dirtbert.com › GHRM › Manual contents › Section 4.0
GHRM · Section 4.0

Subsurface Exploration

Borings and sampling.

1 chapter

About this section

Section 4.0 covers how the ground is explored: borings, sampling methods, the SPT, rock coring, test pits and the field records that come out of them, with the practical constraints of working on an active railroad right-of-way.

The samples and logs produced here are the starting point for the testing in Section 5.0 and the soil profiles used in every analysis.

How it fits: Implements the drilling scope from Section 3.0; supplies samples and logs to Section 5.0.

Chapters

Chapter 4.1

Borings and Sampling

Borings and sampling form the physical backbone of every geotechnical investigation we conduct for railroad clients.

21 subsections