Subsections
20Primary References: Terzaghi, Peck and Mesri (1996); Holtz, Kovacs and Sheahan (2011); Mitchell and Soga (2005); Ladd (1991); Mesri and Godlewski (1977); Stark and Eid (1994, 1997); Skempton (1953, 1964); Chen (1988); Nelson and Miller (1992); Selig and Waters (1994); ASTM D2435, D4318, D4546, D4767, D6467.
- 2.5.0Executive Summaryopen →
- 2.5.1Background and Railroad Contextopen →
- 2.5.2Identification, Classification and Mineralogyopen →
- 2.5.3Typical Index and Physical Propertiesopen →
- 2.5.4Undrained Shear Strength and Stress Historyopen →
- 2.5.5Drained, Fully Softened and Residual Strengthopen →
- 2.5.6Compressibility and Consolidationopen →
- 2.5.7Soft Clay Foundations: Embankment Stabilityopen →
- 2.5.8Expansive Claysopen →
- 2.5.9Clay Subgrades: Pumping, Ballast Pockets and Shoulder Failuresopen →
- 2.5.10Other Clay Hazardsopen →
- 2.5.11Summary of Equationsopen →
- 2.5.12Worked Examplesopen →
- 2.5.13Representative Data Tableopen →
- 2.5.14Practical Recommendationsopen →
- 2.5.15Clay Investigation and Design Checklistopen →
- 2.5.16Practice Questionsopen →
- 2.5.17Cross-Referencesopen →
- 2.5.18Old End-Dumped Clay-Fill Embankments: Fabric, Seasonal Movement and Delayed Failureopen →
- ·Author and Sourcesopen →
Apps
2 appsChapter 2.5 · Section 2.5.7.1Settlement Diagnosis on Soft ClaySettlement rate from surfacing or survey records, trend classification, and the bearing factor of safety of the embankment on soft clay.Chapter 2.5 · Section 2.5.7.2Staged Embankment ConstructionStage heights from the 5.53 su screen, strength gain from consolidation of each lift (vertical and, with wick drains, radial), the number of stages and the time to reach the final height.