 |
| Void ratio, e | 0.5–1.1 | 1.0–2.0 | 0.4–0.8 | 0.8–1.2 | 0.8–1.5 |
| Permeability, k (ft/day) | 0.003–3 | 0.0003–0.03 | 0.0003–0.03 | 0.03–3 (vertical > horizontal) | 0.003–0.3 |
| Capillary rise above water table (ft) | 3–25 | 10–30+ | 10–30+ | 3–15 | 5–25 |
| USACE frost group | F4 | F4 | F4 | F4 | F4 |
NP = non-plastic. Ranges compiled from Holtz, Kovacs and Sheahan (2011), Kulhawy and Mayne (1990), Terzaghi, Peck and Mesri (1996) and USACE EM 1110-3-138; site values govern.
The basic phase relationships are used throughout this chapter, in particular to check whether a silt is loose enough to collapse or liquefy:
Eq. 2.4-4 (γw = 62.4 pcf)
Hazen's approximation for the height of capillary rise, written for D10 in inches and hc in feet:
Eq. 2.4-5
Where:
For a typical silt with D10 = 0.0004 in. and e = 0.75, hc is 4 to 22 ft. Anywhere the water table is within that distance of the subgrade, the subgrade should be treated as wet in design, whatever its water content on the day of the boring.
Silt strength depends heavily on drainage. Non-plastic silt drains slowly enough to build pore pressure under rapid loading but fast enough that it partly drains in a CPT sounding or a lab test. Choose the drainage condition for each analysis deliberately and state it.
| Parameter | ML | MH | CL-ML | Notes |
|---|---|---|---|---|
| Drained friction angle, φ′ (deg) | 28–35 | 23–30 | 26–32 | Higher for angular rock flour and dense silt; lower for micaceous silt |
| Effective cohesion, c′ (psf) | 0–100 | 0–200 | 0–150 | Take c′ = 0 for long-term analysis of non-plastic silt unless testing shows otherwise |
| Residual friction angle, φ′r (deg) | 26–32 | 15–25 | 20–28 | Little drop from peak in non-plastic silt; larger drop as PI and mica content rise |
| Undrained strength ratio, su/σ′v (normally consolidated) | 0.20–0.30 | 0.22–0.30 | 0.20–0.28 | Use SHANSEP (Eq. 2.4-6) for overconsolidated silt |
| Sensitivity, St | 1–4 | 2–8 | 2–8 | Glacial lake and marine silty clays in eastern Canada can exceed 30 (quick) |
| Suction friction angle, φb (deg) | 15–25 | 10–20 | 10–20 | Strength gain from matric suction above the water table |
Ranges compiled from Kulhawy and Mayne (1990), Terzaghi, Peck and Mesri (1996) and Fredlund and Rahardjo (1993).
Eq. 2.4-6 (Ladd and Foott 1974)
Where:
Above the water table, silt gains apparent cohesion from negative pore pressure (suction). The extended Mohr-Coulomb criterion is:
Eq. 2.4-7 (Fredlund and Rahardjo 1993)
Where:
A matric suction of only 300 psf with φb = 18° adds about 100 psf of apparent cohesion, which is enough to hold a silt cut face at a steep angle. A wet season removes it. This is why silt and loess cuts that stood for years slough after prolonged rain, and why surficial failures in silt cuts should be analyzed with c′ = 0 and the suction term set to zero (Chapter 6.3, Section 6.3.6).
Inorganic, non-plastic silt is only moderately compressible and consolidates quickly, so most of its settlement happens during construction. Elastic silt, organic silt and loess are the exceptions: MH and OL/OH can settle as much as soft clay, and loess can collapse (Section 2.4.10).
| Parameter | ML | MH | CL-ML | Organic silt (OL/OH) |
|---|---|---|---|---|
| Compression index, Cc | 0.10–0.30 | 0.30–0.80 | 0.08–0.20 | 0.40–1.5 |
| Recompression index, Cr | 0.01–0.05 | 0.03–0.10 | 0.01–0.04 | 0.05–0.20 |
| Coefficient of consolidation, cv (ft2/day) | 0.5–20 | 0.05–2 | 0.1–5 | 0.02–1 |
| Secondary compression, Cα/Cc | 0.03–0.05 | 0.03–0.05 | 0.03–0.05 | 0.05–0.07 |
| Young's modulus, Es (ksf) | 40–300 | 20–150 | 50–250 | 10–60 |
| Poisson's ratio, ν | 0.30–0.35 | 0.35–0.40 | 0.30–0.35 | 0.35–0.45 |
Ranges compiled from Terzaghi, Peck and Mesri (1996), Holtz, Kovacs and Sheahan (2011) and Bowles (1996).
Eq. 2.4-8 (Terzaghi and Peck, normally consolidated clays and silts of moderate sensitivity) and Eq. 2.4-9 (Hough 1957, inorganic silty soils)
Eq. 2.4-10 (after Bowles 1996, silts and sandy silts)
Primary consolidation settlement and time rate use the standard equations of Chapter 6.2, Sections 6.2.4 and 6.2.5:
Eq. 2.4-11 and Eq. 2.4-12 (Tv = 0.197 for 50% and 0.848 for 90% consolidation)
Silt has a steep, narrow compaction curve. A change of 2 to 3 percentage points in water content can take it from firm and compactable to pumping and rutting under equipment. Silt also dries slowly in humid weather and rewets quickly, so moisture control, not compactive effort, usually governs.
| Parameter | ML | MH | CL-ML | Loess |
|---|---|---|---|---|
| Standard Proctor max. dry unit weight (pcf, ASTM D698) | 95–110 | 80–100 | 105–118 | 95–108 |
| Standard Proctor optimum water content (%) | 14–22 | 22–35 | 11–16 | 14–19 |
| Modified Proctor max. dry unit weight (pcf, ASTM D1557) | 105–118 | 90–108 | 112–125 | 105–115 |
| Workable water content window | −3 to +1 of optimum | −2 to +2 of optimum | −2 to +2 of optimum | −3 to +1 of optimum |
| Soaked CBR (ASTM D1883) | 3–10 | 2–6 | 3–8 | 3–8 |
| Resilient modulus, Mr (psi) | 4,000–12,000 | 3,000–7,000 | 4,000–10,000 | 4,000–10,000 |
| Subgrade rating (AASHTO) | Fair to poor | Poor | Fair to poor | Fair to poor |
Resilient modulus can be estimated from CBR with Mr = 2,555 CBR0.64 (MEPDG); see Chapter 7.3, Section 7.3.2. Silt Mr drops sharply with rising water content and during spring thaw.
Low-plasticity silt has too little clay to react well with lime alone. Cement, or lime with fly ash, works better:
| Silt type | Preferred stabilizer | Typical dosage (by dry weight) | Check |
|---|---|---|---|
| ML, CL-ML (PI < 10) | Portland cement | 6–12% | Unconfined strength (ASTM D1633, withdrawn 2026) 7-day ≥ 150–300 psi for base; wet-dry and freeze-thaw durability (ASTM D559, D560) |
| ML/MH with PI 10–20 | Lime + fly ash, or cement | Lime 3–5% + fly ash 10–15%, or cement 8–12% | Sulfate content (ASTM D4327) before using lime or cement; heave risk above about 3,000 ppm |
| MH (PI > 20) | Lime | 4–8% (by lime demand, ASTM D6276) | Strength gain and PI reduction |
| Wet silt for working platform | Quicklime or cement kiln dust (drying) | 2–5% | Water content reduction to the workable window |
See Chapter 7.2, Section 7.2.7 for design and construction of chemical stabilization.
Silt is the most erodible natural soil. Its grains are too light to resist flowing water as sand does and too weakly bonded to hold together as clay does. On railroads this shows up as surface erosion of cut slopes and ditches, internal erosion (piping) along culverts and through embankments, and mud pumping under the track.
Eq. 2.4-13 and Eq. 2.4-14
Where:
Silt exits are rarely protected by a gradient margin alone; they need a filter. The most common railroad cases are culvert outlets, the downstream toe of embankments that pond water, and seepage faces in cuts.
| Base soil category | Fines content of base soil (passing No. 200) | Retention criterion for filter D15F |
|---|---|---|
| 1 | > 85% | D15F ≤ 9 × d85B, but not less than 0.008 in. |
| 2 | 40–85% | D15F ≤ 0.028 in. |
| 3 | 15–39% | D15F ≤ [(40 − A)/(40 − 15)](4 d85B − 0.028 in.) + 0.028 in.; A = % passing No. 200 |
The filter must also be more permeable than the base soil (D15F ≥ 4 to 5 × d15B, minimum 0.004 in.) and internally stable. Grain sizes are after regrading the base soil on the No. 4 sieve as the NRCS procedure requires.
For geotextile filters against silt, FHWA NHI-07-092 gives retention criteria of O95 ≤ D85 for wovens and O95 ≤ 1.8 D85 for nonwovens, with an apparent opening size no larger than a No. 50 sieve (0.012 in.) for soils with more than 50% fines. Gap-graded or dispersive silts need filtration testing (ASTM D5101 gradient ratio).
Some low-plasticity silts and silty clays deflocculate in fresh water and erode at very low velocity. Suspect dispersion where culverts or embankments show tunnels and jug-shaped holes after the first heavy rains. Screen with the crumb test (ASTM D6572), the double hydrometer (ASTM D4221) and the pinhole test (ASTM D4647).
Under repeated wheel loads, a saturated silt subgrade surface softens, slurries and is pumped up into the ballast. The result is fouled ballast, loss of surface and recurring soft track. The remedies are those of Chapter 2.3, Section 2.3.5: drain the subgrade, install a subballast or sand blanket that meets the filter criteria above (or a separation geotextile), and keep the subballast sloped to the ditches. Undercutting and replacing ballast without fixing the subgrade drainage only resets the problem.
Silt is the most frost-susceptible soil, because it combines strong capillary suction with enough permeability to feed growing ice lenses. The mechanism, field signs and remedies are covered in Chapter 3.8, Section 3.8.8; frost depth calculation and frost design of pavements are in Chapter 7.3, Section 7.3.5. This section gives the classification criteria.
| Frost group | Soil type | Percent finer than 0.0008 in. by weight | Typical USCS groups |
|---|---|---|---|
| NFS | (a) Gravels; (b) sands | 0–1.5; 0–3 | GW, GP, SW, SP |
| PFS (possibly) | (a) Gravels; (b) sands | 1.5–3; 3–10 | GW, GP, SW, SP |
| F1 | Gravelly soils | 3–10 | GW, GP, GW-GM, GP-GM |
| F2 | (a) Gravelly soils; (b) sands | 10–20; 3–15 | GM, GW-GM, GP-GM; SW, SP, SM, SW-SM, SP-SM |
| F3 | (a) Gravelly soils; (b) sands, except very fine silty sands; (c) clays, PI > 12 | > 20; > 15; — | GM, GC; SM, SC; CL, CH |
| F4 | (a) All silts; (b) very fine silty sands; (c) clays, PI < 12; (d) varved clays and other fine-grained, banded sediments | —; > 15; —; — | ML, MH; SM; CL, CL-ML; CL and ML, CL, ML and SM, CL, CH and ML |
0.0008 in. is the 0.02 mm size used in the Casagrande criterion. Frost susceptibility increases from F1 to F4. Group F4 soils show the highest heave rates and the greatest loss of strength on thawing.
When ice lenses melt in spring, the thawed silt above the still-frozen layer cannot drain downward, its water content rises above the liquid limit locally, and its strength and resilient modulus fall. Design practice for F4 silts is to reduce the subgrade modulus by 50% to 75% during the thaw period, or to use the USACE reduced-subgrade-strength method. Under traffic, the thawed saturated silt can liquefy and pump; this "silt liquefaction" in spring is a cyclic-loading failure of the same family as seismic liquefaction (Section 2.4.9), and is the reason spring slow orders are common on silt subgrades.
Fine-grained soils were once assumed not to liquefy. Experience in the 1999 Kocaeli (Turkey) and Chi-Chi (Taiwan) earthquakes, where low-plasticity silts liquefied extensively, changed that view. Current practice first asks whether a silt will behave like a sand (liquefaction: rapid loss of strength and large strains once excess pore pressure approaches the effective stress) or like a clay (cyclic softening: gradual build-up of strain without full loss of strength), and then applies the matching procedure. Chapter 6.5, Sections 6.5.4 to 6.5.7 give the full triggering and consequence procedures; this section covers what is specific to silts.
Three screening criteria are in common use. Apply them to samples from below the design water table, using water content measured on undisturbed or carefully handled samples.
| Method | Susceptible (sand-like) | Transitional | Not susceptible (clay-like) | Comment |
|---|---|---|---|---|
| Boulanger and Idriss (2006) | PI < 7 | PI about 3–8 for CL-ML | PI ≥ 7 | Recommended default; evaluate clay-like soils for cyclic softening (Section 2.4.9.4) |
| Bray and Sancio (2006) | w/LL ≥ 0.85 and PI ≤ 12 | w/LL ≥ 0.80 and 12 < PI ≤ 18 (moderately susceptible; test) | PI > 18 (at low effective stress) | Based on cyclic tests of Adapazari silts; uses natural water content |
| Modified Chinese criteria (Wang 1979; Seed and Idriss 1982) | Clay fraction (finer than 0.0002 in.) ≤ 15%, LL ≤ 35 and w ≥ 0.9 LL | — | Any one condition not met | No longer recommended alone; misclassified liquefiable silts in 1999 earthquakes |
Where screening results conflict, take the more susceptible result or run cyclic laboratory tests (cyclic direct simple shear or cyclic triaxial) on high-quality samples.
For sand-like silts and silty sands, use the simplified procedure of Chapter 6.5, Section 6.5.5 with the fines correction. The cyclic stress ratio is:
Eq. 2.4-15 (rd = 1.0 − 0.00765z for z ≤ 29.5 ft, z in feet)
The fines content correction converts the normalized blow count to a clean-sand equivalent:
Eq. 2.4-16 (Youd et al. 2001, after Idriss and Seed; FC in percent)
The correction grows with fines content up to FC = 35% and is fixed above it: a soil with FC ≥ 35% and (N 1 ) 60 = 12 gains about 7 blows. The correction reflects higher cyclic resistance at the same blow count, not higher density, so do not apply it to soils classified as clay-like in Step 1.
Eq. 2.4-17 (Youd et al. 2001; valid for (N1)60,cs < 30) and Eq. 2.4-18
Use MSF and Kσ from Chapter 6.5, Section 6.5.4. Keep the procedure consistent: Eqs. 2.4-15 to 2.4-17 are the Youd et al. (2001) set. Do not mix them with the Idriss and Boulanger (2008) fines correction, CRR curve, MSF or r d in final design.
The CPT is better suited to silty ground than the SPT because it detects thin silt seams and measures pore pressure. The soil behavior type index is:
Eq. 2.4-19 (Robertson and Wride 1998; Fr in percent)
| Ic | Soil behavior type | Liquefaction screening |
|---|---|---|
| < 2.05 | Sands: clean sand to silty sand | Evaluate with CPT procedure |
| 2.05–2.60 | Sand mixtures: silty sand to sandy silt | Evaluate with CPT procedure and fines correction |
| 2.60–2.95 | Silt mixtures: clayey silt to silty clay | Transitional; confirm with samples (PI, w/LL). Many are clay-like |
| > 2.95 | Clays | Generally clay-like; check cyclic softening |
For sand-like soils, the equivalent clean-sand normalized tip resistance and the cyclic resistance ratio are:
Eq. 2.4-20 and Eq. 2.4-21 (Robertson and Wride 1998)
Kc grows rapidly above Ic = 2.4 (it is about 2.8 at Ic = 2.5), so the result for silty soils is very sensitive to Ic. Calibrate Ic against samples from adjacent borings before relying on CPT-only results in silt.
For silts that screen as clay-like (PI ≥ 7), Boulanger and Idriss (2007) relate cyclic resistance to undrained strength:
Eq. 2.4-22 and Eq. 2.4-23 (MSFclay ≤ 1.13)
Where:
Clay-like silts with FS below about 1.0 to 1.2 can develop significant shear strain and settlement, and under sloping ground such as embankments they can move permanently downslope. Evaluate these cases with a Newmark sliding-block or deformation analysis (Chapter 6.5, Section 6.5.8) using a reduced (cyclically softened) strength.
Mitigation of liquefiable silts is harder than for clean sand: vibro-compaction does not densify soils with more than about 15% to 20% fines, and stone columns in silt need wick drains or rely on reinforcement rather than densification. Deep soil mixing, jet grouting, compaction grouting and drainage are the usual options (Chapter 7.2, Section 7.2.5).
Loess is wind-deposited silt with an open structure held together by clay bridges and carbonate cement. While dry it stands in near-vertical cuts tens of feet high. When wetted under load, the bonds soften and the structure collapses, often by several percent of the layer thickness, with no added load.
Gibbs and Bara (1962): a loose silt is likely to collapse if its water content at saturation is greater than its liquid limit, because on wetting it would be weaker than a soil at the liquid limit:
Eq. 2.4-24
Typical loess with γd below about 85 pcf and LL near 30 fails this check. Natural dry unit weights above about 100 pcf rarely collapse significantly.
ASTM D4546 (which replaced D5333, withdrawn in 2012) loads an undisturbed specimen in a consolidometer to a chosen stress, then floods it. The collapse at a stress of 4.2 ksf (the standard index stress) is the collapse index Ie; the collapse at the actual design stress is the collapse potential used to estimate settlement:
Eq. 2.4-25 and Eq. 2.4-26 (sum over layers expected to wet)
| Collapse index Ie (%) at 4.2 ksf (ASTM D4546) | Degree of specimen collapse | Collapse potential CP (%) (Jennings and Knight 1975) | Severity of problem |
|---|---|---|---|
| 0 | None | 0–1 | No problem |
| 0.1–2.0 | Slight | 1–5 | Moderate trouble |
| 2.1–6.0 | Moderate | 5–10 | Trouble |
| 6.1–10.0 | Moderately severe | 10–20 | Severe trouble |
| > 10 | Severe | > 20 | Very severe trouble |
Jennings and Knight CP is measured at 4.2 ksf in the double-oedometer or single-oedometer test; the two scales are listed side by side for comparison and are not exact equivalents.
| Silt | Recognition | Engineering concern |
|---|---|---|
| Micaceous saprolite (Piedmont) | Shiny flakes; slick feel; low unit weight for its density; ML or MH | Springy, hard to compact; high Cc and rebound; low φ′; erodible; Proctor density not achievable in the field |
| Diatomaceous silt | Very low Gs (2.0–2.5); very high w and LL; light when dry | High compressibility despite high φ′; misleading index tests |
| Varved glacial lake deposits | Alternating silt and clay layers, typically less than 1 in. thick | Horizontal permeability many times vertical; frost group F4; slope failures along silt partings |
| Sensitive (quick) silty clay | Large strength loss on remolding; St > 8; eastern Canada glacial marine deposits | Retrogressive flow slides along river valleys; avoid disturbing the toe; vibration-sensitive |
| Organic silt (OL/OH) | Dark color, odor; LL drops on oven drying | High compressibility and secondary compression; low strength |
| Application | Main concerns | Guidance |
|---|---|---|
| Track subgrade | Pumping, frost heave, thaw weakening, low Mr | Drain the subgrade (ditches, underdrains); subballast or blanket layer that meets filter criteria or separation geotextile; frost protection depth per Chapter 7.3 Section 7.3.5; treat or replace silt where pumping recurs (Chapter 2.3, Section 2.3.4) |
| Embankment fill | Moisture control, erosion, softening when wetted | Use only above the high-water level unless stabilized; compact at optimum −2 to optimum; side slopes 2H:1V or flatter with prompt vegetation or erosion matting; bench into existing slopes; drain the core |
| Embankment over silt foundation | Undrained failure during fill placement (saturated loose silt); liquefaction; settlement | Check end-of-construction stability using undrained or partly drained strength; monitor pore pressure in staged construction; silt consolidates quickly, so stage periods are short |
| Cut slopes | Loss of suction, surface erosion, seepage sloughing | Analyze surficial stability with c′ = 0; crest interceptor ditch; toe drain or rock buttress at seepage faces; vegetate quickly; loess cuts per Section 2.4.10 |
| Behind retaining walls | Frost, drainage, low strength | Do not use silt as wall backfill; use free-draining granular backfill with a filter against the silt; for stabilization walls use driven soldier piles with lagging |
| Culverts and pipes | Piping along the pipe; erosion at the outlet | Filter diaphragm or filter collar around the pipe; compacted bedding of non-silt material; outlet riprap on a filter |
| Bridge approaches and abutments on floodplain silt | Scour, lateral spreading, settlement | Deep foundations through liquefiable silt; scour countermeasures; approach slabs or transition zones |
For hazard rating, silt conditions feed directly into the site conditions and instability blocks of the GHSR worksheet in Chapter 3.8: record the USCS group, water level, evidence of pumping or seepage, and whether the silt screens as liquefiable.
| Eq. | Quantity | Expression | Use and limits |
|---|---|---|---|
| 2.4-1 | A-line | PI = 0.73(LL − 20) | Silts plot below |
| 2.4-3 | AASHTO group index | GI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10) | Subgrade rating; negative terms = 0 |
| 2.4-4 | Saturated water content | wsat = γw/γd − 1/Gs | Collapse and liquefaction screening |
| 2.4-5 | Capillary rise | hc = C′/(e D10), C′ = 0.0013–0.0065 ft·in. | Order-of-magnitude estimate |
| 2.4-6 | Undrained strength ratio | su/σ′v = S · OCRm | Plastic silts; S ≈ 0.20–0.25, m ≈ 0.8 |
| 2.4-7 | Unsaturated shear strength | τ = c′ + (σ − ua)tanφ′ + (ua − uw)tanφb | Above water table; suction lost on wetting |
| 2.4-8 | Compression index | Cc = 0.009(LL − 10) | NC soils; ±30% |
| 2.4-9 | Compression index | Cc = 0.30(e0 − 0.27) | Inorganic silty soils |
| 2.4-10 | Young's modulus | Es (ksf) ≈ 6.3(N60 + 6) | Silts, sandy silts; preliminary |
| 2.4-13 | Critical gradient | ic = (Gs − 1)/(1 + e) | Heave and piping |
| 2.4-16 | SPT fines correction | (N1)60,cs = α + β(N1)60 (Youd et al. 2001) | Sand-like soils only |
| 2.4-17 | CRR from SPT | Youd et al. (2001) | (N1)60,cs < 30 |
| 2.4-19 | CPT soil behavior type index | Ic = √[(3.47 − log Qtn)2 + (log Fr + 1.22)2] | Ic > 2.6 often clay-like |
| 2.4-22 | Cyclic resistance, clay-like | CRR = 0.8 (su/σ′v) Kα | PI ≥ 7 |
| 2.4-24 | Gibbs collapse criterion | wsat > LL | Loess, loose silt |
| 2.4-26 | Collapse settlement | S = Σ CPi Hi | ASTM D4546 at design stress |
Other equations used with silts (Stefan and modified Berggren frost depth, Boussinesq stress, consolidation time) are collected in Appendix F.
A low embankment crosses a river floodplain in a seismic region, and two silt layers lie below the water table. Silts are where the two liquefaction screens disagree most often, so the first question for each layer is not whether it will liquefy but which kind of analysis it needs: a sand-like triggering analysis or a clay-like cyclic softening analysis.
| Variable | Value | Description |
|---|---|---|
| Layer A | 5 to 18 ft; LL = 31, PI = 6, w = 29%, fines = 78% | Upper silt |
| Layer B | 18 to 30 ft; LL = 58, PI = 24, w = 45%, fines = 96% | Lower silt |
| Screen 1 | Boulanger and Idriss: PI < 7 sand-like; otherwise clay-like | Section 2.4.8 |
| Screen 2 | Bray and Sancio: w/LL ≥ 0.85 and PI ≤ 12 susceptible; PI > 18 not susceptible | Section 2.4.8 |
Layer A is ML (silt with sand) and sand-like: evaluate liquefaction triggering (Example 2.4-2). Layer B is MH (elastic silt) and clay-like: evaluate cyclic softening (Example 2.4-3).
Both layers are silts and both plot below the A-line, yet they behave differently in an earthquake. Layer A’s low plasticity and high water content let it build pore pressure and liquefy; Layer B’s plasticity makes it soften gradually instead. Choosing the wrong analysis is a common error with silts and can be unconservative either way.
Layer A of Example 2.4-1 screened as sand-like, so it is checked with the simplified SPT triggering procedure of Youd et al. (2001). The calculation compares the cyclic stress the earthquake applies (CSR) with the cyclic resistance the soil has (CRR).
| Variable | Value | Description |
|---|---|---|
| z | 15 ft | Depth of the check, in Layer A |
| zw | 5 ft | Depth to water |
| γ | 115 pcf above, 120 pcf below the water table | Unit weights |
| N60 | 9 | Energy-corrected blow count |
| FC | 35% | Fines content of the cleaner sample used for the check |
| amax | 0.20g | Design peak ground acceleration |
| Mw | 8.0 | Design magnitude |
| MSF | 1.19 | Magnitude scaling factor for Mw 7.0 (Table 6.5-3) |
| Kσ | 1.0 | Overburden correction (σ′v < 2,117 psf) |
CSR = 0.177, CRR7.5 = 0.211 and FSL = 1.42. Liquefaction is not predicted.
The margin over a typical target of 1.2 to 1.3 (check the client criteria in Section 6.5.9) is modest. The layer’s typical fines content of 78% gives the same correction as 35%, because the correction stops increasing at 35%, so the answer is controlled by the blow count. One N-value of 9 is thin evidence in a variable floodplain silt; CPTu soundings to look for looser zones should come before the result is accepted.
Layer B of Example 2.4-1 is clay-like, so it does not liquefy in the sand sense; it can soften under cyclic loading. The check compares the cyclic stress with a cyclic resistance taken from the soil’s undrained strength ratio (Boulanger and Idriss 2007).
| Variable | Value | Description |
|---|---|---|
| z | 25 ft | Depth of the check, in Layer B |
| zw | 5 ft | Depth to water |
| γ | 115 pcf above; 108 pcf below the water table | Unit weights (108 pcf applied conservatively to the full 20 ft) |
| OCR | 1.5 | Lightly overconsolidated |
| S, m | 0.22 and 0.8 | SHANSEP parameters |
| amax, Mw | 0.20g; 7.0 | Same earthquake as Example 2.4-2 |
| Kα | 1.0 | Level ground |
FS = 1.29 on level ground; significant cyclic softening is not expected.
Under the embankment side slope the static shear stress lowers the cyclic resistance (Kα < 1.0), so the check should be repeated beneath the slope. If the factor of safety there falls near 1.0, estimate the permanent displacement with a Newmark analysis (Chapter 6.5) rather than relying on the factor of safety alone.
A yard track sits on a silt subgrade with the water table 6 ft down. Frost heave needs three things together: a frost-susceptible soil, freezing temperatures in it, and water supply. The capillary rise tells whether the water table can feed ice lenses in the frost zone.
| Variable | Value | Description |
|---|---|---|
| Soil | ML silt; D10 = 0.0004 in.; e = 0.75 | Subgrade |
| Fines | 45% finer than 0.0008 in. (0.02 mm) | Frost-critical fraction |
| zw | 6 ft below top of subgrade | Seasonal high water table |
| zf | 5 ft | Design frost depth |
| C | 0.0013 to 0.0065 in.·ft | Hazen capillary constant, low and high estimates, in the units of Eq. 2.4-5 |
Capillary rise is 4.3 to 21.7 ft; even the low estimate brings water within 2 ft of the subgrade surface. The silt is group F4, and frost heave is likely.
All three conditions for heave in Section 3.8.8.1 are present. The remedies each remove one of them: lower the water table with underdrains (water), replace the silt within the frost depth with non-frost-susceptible material (soil), or insulate (freezing). The design should also allow for a reduced subgrade modulus during the spring thaw.
A 12-ft embankment for a second main track is planned over 10 ft of loess on dense till. Dry loess stands steeply and carries load well, but it can collapse when wetted under load. The first step screens whether collapse is likely; the second estimates how much.
| Variable | Value | Description |
|---|---|---|
| H | 10 ft | Loess thickness above dense till |
| γd | 82 pcf | Dry unit weight |
| Gs | 2.68 | Specific gravity |
| LL | 30 | Liquid limit |
| w | 11% | Natural water content |
| εc | 6% | Collapse strain from ASTM D4546 at the design stress (about 1.9 ksf at mid-layer) |
Collapse is likely, and wetting the full layer would add about 7.2 in. of settlement to the ordinary compression under the embankment.
Seven inches of differential settlement between the new and existing tracks is not acceptable. The options are to remove and recompact the loess under the new embankment, to pre-wet the foundation before building, or, where removal is not practical, to control every water source and build the ditches and culverts so that water stays away from the toe.
Starting values for preliminary design where only classification and blow counts are available. Replace with tested values as soon as they exist.
| Soil | SPT N60 (blows/ft) | γ (pcf) | φ′ (deg) | c′ (psf) | su (psf) | Cc/(1+e0) | Es (ksf) | Soaked CBR |
|---|---|---|---|---|---|---|---|---|
| ML, very loose to loose, saturated | 0–4 | 105–115 | 27–30 | 0 | Partly drained; use effective stress | 0.06–0.12 | 30–60 | 2–4 |
| ML, medium dense | 5–15 | 115–122 | 30–33 | 0 | — | 0.04–0.08 | 70–130 | 4–8 |
| ML, dense | 16–30 | 120–128 | 32–36 | 0–100 | — | 0.02–0.05 | 140–230 | 6–12 |
| MH, soft to firm | 2–8 | 95–110 | 23–27 | 0–100 | 250–750 | 0.12–0.25 | 20–60 | 2–4 |
| MH, stiff | 9–20 | 105–115 | 26–30 | 50–200 | 750–2,000 | 0.08–0.15 | 60–150 | 3–6 |
| CL-ML, firm to stiff | 5–15 | 118–126 | 28–32 | 50–150 | 500–1,500 | 0.04–0.08 | 60–130 | 3–8 |
| Loess, dry (above water table) | 8–20 | 95–110 | 30–34 | 200–800 (apparent) | — | Collapse governs | 100–200 (dry) | 4–8 |
| Micaceous saprolite (ML/MH) | 6–25 | 105–118 | 27–32 | 0–200 | — | 0.06–0.15 | 60–200 | 3–8 |
Es from Eq. 2.4-10 rounded. c′ for loess is apparent cohesion from suction and cementation; set to zero for wetted conditions.
Checklist · Part X · Problem Soils
A Class I railroad main line has a history of soft spots and mud pumping over a silty subgrade. A sample from the subgrade has the liquid limit, plasticity index and fines content shown. The engineer must classify the soil in the USCS and AASHTO systems and comment on it as a track subgrade.
| Variable | Value | Description |
|---|---|---|
| LL | 42 | Liquid limit |
| PI | 10 | Plasticity index |
| F | 80% | Passing No. 200 |
USCS: ML. AASHTO: A-5 with GI = 9, written A-5(9).
A-5 is the AASHTO group for silty soils with a high liquid limit: compressible and poor as subgrade. Note that the soil is a silt in both systems even though its PI is 10; the A-line, not the PI alone, separates silt from clay.
A new railroad embankment will be built over 10 ft of normally consolidated silt drained at top and bottom. The fill will add the stress shown at mid-layer. The railroad wants to know how much settlement to expect and whether it will be complete before track is laid. The engineer must estimate the settlement and the time to 90% consolidation.
Silts consolidate much faster than clays, so most of the settlement can finish during construction. The question estimates both how much and how fast, with two correlations for the compression index to show the range.
| Variable | Value | Description |
|---|---|---|
| H | 10 ft, drained top and bottom | Normally consolidated silt |
| LL | 38 | Liquid limit |
| e0 | 0.85 | Initial void ratio |
| cv | 2 ft²/day | Coefficient of consolidation |
| σ′0 | 1,000 psf | Effective stress at mid-layer |
| Δσ | 800 psf | Stress increase from new fill |
Settlement of about 2.9 to 4.2 in., 90% complete in about 11 days.
Most of the settlement will happen while the fill is being placed, which is the usual case for silts and the opposite of soft clays. The two correlations differ by about 30%; a consolidation test would narrow the range of Cc if the settlement matters to the design.
Water is exiting through silt at the outlet of a culvert under a Class I railroad embankment, and a flow net gives the exit gradient shown. The railroad wants to know whether the outlet is at risk of piping. The engineer must compute the critical gradient and the factor of safety against piping and recommend any protection.
Silts are among the soils most prone to piping because they are fine enough to move and too weak in cohesion to resist. The check compares the exit gradient from a flow net with the critical gradient at which the soil becomes quick.
| Variable | Value | Description |
|---|---|---|
| Gs | 2.70 | Specific gravity |
| e | 0.80 | Void ratio |
| iexit | 0.35 | Exit gradient from the flow net |
| Target FS | 3 | For an unprotected silt exit |
FS = 2.7, below the target of 3 for an unprotected silt exit.
Provide a filter at the outlet (Section 2.4.7, Category 1 or 2 depending on the fines content) and outlet protection. The filter lets water leave while holding the silt in place, which is what removes the piping risk; riprap alone would not.
A piezocone sounding was made through a saturated, non-plastic sandy silt beneath a Class I railroad main line in a seismic area. The normalized cone resistance and friction ratio are shown. The engineer must compute the soil behavior type index, the clean-sand equivalent resistance and the cyclic resistance ratio for the liquefaction assessment.
The CPT method of Robertson and Wride converts the normalized tip resistance of a silty soil to a clean-sand equivalent through the soil behavior type index Ic. In silts the correction factor Kc is large, which is why the question asks for it explicitly.
| Variable | Value | Description |
|---|---|---|
| Qtn | 35 | Normalized cone resistance |
| Fr | 2.5% | Normalized friction ratio |
| Soil | Saturated sandy silt, non-plastic (confirmed by samples) |
Ic = 2.52, Qtn,cs = 100 and CRR7.5 = 0.17.
The correction nearly triples the tip resistance, so in silts the result depends heavily on Ic, which in turn depends on the friction ratio. A small error in Fr moves CRR a lot. Confirm Ic against samples, as was done here, before relying on the result.
| Topic | Refer To |
|---|---|
| Frost heave, thaw weakening and silt liquefaction mechanisms | Chapter 3.8, Section 3.8.8 |
| Track subgrade failure modes, pumping and blanket layers | Chapter 2.3, Section 2.3.5; Section 2.3.4 |
| In situ testing (CPTu, dissipation tests) | Chapter 5.1, Section 5.1.2 |
| Grain size, Atterberg limits, USCS and AASHTO classification | Chapter 2.2, Sections 2.2.2–2.2.5 |
| Frost susceptibility classification | Chapter 2.2, Section 2.2.7 |
| Seepage analysis and exit gradients | Chapter 2.8, Section 2.8.5 |
| Laboratory test methods | Chapter 5.2, Section 5.2.3 |
| Consolidation settlement and time rate | Chapter 6.2, Sections 6.2.4–6.2.5 |
| Slope stability and residual strength | Chapter 6.3, Section 6.3.6 |
| Liquefaction triggering and consequences | Chapter 6.5, Sections 6.5.4–6.5.8 |
| Ground improvement (stabilization, DSM, drains) | Chapter 7.2, Sections 7.2.5–7.2.7 |
| Ground hazard risk assessment (GHSR worksheet) | Chapter 3.8 |
| Pavement subgrade and frost design | Chapter 7.3, Section 7.3.5 |
| Analytical equations | Appendix F |
Silts and fine sands under track pump: wet fines are worked up into the ballast under each axle, the ballast fouls, the track goes soft and the surface fails, as in the mud spring under a western main line described in one of the conference papers. The subballast layer is the defense. It must be graded so that the subgrade cannot wash up into it and the ballast cannot punch down into it, which is the filter rule used for earth dams. AREMA Chapter 1, Part 2, sets out the method: plot the subgrade gradation, apply the filter ratios to its D15 and D50 to get the allowable band for the subballast, then size the combined ballast and subballast thickness with Talbot's equation.
| Character of subballast | R50 = D50 subballast / D50 subgrade | R15 = D15 subballast / D15 subgrade |
|---|---|---|
| Uniform gradation (Cu 3 to 4) | 5 to 10 | – |
| Well to poorly graded, subrounded grains | 12 to 58 | 12 to 40 |
| Well to poorly graded, angular particles (crushed stone) | 9 to 30 | 6 to 18 |
Also: maximum subballast size not larger than the largest ballast particle; no more than 5% passing the No. 200 sieve; crushed stone with a uniformity coefficient not over 15. Where the subgrade can pipe, keep subballast D15 below 5 times subgrade D85 and use a well-graded subballast.
Equation 2.4-27. Ballast plus subballast depth (Talbot)
pa = average pressure under the tie (psi), pc = allowable subgrade pressure including safety factor (psi), h in inches below the tie. AREMA keeps 12 in. of ballast below the tie so tamping does not reach the subballast; the rest of h is subballast.
| Check | Result |
|---|---|
| D50 band (9 to 30 × 0.24 mm) | 2.16 to 7.2 mm; subballast 4.75 mm |
| D15 band (6 to 18 × 0.046 mm) | 0.28 to 0.83 mm; subballast 0.675 mm |
| Uniformity coefficient | 14.2 |
| Passing No. 200 | 3.0 % |
| Ballast + subballast depth for pa = 55 psi, pc = 18 psi | 23.4 in. |
| Subballast thickness under 12 in. of ballast | 11.4 in. |
The bands and the 23.4 in. depth match the AREMA example (Figure 1-2-5 and Article 3.10.2.3).
Most dense-graded aggregate base specifications fall near this band, but each source should be checked against the actual subgrade, because a silt with D15 near 0.01 mm needs a much finer subballast than a sandy silt. Where suitable subballast is not available, a geotextile separator can supplement it.
Open the subballast filter calculator →
AREMA filter ratios for D15 and D50, maximum size, fines, uniformity and piping checks, and the Talbot thickness of ballast plus subballast.
This is the AREMA example of Table 1.5-20, worked by hand. A subballast over silt must satisfy two filter ratios so the silt cannot pump up into it, and then the ballast plus subballast must be thick enough to bring the subgrade pressure down to its allowable value.
| Variable | Value | Description |
|---|---|---|
| D15,s, D50,s | 0.046 mm and 0.24 mm | Subgrade gradation |
| Subballast | Crushed stone: D15 = 0.675 mm, D50 = 4.75 mm, Cu = 14.2, 3.0% passing No. 200 | Proposed material |
| Ratios | R50 9 to 30; R15 6 to 18 | Table 2.4-19, angular particles |
| pa | 55 psi | Average pressure under the tie |
| pc | 18 psi | Allowable subgrade pressure including safety factor |
| Ballast | 12 in. below the tie | AREMA minimum |
The crushed stone fits both filter bands and the gradation limits. The ballast plus subballast must be 23.4 in. deep, so 11.4 in. of subballast goes under 12 in. of ballast.
The results match the AREMA example (Figure 1-2-5 and Article 3.10.2.3). The bands scale with the subgrade: a silt with D15 near 0.01 mm would need a much finer subballast than this sandy silt, so each source must be checked against the actual subgrade. Where suitable subballast is not available, a geotextile separator can supplement it.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads are not named.
Fill placed dry of optimum and at low density can collapse when it is first saturated, by rising water or by a flood against the embankment. Section 2.4.10 gives the collapse potential from a single flooding test. Two findings from compacted-soil research refine that check for embankments.
Equation 2.4-28. Collapse settlement from the saturated compression curve
e0,i = as-placed void ratio of layer i; esat,i = void ratio on the saturated oedometer curve at the layer's vertical stress after flooding.
A centrifuge model of an embankment built at about 82% of maximum dry density on the dry side, flooded in two stages, confirmed the method for the zone away from the slopes. Scaled to the field, a 66-ft (20-m) embankment flooded to 16 ft (5 m) would settle about 3.3 ft (1 m). The prediction depends mainly on the height of capillary rise (how high the fill becomes saturated) and on the dry density profile before flooding; near the slopes, rotation of the stresses adds movement. The method is not suited to high-plasticity clays (Thorel et al., 2011, pp. 191–193).
Old end-dumped clay embankments went through this collapse when first wetted after construction, and the settlement was made up with ash and ballast (Chapter 2.5, Section 2.5.18). New fill, widenings and grade raises have not: specify placement density and moisture so that the saturated curve lies close to the as-placed state.
A 10-ft layer of sandy clay fill in a siding embankment was placed dry of optimum and lightly compacted. A flood is expected to saturate it. A saturated oedometer test on a specimen at the as-placed density gives the compression curve.
| Variable | Value | Description |
|---|---|---|
| H | 10 ft | Layer thickness |
| e0 | 0.62 | As-placed void ratio |
| σ′v | 1,200 psf | Vertical stress at mid-layer after flooding |
| esat | 0.55 | Void ratio on the saturated oedometer curve at 1,200 psf |
The layer will settle about 5 in. the first time it is saturated, on top of any consolidation of the foundation. Under track that is enough to need surfacing and possibly a slow order after the flood.
For a new or rebuilt embankment the cheaper fix is at placement: compact closer to optimum and to a higher density so that e0 sits near the saturated curve. For an existing fill, raise the flood protection or plan inspection and surfacing after high water.
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.
Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Typical-value ranges are compiled from several of these sources; site-specific testing governs design.