About this section
Section 6.0 turns soil and rock parameters into answers: bearing capacity of foundations, settlement of embankments and structures, slope stability, infiltration and seepage, and seismic hazard and liquefaction. The apps and analytical tools for the manual are gathered here, at the end of each chapter.
Worked examples follow a five-part format (Given, Required, Equations, Steps and Solution) with a spot check at each step.
Chapters
Foundation Engineering: Bearing Capacity
Foundation bearing capacity governs the structural adequacy of every load-transfer element in railroad infrastructure — bridge abutments and piers, signal equipment…
Settlement Analysis
Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.
Slope Stability Analysis
Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across all nine railroad client systems.
Infiltration and Seepage
How rainfall and water move into and through railroad fills, slopes and subgrade, how that is measured, and what it does to stability.
Seismic Hazard and Liquefaction
Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Tunnels and Portals
Inspection, assessment, repair and clearance improvement of existing railroad tunnels and their portals.