dirtbert.com › GHRM › 2.0 The Underworld › Chapter 2.3
GHRM · Chapter 2.3

Track Substructure: Ballast, Subballast and Subgrade

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.