About this section
Section 7.0 covers the fixes: retaining structures for railroad stabilization, ground improvement methods (with a library of 45 technology sheets), pavement subgrade design for yards and terminals, and the management and remedial design of earthwork assets.
Each design is a risk reduction measure; the chapters show how the choice of solution, and how well it is designed and built, changes the residual risk.
Chapters
Retaining Structures
Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Ground Improvement Methods
Ground improvement is a fundamental tool in the railroad geotechnical consultant's toolkit, employed when in-situ subgrade conditions cannot support track, structure, or…
Pavement Subgrade Evaluation
Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Earthworks Asset Management and Remedial Design
Treating the cuts and embankments of a railroad as an asset portfolio: inventory, condition, deterioration, prioritization and the choice of remedial works.
Ground Improvement Technology Library
45 technique sheets, each with supplementary graphics, inside Chapter 7.2.