Subsections
22Railway Ground Hazard Risk Management
Primary sources: AREMA Manual for Railway Engineering (MRE), Chapter 1 (Roadway and Ballast) and Chapter 8 (Concrete Structures and Foundations); FRA Track Safety Standards, 49 CFR Part 213; FRA Bridge Safety Standards, 49 CFR Part 237; Selig, E.T. and Waters, J.M. (1994), Track Geotechnology and Substructure Management; Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016), Railway Geotechnics; applicable ASTM standards as cited; and Chapters 1.4, 5.1–5.3, 6.1 and 6.2 of this manual.
New chapter drafted September 2026 for the Railway Ground Hazard Risk Management reorganization. Verify client-specific values against the governing client standard before use on a project.
- 2.1.0Executive Summaryopen →
- ·Empirical Equations — Use and Limitationsopen →
- 2.1.1Defining Track Foundation Elementsopen →
- 2.1.2Embankmentsopen →
- 2.1.3Cut Sections and Cut Slopesopen →
- 2.1.4Foundation Soils Beneath Embankmentsopen →
- 2.1.5Drainage Elementsopen →
- 2.1.6Bridge Approaches and Transition Zonesopen →
- 2.1.7Structural Foundations Supporting or Adjacent to the Trackopen →
- 2.1.8Grade Crossings, Turnouts and Special Trackworkopen →
- 2.1.9Utility and Pipeline Crossingsopen →
- 2.1.10Investigation Matrix for Foundation Elementsopen →
- 2.1.11Performance Criteriaopen →
- 2.1.12Practical Recommendationsopen →
- 2.1.13Foundation Elements Checklistopen →
- 2.1.14Cross-Reference Tableopen →
- 2.1.15Practice Questionsopen →
- ·Referencesopen →
- 2.1.16Case Studiesopen →
- ·Supplemental Referencesopen →
- 2.1.17Granular Layer Thickness Design (Li-Selig Method)open →
- ·Author and Sourcesopen →