Primary References: Holtz, Kovacs and Sheahan (2011); Bolton (1986); Kulhawy and Mayne (1990); Hoek (2007), Practical Rock Engineering; Wyllie and Mah (2004), Rock Slope Engineering; Bieniawski (1989); Barton and Choubey (1977); Deere and Deere (1988); FHWA (1993) Rockfall Hazard Rating System; ISRM (2007) suggested methods; ASTM D2487, D6913, D7012, D5731, D4644, D6032 (withdrawn 2025) (withdrawn 2025).
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Rock and sand values from the database. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Intact rock cohesion | Sandstone (Triassic), coal, chalk, shale, limestone (Triassic) | Rock | Sedimentary – soft | 145 | 1,523 | 2,901 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Sandstone (Triassic), coal, chalk, shale, limestone (Triassic) | Rock | Sedimentary – soft | 25 | 30 | 35 | deg | LOOK T9.12, p.132 |
| Intact rock cohesion | Limestone, dolomite, greywacke, Carboniferous sandstone | Rock | Sedimentary – hard | 1,450 | 2,900 | 4,351 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Limestone, dolomite, greywacke, Carboniferous sandstone | Rock | Sedimentary – hard | 35 | 40 | 45 | deg | LOOK T9.12, p.132 |
| Intact rock cohesion | Quartzite, marble, gneiss | Rock | Metamorphic – non-foliated | 2,901 | 4,352 | 5,802 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Quartzite, marble, gneiss | Rock | Metamorphic – non-foliated | 30 | 35 | 40 | deg | LOOK T9.12, p.132 |
| Intact rock cohesion | Schist, slate, phyllite | Rock | Metamorphic – foliated | 1,450 | 2,900 | 4,351 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Schist, slate, phyllite | Rock | Metamorphic – foliated | 25 | 30 | 35 | deg | LOOK T9.12, p.132 |
| Intact rock cohesion | Granite | Rock | Igneous – acid | 4,351 | 5,802 | 7,252 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Granite | Rock | Igneous – acid | 45 | 50 | 55 | deg | LOOK T9.12, p.132 |
| Intact rock cohesion | Basalt | Rock | Igneous – basic | 4,351 | 5,802 | 7,252 | psi | LOOK T9.12, p.132 |
| Intact rock friction angle | Basalt | Rock | Igneous – basic | 30 | 35 | 40 | deg | LOOK T9.12, p.132 |
| Basic friction angle of joints | Schists, shale | Rock joints | Low friction | 20 | 23.5 | 27 | deg | LOOK T9.15, p.134 |
| Basic friction angle of joints | Sandstones, siltstone, chalk, gneiss, slate | Rock joints | Medium friction | 27 | 30.5 | 34 | deg | LOOK T9.15, p.134 |
| Basic friction angle of joints | Basalt, granite, limestone, conglomerate | Rock joints | High friction | 34 | 37 | 40 | deg | LOOK T9.15, p.134 |
| Allowable bearing capacity | Granite, microgranite | Rock | Igneous – acid | 16.7 | 91.9 | 167.1 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Basalt, dolerite | Rock | Igneous – basic | 12.5 | 68.9 | 125.3 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Tuff, breccia | Rock | Igneous – pyroclastic | 8.4 | 46 | 83.5 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Quartzite, gneiss | Rock | Metamorphic – non-foliated | 20.9 | 114.9 | 208.8 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Phyllite, slate, schist | Rock | Metamorphic – foliated | 8.4 | 46 | 83.5 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Limestone, dolomite, sandstone | Rock | Sedimentary – hard | 10.4 | 57.4 | 104.4 | ksf | LOOK T6.9, p.97 |
| Allowable bearing capacity | Siltstone, coal, chalk, shale | Rock | Sedimentary – soft | 6.3 | 34.5 | 62.7 | ksf | LOOK T6.9, p.97 |
| Unconfined compressive strength | Rock | Rock | Soft rock | 1,450 | psi | LOOK T6.1, p.90 | ||
| Unconfined compressive strength | Rock | Rock | Medium rock | 1,450 | 2,176 | 2,901 | psi | LOOK T6.1, p.90 |
| Unconfined compressive strength | Rock | Rock | Hard rock (typical concrete strength) | 2,901 | psi | LOOK T6.1, p.90 | ||
| Poisson's ratio of rock | Basalt | Rock | Intact | 0.1 | 0.15 | 0.2 | – | LOOK T11.23, p.159 |
| Poisson's ratio of rock | Granite | Rock | Intact | 0.15 | 0.2 | 0.25 | – | LOOK T11.23, p.159 |
| Poisson's ratio of rock | Sandstone | Rock | Intact | 0.15 | 0.225 | 0.3 | – | LOOK T11.23, p.159 |
| Poisson's ratio of rock | Limestone | Rock | Intact | 0.25 | 0.3 | 0.35 | – | LOOK T11.23, p.159 |
| Modulus ratio (intact) | Basalts and other flow rocks, granite, low-foliation schist, marble | Rock | Intact | 500 | – | LOOK T11.19, p.157 | ||
| Modulus ratio (intact) | Gneiss, quartzite, limestone, dolomite | Rock | Intact | 200 | – | LOOK T11.19, p.157 | ||
| Modulus ratio (intact) | Shales, sandstones, steeply foliated schist | Rock | Intact | 100 | – | LOOK T11.19, p.157 | ||
| Rock quality designation | Rock core | Rock | Very poor | 0 | 12.5 | 25 | % | GEC5 T39, p.229 |
| Rock quality designation | Rock core | Rock | Poor | 25 | 37.5 | 50 | % | GEC5 T39, p.229 |
| Rock quality designation | Rock core | Rock | Fair | 50 | 62.5 | 75 | % | GEC5 T39, p.229 |
| Rock quality designation | Rock core | Rock | Good | 75 | 82.5 | 90 | % | GEC5 T39, p.229 |
| Rock quality designation | Rock core | Rock | Excellent | 90 | 95 | 100 | % | GEC5 T39, p.229 |
| Rock mass / intact modulus ratio | RQD = 100% | Rock | Closed joints | 1 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 100% | Rock | Open joints | 0.6 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 70% | Rock | Closed joints | 0.7 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 70% | Rock | Open joints | 0.1 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 50% | Rock | Closed joints | 0.15 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 50% | Rock | Open joints | 0.1 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 20% | Rock | Closed joints | 0.05 | – | GEC5 T42, p.234 | ||
| Rock mass / intact modulus ratio | RQD = 20% | Rock | Open joints | 0.05 | – | GEC5 T42, p.234 | ||
| Intact rock compressive strength (RMR class) | Rock | Rock | Exceptionally strong | 36,260 | psi | SINGH T6.1, p.50 | ||
| Intact rock compressive strength (RMR class) | Rock | Rock | Very strong | 14,504 | 25,382 | 36,260 | psi | SINGH T6.1, p.50 |
| Intact rock compressive strength (RMR class) | Rock | Rock | Strong | 7,252 | 10,878 | 14,504 | psi | SINGH T6.1, p.50 |
| Intact rock compressive strength (RMR class) | Rock | Rock | Average | 3,626 | 5,439 | 7,252 | psi | SINGH T6.1, p.50 |
| Intact rock compressive strength (RMR class) | Rock | Rock | Weak | 1,450 | 2,538 | 3,626 | psi | SINGH T6.1, p.50 |
| Intact rock compressive strength (RMR class) | Rock | Rock | Very weak | 290 | 870 | 1,450 | psi | SINGH T6.1, p.50 |
| Intact rock compressive strength (RMR class) | Rock | Rock | Extremely weak | 145 | 217.5 | 290 | psi | SINGH T6.1, p.50 |
| Discontinuity spacing descriptor | Rock core and outcrop – Laminated | 0.25 | in | PENNDOT T30, p.3-43 | ||||
| Discontinuity spacing descriptor | Rock core and outcrop – Narrow | 0.25 | 0.625 | 1 | in | PENNDOT T30, p.3-43 | ||
| Discontinuity spacing descriptor | Rock core and outcrop – Close | 1 | 2 | 3 | in | PENNDOT T30, p.3-43 | ||
| Discontinuity spacing descriptor | Rock core and outcrop – Moderate | 3 | 6 | 9 | in | PENNDOT T30, p.3-43 | ||
| Discontinuity spacing descriptor | Rock core and outcrop – Medium | 9 | 16.5 | 24 | in | PENNDOT T30, p.3-43 | ||
| Discontinuity spacing descriptor | Rock core and outcrop – Wide | 24 | 48 | 72 | in | PENNDOT T30, p.3-43 | ||
| Discontinuity spacing descriptor | Rock core and outcrop – Massive | 72 | in | PENNDOT T30, p.3-43 | ||||
| Friction angle of rock discontinuity (clean, planar) | Schists (high mica), shale, marl | Low friction | 20 | 23.5 | 27 | deg | WYLLIE T4.1, p.81 | |
| Friction angle of rock discontinuity (clean, planar) | Sandstone, siltstone, chalk, gneiss, slate | Medium friction | 27 | 30.5 | 34 | deg | WYLLIE T4.1, p.81 | |
| Friction angle of rock discontinuity (clean, planar) | Basalt, granite, limestone, conglomerate | High friction | 34 | 37 | 40 | deg | WYLLIE T4.1, p.81 | |
| Allowable rock–grout bond stress, cement-grouted anchor | Strong rock (UCS > 14,500 psi) | 152 | 177.5 | 203 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Medium rock (UCS 7,250–14,500 psi) | 102 | 127 | 152 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Weak rock (UCS 2,900–7,250 psi) | 51 | 76.5 | 102 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Granite, basalt | 80 | 112.5 | 145 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Dolomitic limestone | 65 | 83.5 | 102 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Soft limestone | 51 | 62 | 73 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Slates, strong shales | 44 | 54.5 | 65 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Weak shales | 7 | 25.5 | 44 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Sandstone | 44 | 65.5 | 87 | psi | WYLLIE T12.8, p.297 | ||
| Allowable rock–grout bond stress, cement-grouted anchor | Concrete | 65 | 98 | 131 | psi | WYLLIE T12.8, p.297 | ||
| Presumed allowable bearing value (BS 8004) | Strong igneous and gneissic rock, sound | Preliminary design | 209 | ksf | CURTIN T1.1, p.5 | |||
| Presumed allowable bearing value (BS 8004) | Strong limestone and strong sandstone | Preliminary design | 84 | ksf | CURTIN T1.1, p.5 | |||
| Presumed allowable bearing value (BS 8004) | Schists and slates | Preliminary design | 63 | ksf | CURTIN T1.1, p.5 | |||
| Presumed allowable bearing value (BS 8004) | Strong shale, mudstone and siltstone | Preliminary design | 42 | ksf | CURTIN T1.1, p.5 | |||
| Seismic P-wave velocity – typical rippable limit | Ripping with Cat D8R | 306 hp | 5,580 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical unrippable limit | Ripping with Cat D8R | 306 hp | 7,550 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical rippable limit | Ripping with Cat D9R | 405 hp | 6,560 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical unrippable limit | Ripping with Cat D9R | 405 hp | 8,530 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical rippable limit | Ripping with Cat D10T | 581 hp | 7,550 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical unrippable limit | Ripping with Cat D10T | 581 hp | 9,840 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical rippable limit | Ripping with Cat D11T | 850 hp | 8,530 | ft/s | LOOK23 T8.4, p.251 | |||
| Seismic P-wave velocity – typical unrippable limit | Ripping with Cat D11T | 850 hp | 11,480 | ft/s | LOOK23 T8.4, p.251 | |||
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Stronger rock (G1–G2) | Joints: Rough, fresh | 60 | 62.5 | 65 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Weaker rock (G3–G4) | Joints: Rough, fresh | 50 | 55 | 60 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Stronger rock (G1–G2) | Joints: Rough, slightly weathered | 60 | 62.5 | 65 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Weaker rock (G3–G4) | Joints: Rough, slightly weathered | 50 | 55 | 60 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Stronger rock (G1–G2) | Joints: Smooth, moderately weathered | 50 | 55 | 60 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Weaker rock (G3–G4) | Joints: Smooth, moderately weathered | 45 | 47.5 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Stronger rock (G1–G2) | Joints: Polished/slickensided or infilled | 45 | 47.5 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – interlocked; Weaker rock (G3–G4) | Joints: Polished/slickensided or infilled | 40 | 45 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Stronger rock (G1–G2) | Joints: Rough, fresh | 45 | 47.5 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Weaker rock (G3–G4) | Joints: Rough, fresh | 40 | 45 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Stronger rock (G1–G2) | Joints: Rough, slightly weathered | 45 | 47.5 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Weaker rock (G3–G4) | Joints: Rough, slightly weathered | 40 | 45 | 50 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Stronger rock (G1–G2) | Joints: Smooth, moderately weathered | 40 | 42.5 | 45 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Weaker rock (G3–G4) | Joints: Smooth, moderately weathered | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Stronger rock (G1–G2) | Joints: Polished/slickensided or infilled | 40 | 42.5 | 45 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Blocky – disturbed; Weaker rock (G3–G4) | Joints: Polished/slickensided or infilled | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Disintegrated; Weaker rock (G3–G4) | Joints: Rough, fresh | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Disintegrated; Weaker rock (G3–G4) | Joints: Rough, slightly weathered | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Disintegrated; Weaker rock (G3–G4) | Joints: Smooth, moderately weathered | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Indicative cut slope angle in rock mass (no adverse structure) | Disintegrated; Weaker rock (G3–G4) | Joints: Polished/slickensided or infilled | 35 | 37.5 | 40 | deg | HEARN C2.5, p.153 | |
| Bearing capacity shape correction on rock, Nc factor Cc | Circular | 1.2 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nγ factor Cγ | Circular | 0.7 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nc factor Cc | Square | 1.25 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nγ factor Cγ | Square | 0.85 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nc factor Cc | Rectangular L/B = 2 | 1.12 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nγ factor Cγ | Rectangular L/B = 2 | 0.9 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nc factor Cc | Rectangular L/B = 5 | 1.05 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nγ factor Cγ | Rectangular L/B = 5 | 0.95 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nc factor Cc | Strip L/B ≥ 10 | 1 | – | EM2908 T6-1, p.6-3 | ||||
| Bearing capacity shape correction on rock, Nγ factor Cγ | Strip L/B ≥ 10 | 1 | – | EM2908 T6-1, p.6-3 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Dry unit weight of rock | Shale | Rock | Extremely weathered (XW) | 127.3 | 133.7 | 140 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Shale | Rock | Distinctly weathered (DW) | 133.7 | 140.1 | 146.4 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Shale | Rock | Slightly weathered (SW) | 140 | 146.4 | 152.8 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Shale | Rock | Fresh (Fr) | 146.4 | 152.8 | 159.1 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Extremely weathered (XW) | 114.6 | 124.1 | 133.7 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Distinctly weathered (DW) | 127.3 | 136.8 | 146.4 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Slightly weathered (SW) | 140 | 149.6 | 159.1 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Fresh (Fr) | 152.8 | 159.2 | 165.5 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Limestone | Rock | Extremely weathered (XW) | 121 | 127.3 | 133.7 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Limestone | Rock | Distinctly weathered (DW) | 133.7 | 140.1 | 146.4 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Limestone | Rock | Slightly weathered (SW) | 146.4 | 152.8 | 159.1 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Limestone | Rock | Fresh (Fr) | 159.1 | 165.5 | 171.9 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Schist | Rock | Extremely weathered (XW) | 146.4 | 152.8 | 159.1 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Schist | Rock | Distinctly weathered (DW) | 152.8 | 159.2 | 165.5 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Schist | Rock | Slightly weathered (SW) | 159.1 | 165.5 | 171.9 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Schist | Rock | Fresh (Fr) | 165.5 | 171.8 | 178.2 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Gneiss | Rock | Extremely weathered (XW) | 146.4 | 155.9 | 165.5 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Gneiss | Rock | Distinctly weathered (DW) | 152.8 | 162.4 | 171.9 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Gneiss | Rock | Slightly weathered (SW) | 165.5 | 171.8 | 178.2 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Gneiss | Rock | Fresh (Fr) | 171.9 | 178.2 | 184.6 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Granite | Rock | Extremely weathered (XW) | 159.1 | 165.5 | 171.9 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Granite | Rock | Distinctly weathered (DW) | 165.5 | 168.7 | 171.9 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Granite | Rock | Slightly weathered (SW) | 171.9 | 175.1 | 178.2 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Granite | Rock | Fresh (Fr) | 178.2 | 181.4 | 184.6 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Basalt | Rock | Extremely weathered (XW) | 127.3 | 136.8 | 146.4 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Basalt | Rock | Distinctly weathered (DW) | 146.4 | 155.9 | 165.5 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Basalt | Rock | Slightly weathered (SW) | 159.1 | 168.6 | 178.2 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Basalt | Rock | Fresh (Fr) | 171.9 | 181.4 | 191 | pcf | LOOK T9.2, p.128 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Dry unit weight | Sands and gravels | GW-SP | Very loose | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Very loose | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Loose | 95.5 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Loose | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Medium dense | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Medium dense | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Dense | 121 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Dense | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Very dense | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Very dense | 140 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Loose, uniformly graded | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Loose, uniformly graded | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Loose, well graded | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Loose, well graded | 121 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Dense, uniformly graded | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Dense, uniformly graded | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Dense, well graded | 121 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Dense, well graded | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – hard sedimentary (conglomerate, sandstone) | Rockfill | Compacted | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – hard sedimentary (conglomerate, sandstone) | Rockfill | Compacted | 121 | pcf | LOOK T7.3, p.104 | ||
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Very loose | 108.2 | 111.4 | 114.6 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Very loose | 82.8 | 85.9 | 89.1 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Loose | 114.6 | 117.8 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Loose | 89.1 | 92.3 | 95.5 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Medium dense | 121 | 124.2 | 127.3 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Medium dense | 95.5 | 105 | 114.6 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Dense | 127.3 | 133.7 | 140 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Dense | 108.2 | 117.8 | 127.3 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Very dense | 140 | 143.2 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Very dense | 127.3 | 133.7 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Poorly graded sands | SP | Natural | 108.2 | 114.6 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Poorly graded sands | SP | Natural | 82.8 | 89.2 | 95.5 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Well-graded sands | SW | Natural | 114.6 | 130.5 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Well-graded sands | SW | Natural | 89.1 | 114.5 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Well-graded sand–gravel mixtures | GW / SW | Natural | 121 | 133.7 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Well-graded sand–gravel mixtures | GW / SW | Natural | 95.5 | 117.8 | 140 | pcf | CB T3.1, p.79 |
| Specific gravity of solids | Quartz sand | SP / SW | 2.65 | – | CB T3.1, p.79 | |||
| Specific gravity of solids | Calcareous sand | SP / SW | 2.64 | 2.675 | 2.71 | – | CB T3.1, p.79 | |
| Dry unit weight of rock | Sandstone | Rock | Extremely weathered (XW) | 114.6 | 124.1 | 133.7 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Distinctly weathered (DW) | 127.3 | 136.8 | 146.4 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Slightly weathered (SW) | 140 | 149.6 | 159.1 | pcf | LOOK T9.2, p.128 |
| Dry unit weight of rock | Sandstone | Rock | Fresh (Fr) | 152.8 | 159.2 | 165.5 | pcf | LOOK T9.2, p.128 |
| Friction angle | Sands | GW-SP | Very loose / loose | 27 | 29.5 | 32 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Medium dense | 32 | 34.5 | 37 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Dense | 37 | 39.5 | 42 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Very dense | 42 | 44.5 | 47 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Loose, uniformly graded | 27 | 28.5 | 30 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Loose, well graded | 30 | 31 | 32 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Dense, uniformly graded | 37 | 38.5 | 40 | deg | LOOK T7.8, p.107 |
| Friction angle | Sands | GW-SP | Dense, well graded | 40 | 41 | 42 | deg | LOOK T7.8, p.107 |
| Friction angle from SPT | Clean medium sand | SP / SW | Very loose (N ≤ 4) | 28 | deg | LOOK T5.4, p.80 | ||
| Friction angle from SPT | Clean medium sand | SP / SW | Loose (N = 4–10) | 28 | 29 | 30 | deg | LOOK T5.4, p.80 |
| Friction angle from SPT | Clean medium sand | SP / SW | Medium dense (N = 10–30) | 30 | 35 | 40 | deg | LOOK T5.4, p.80 |
| Friction angle from SPT | Clean medium sand | SP / SW | Dense (N = 30–50) | 40 | 42.5 | 45 | deg | LOOK T5.4, p.80 |
| Friction angle from SPT | Clean medium sand | SP / SW | Very dense (N > 50) | 45 | 47.5 | 50 | deg | LOOK T5.4, p.80 |
| Friction angle | Uniform sand, round grains | Loose | 27 | deg | CB T6.4, p.159 | |||
| Friction angle | Uniform sand, round grains | Dense | 34 | deg | CB T6.4, p.159 | |||
| Friction angle | Well-graded sand, angular grains | Loose | 33 | deg | CB T6.4, p.159 | |||
| Friction angle | Well-graded sand, angular grains | Dense | 45 | deg | CB T6.4, p.159 | |||
| Friction angle | Sandy gravel | Loose | 35 | deg | CB T6.4, p.159 | |||
| Friction angle | Sandy gravel | Dense | 50 | deg | CB T6.4, p.159 | |||
| Friction angle | Silty sand | Loose | 27 | 30 | 33 | deg | CB T6.4, p.159 | |
| Friction angle | Silty sand | Dense | 30 | 32 | 34 | deg | CB T6.4, p.159 | |
| Friction angle (compacted) | Well-graded sand–gravel | GW | Compacted to standard Proctor MDD | 38 | deg | CB T6.5, p.159 | ||
| Friction angle (compacted) | Poorly graded sand–gravel | GP | Compacted to standard Proctor MDD | 37 | deg | CB T6.5, p.159 | ||
| Friction angle (compacted) | Well-graded clean sand | SW | Compacted to standard Proctor MDD | 38 | deg | CB T6.5, p.159 | ||
| Friction angle (compacted) | Poorly graded clean sand | SP | Compacted to standard Proctor MDD | 37 | deg | CB T6.5, p.159 | ||
| Effective friction angle (compacted) | Silty sands, sand–silt mix | SM | Compacted to standard Proctor MDD | 34 | deg | CB T6.3, p.158 | ||
| Effective friction angle (compacted) | Clayey sands, sand–clay mix | SC | Compacted to standard Proctor MDD | 31 | deg | CB T6.3, p.158 | ||
| Undrained shear strength (compacted) | Silts, sands, sand–silt mix | SM | As compacted (standard Proctor MDD) | 1,044 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Silts, sands, sand–silt mix | SM | Saturated after compaction | 418 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey sands, sandy clay mix | SC | As compacted (standard Proctor MDD) | 1,566 | psf | CB T6.1, p.145 | ||
| Undrained shear strength (compacted) | Clayey sands, sandy clay mix | SC | Saturated after compaction | 209 | psf | CB T6.1, p.145 | ||
| Void ratio (natural) | Loose uniform sand | Natural state | 0.8 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Loose uniform sand | Natural state | 30 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Loose uniform sand | Natural state | 92 | pcf | DASP T3.2, p.76 | |||
| Void ratio (natural) | Dense uniform sand | Natural state | 0.45 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Dense uniform sand | Natural state | 16 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Dense uniform sand | Natural state | 115 | pcf | DASP T3.2, p.76 | |||
| Void ratio (natural) | Loose angular-grained silty sand | Natural state | 0.65 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Loose angular-grained silty sand | Natural state | 25 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Loose angular-grained silty sand | Natural state | 102 | pcf | DASP T3.2, p.76 | |||
| Void ratio (natural) | Dense angular-grained silty sand | Natural state | 0.4 | – | DASP T3.2, p.76 | |||
| Natural water content (saturated) | Dense angular-grained silty sand | Natural state | 15 | % | DASP T3.2, p.76 | |||
| Dry unit weight | Dense angular-grained silty sand | Natural state | 121 | pcf | DASP T3.2, p.76 | |||
| Saturated unit weight | Sand | 114.6 | 120.9 | 127.3 | pcf | BUDHU T4.1, p.71 | ||
| Dry unit weight | Sand | 82.8 | 92.3 | 101.9 | pcf | BUDHU T4.1, p.71 | ||
| Density index (relative density) | Sand | SP-SW | Very loose (N = 0–4) | 0 | 7.5 | 15 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Very loose (N = 0–4) | 0 | 1.5 | 3 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Loose (N = 4–10) | 15 | 25 | 35 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Loose (N = 4–10) | 3 | 5.5 | 8 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Medium dense (N = 10–30) | 35 | 50 | 65 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Medium dense (N = 10–30) | 8 | 16.5 | 25 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Dense (N = 30–50) | 65 | 75 | 85 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Dense (N = 30–50) | 25 | 33.5 | 42 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Very dense (N > 50) | 85 | 92.5 | 100 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Very dense (N > 50) | 42 | 50 | 58 | blows/ft | CRAIG T8.3, p.309 |
| Drained friction angle | Sand | SP-SW | Rounded grains, loose | 27 | 28.5 | 30 | deg | DASP T12.1, p.383 |
| Drained friction angle | Sand | SP-SW | Rounded grains, medium | 30 | 32.5 | 35 | deg | DASP T12.1, p.383 |
| Drained friction angle | Sand | SP-SW | Rounded grains, dense | 35 | 36.5 | 38 | deg | DASP T12.1, p.383 |
| Drained friction angle | Sand | SP-SW | Angular grains, loose | 30 | 32.5 | 35 | deg | DASP T12.1, p.383 |
| Drained friction angle | Sand | SP-SW | Angular grains, medium | 35 | 37.5 | 40 | deg | DASP T12.1, p.383 |
| Drained friction angle | Sand | SP-SW | Angular grains, dense | 40 | 42.5 | 45 | deg | DASP T12.1, p.383 |
| Drained friction angle | Gravel with some sand | GW-GP | 34 | 41 | 48 | deg | DASP T12.1, p.383 | |
| Critical-state friction angle | Gravel and sand with fine-grained soils | GM-SC | Critical state | 28 | 30.5 | 33 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Gravel and sand with fine-grained soils | GM-SC | Peak | 30 | 35 | 40 | deg | BUDHU T10.3, p.300 |
| Critical-state friction angle | Sand | SW-SP | Critical state | 27 | 32 | 37 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Sand | SW-SP | Peak | 32 | 41 | 50 | deg | BUDHU T10.3, p.300 |
| Critical-state friction angle | Silt or silty sand | ML / SM | Critical state | 24 | 28 | 32 | deg | BUDHU T10.3, p.300 |
| Peak friction angle | Silt or silty sand | ML / SM | Peak | 27 | 31 | 35 | deg | BUDHU T10.3, p.300 |
| Presumed allowable bearing value (BS 8004) | Dense gravel, or dense sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 12.5 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Medium dense gravel, or sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 4.2 | 8.3 | 12.5 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Loose gravel, or sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 4.2 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Compact sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 6.3 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Medium dense sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 2.1 | 4.2 | 6.3 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Loose sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 2.1 | ksf | CURTIN T1.1, p.5 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
This chapter covers the two coarse ends of the ground spectrum. Sand (USCS SW, SP, SM, SC) is free-draining, gains strength from friction and density, and is the basis of good subballast and embankment fill. Rock is the bedrock and boulder ground of cuts, tunnels and foundations, whose behavior is controlled less by the strength of the intact rock than by its joints, bedding, weathering and water.
| Material | Hazard | Where it shows up |
|---|---|---|
| Loose sand | Settlement under vibration and repeated loading; liquefaction when saturated | New fills, loose natural sand under track, seismic regions |
| Sand at waterways | Scour and erosion | Bridge piers and abutments, culvert outlets, river-bank alignments |
| Sand below the water table | Running and flowing sand in excavations; boiling | Culvert replacements, foundation excavations, undercutting |
| Wind-blown sand | Ballast fouling and burial of track | Desert and coastal lines |
| Rock cuts | Rockfall, planar and wedge sliding, toppling | Mountain and river-valley alignments |
| Weak and degradable rock | Slaking, swelling and softening of shale and mudstone | Cut faces, shale fill, shale subgrade |
| Soluble rock | Karst voids and sinkholes | Limestone, dolomite, gypsum terrain |
Sand is soil with more than half of its coarse fraction passing the No. 4 sieve (0.19 in.) and retained on the No. 200 sieve (0.0029 in.). The USCS groups depend on grading and fines content (ASTM D2487):
| Group | Fines (passing No. 200) | Grading or fines criteria | Description |
|---|---|---|---|
| SW | < 5% | Cu ≥ 6 and 1 ≤ Cc ≤ 3 | Well-graded sand |
| SP | < 5% | Not meeting SW | Poorly graded (uniform) sand |
| SW-SM, SP-SM, SW-SC, SP-SC | 5–12% | Dual symbols | Sand with silt or clay |
| SM | > 12% | Fines classify ML or MH | Silty sand |
| SC | > 12% | Fines classify CL or CH | Clayey sand |
Eq. 2.7-1 (coefficients of uniformity and curvature)
Grain shape (angular to rounded) and mineralogy matter: angular quartz sand has a higher friction angle than rounded sand at the same density, and calcareous or micaceous sands are more compressible and crushable than quartz sand.
The strength and stiffness of clean sand depend mainly on relative density and confining stress. Relative density is estimated from SPT or CPT because undisturbed sampling of sand is impractical.
Eq. 2.7-2 (definition; Idriss and Boulanger 2008 estimate)
Eq. 2.7-3 (Bolton 1986, triaxial; p′ = mean effective stress in psf; use 5 IR for plane strain)
| Sand | φ′cv (deg) |
|---|---|
| Rounded quartz sand | 30–32 |
| Subangular quartz sand | 32–34 |
| Angular quartz sand | 34–37 |
| Feldspathic or crushed rock sand | 36–40 |
| Micaceous sand | 28–31 |
After Bolton (1986) and Kulhawy and Mayne (1990). Add the dilatancy term of Eq. 2.7-3 for peak strength.
Density classes and the corresponding φ′, unit weight and modulus from blow counts are tabulated in Appendix D, Section D.2.
Settlement of footings and fills on sand is mostly immediate; Schmertmann's strain-influence method with Es from CPT or SPT is the usual approach (Chapter 6.2, Section 6.2.3). Loose sand under track also settles from vibration and repeated loading, and saturated loose sand can liquefy in earthquakes (Chapter 6.5).
Eq. 2.7-4 (Hazen, with C = 100 in cm units; valid for clean sand with D10 about 0.004 to 0.1 in. and Cu < 5)
| Material | D10 (in.) | k (ft/day) | Drainage |
|---|---|---|---|
| Clean gravel (GP) | > 0.1 | > 3,000 | Excellent |
| Coarse sand (SP) | 0.02–0.04 | 300–3,000 | Excellent |
| Medium sand (SP) | 0.008–0.02 | 30–300 | Good |
| Fine sand (SP) | 0.003–0.008 | 3–30 | Good to fair |
| Silty sand (SM) | < 0.003 | 0.03–3 | Poor |
| Clayey sand (SC) | — | 0.0003–0.03 | Practically impervious |
Hazen is an order-of-magnitude estimate; field pumping or slug tests govern dewatering design (Chapter 2.8, Section 2.8.4).
Subballast and drainage layers must be permeable enough to drain and fine enough to filter the subgrade. Apply the filter criteria in Chapter 2.4, Section 2.4.7 (retention D15F ≤ 4 to 5 d85B for sandy base soils, permeability D15F ≥ 4 to 5 d15B).
| Hazard | Mechanism | Signs | Response |
|---|---|---|---|
| Scour | Flowing water removes sand from around piers, abutments and culvert outlets; fine sand has the lowest critical velocity of any soil (about 1 ft/s) | Exposed footings, holes at outlets, settlement of approach fills after floods | Scour evaluation (FHWA HEC-18), riprap or articulated mats on a filter, deeper foundations |
| Running and flowing sand | Upward seepage into an excavation below the water table reduces effective stress to zero (quick condition at ic ≈ 1) | Sand boils; sides of trench collapse; loss of ground under adjacent track | Dewater ahead of excavation (wellpoints), sheeting, tremie concrete |
| Vibration settlement of loose sand | Train vibration densifies loose, dry or moist sand | Gradual settlement concentrated over loose fill | Densify during construction; compaction control |
| Liquefaction | Cyclic loading of loose saturated sand | Sand boils, lateral spread after earthquakes | Chapter 6.5 |
| Wind-blown sand | Sand drifts onto track and fills ballast voids | Fouled ballast, buried rail | Fencing, vegetation, stabilizers, sand-shedding structures, more frequent ballast cleaning |
| Erosion of sand slopes | Rainfall runoff and seepage on uncemented sand | Rills and gullies, slumping at seepage faces | Vegetation, erosion mats, toe drains, flatter slopes (2H:1V or flatter) |






Rock is described by its type (origin and mineralogy), its intact strength, its weathering grade and the spacing and condition of its discontinuities. Log all four on every core run (ASTM D5878; Chapter 4.1, Section 4.1.5; Chapter 2.2, Section 2.2.6).
| Grade | Term | Description |
|---|---|---|
| I | Fresh | No visible sign of weathering; perhaps slight discoloration on discontinuities |
| II | Slightly weathered | Discoloration of rock and discontinuity surfaces |
| III | Moderately weathered | Less than half of the rock is decomposed or disintegrated to soil |
| IV | Highly weathered | More than half of the rock is decomposed or disintegrated to soil |
| V | Completely weathered | All rock is decomposed to soil; original structure largely intact |
| VI | Residual soil | All rock converted to soil; structure and fabric destroyed |
| RQD (%) | Rock quality |
|---|---|
| 0–25 | Very poor |
| 25–50 | Poor |
| 50–75 | Fair |
| 75–90 | Good |
| 90–100 | Excellent |
RQD = percent of the core run made up of intact pieces 4 in. or longer, measured on NX-size (about 2-in.) core or larger.
| Rock type | Unconfined compressive strength, qu (psi) | Unit weight (pcf) | Young's modulus (106 psi) | Hoek-Brown mi |
|---|---|---|---|---|
| Granite | 15,000–35,000 | 160–170 | 4–10 | 32 ± 3 |
| Basalt | 15,000–45,000 | 170–185 | 5–12 | 25 ± 5 |
| Gneiss | 12,000–30,000 | 165–175 | 4–10 | 28 ± 5 |
| Quartzite | 20,000–45,000 | 160–170 | 6–12 | 20 ± 3 |
| Limestone | 5,000–30,000 | 150–170 | 3–10 | 9 ± 2 |
| Dolomite | 8,000–35,000 | 160–175 | 4–12 | 9 ± 3 |
| Sandstone | 3,000–25,000 | 135–165 | 1–6 | 17 ± 4 |
| Siltstone | 3,000–15,000 | 140–165 | 1–4 | 7 ± 2 |
| Shale and mudstone | 500–12,000 | 135–160 | 0.2–3 | 4–6 |
| Slate | 10,000–30,000 | 165–175 | 3–10 | 7 ± 4 |
| Schist | 5,000–20,000 | 160–175 | 2–8 | 12 ± 3 |
Ranges compiled from Hoek (2007), Wyllie and Mah (2004) and Kulhawy and Mayne (1990). Strength varies with weathering, moisture and direction relative to foliation or bedding.
| Grade | Description | qu (psi) | Field identification |
|---|---|---|---|
| R0 | Extremely weak | 35–150 | Indented by thumbnail |
| R1 | Very weak | 150–725 | Crumbles under firm blows of a geological hammer; peeled by pocketknife |
| R2 | Weak | 725–3,600 | Peeled by pocketknife with difficulty; shallow indentation by hammer point |
| R3 | Medium strong | 3,600–7,250 | Cannot be scraped by pocketknife; fractured by a single firm hammer blow |
| R4 | Strong | 7,250–14,500 | Requires more than one hammer blow to fracture |
| R5 | Very strong | 14,500–36,000 | Requires many hammer blows to fracture |
| R6 | Extremely strong | > 36,000 | Can only be chipped with a hammer |
Eq. 2.7-5 (point load index, ASTM D5731, withdrawn 2025; the factor ranges from about 15 to 25 and is lower for shales and weak rocks; calibrate with ASTM D7012 tests)
The strength of a rock mass is controlled by its discontinuities. Rock mass classification systems turn core logs and face mapping into a rating used for cut slopes, foundations and tunnels.
| Parameter | Rating range |
|---|---|
| Intact strength (qu) | 0–15 |
| RQD | 3–20 |
| Discontinuity spacing | 5–20 |
| Discontinuity condition (roughness, aperture, infill, weathering, persistence) | 0–30 |
| Groundwater | 0–15 |
| Adjustment for discontinuity orientation (slopes, foundations, tunnels) | 0 to −60 |
Rock mass classes: 81–100 very good (I); 61–80 good (II); 41–60 fair (III); 21–40 poor (IV); < 21 very poor (V). GSI ≈ RMR89 − 5 for RMR89 > 23 (Hoek 2007).
Eq. 2.7-6 (generalized Hoek-Brown criterion; mb, s and a from GSI, mi and disturbance factor D; Hoek, Carranza-Torres and Corkum 2002)
Eq. 2.7-7 (Barton and Choubey 1977)
Where:
| Surface | Friction angle (deg) |
|---|---|
| Clean, rough, fresh joints in hard rock | 35–45 (plus roughness) |
| Planar, smooth joints and bedding in hard rock | 28–35 |
| Joints in shale, schist and slate | 20–30 |
| Joints with thin clay coating | 15–25 |
| Clay-filled faults and bedding shears in shale | 8–15 (residual) |
After Wyllie and Mah (2004) and Hoek (2007).
| Mode | Kinematic condition | Typical railroad setting |
|---|---|---|
| Planar sliding | Plane strikes within about 20° of the face; dips less than the face (daylights) and more than its friction angle | Bedded sandstone and limestone cuts dipping toward the track |
| Wedge sliding | Line of intersection of two joints plunges less than the face and more than the friction angle, toward the track | Jointed igneous and metamorphic cuts |
| Toppling | Steeply dipping joints striking within about 20° of the face, dipping into the slope | Slate, schist and columnar basalt |
| Rockfall and raveling | Loosening of blocks by freeze-thaw, roots and water; undercutting of hard rock over weak rock | Most rock cuts; worst in spring thaw and heavy rain |
| Circular failure in rock mass | Heavily fractured or weak rock acting like soil | Highly weathered rock and soft shale cuts |
Eq. 2.7-8 (Hoek and Bray 1981; per foot of slope length)
Where:
Railroads commonly rate rock cuts with the Rockfall Hazard Rating System (RHRS; Pierson, Davis and Van Vickle 1990; FHWA 1993), adapted for track: slope height, ditch effectiveness, exposure of trains, sight distance, geologic character, block size, climate and rockfall history. Mitigation includes scaling, rock bolts and dowels, shotcrete, draped and anchored mesh, rockfall fences and barriers, widened catchment ditches and slide-detector fences tied to signals. The rating fits the GHSR risk framework of Chapter 3.8.
| Rock | Problem | Tests | Engineering response |
|---|---|---|---|
| Shale, mudstone, claystone | Slaking and softening on wetting and drying; swelling; low residual strength on bedding | Slake durability (ASTM D4644, withdrawn 2025): Id2 < 60% low durability; jar slake test; Atterberg limits of slaked material | Treat as soil in fills (compact in thin lifts, break down); protect cut faces; use fully softened or residual strength |
| Pyritic shale and slate | Oxidation of pyrite causes heave, acid drainage and sulfate attack | Sulfur and sulfate content; pH | Avoid in fill near structures; sulfate-resistant concrete; acid drainage control |
| Limestone, dolomite, gypsum (karst) | Solution cavities, sinkholes, pinnacled rock surface, collapse of soil cover | Geophysics (ERT, MASW, GPR), closely spaced probes, coring | Grouting, bridging slabs or geogrid, drainage control (do not concentrate water), avoid ponding in ditches |
| Weathered granite and gneiss (saprolite) | Corestones and boulders in soil matrix; variable depth to rock | Seismic refraction; borings with coring | Plan excavation for boulders; bearing on variable surface |
| Volcanic tuff and ash | Low density; may slake or collapse | Unit weight, slake durability | As for weak rock |
See Chapter 3.8, Section 3.8.5 for subsidence and karst collapse mechanisms.
Seismic P-wave velocity from refraction surveys (Chapter 5.1, Section 5.1.7) is the usual first indication of how rock can be excavated: velocities below about 4,000 to 5,000 ft/s are generally rippable with large dozers, about 5,000 to 8,000 ft/s may be marginal, and higher velocities usually need blasting. The limits depend on the equipment and on joint spacing; check against manufacturer rippability charts and test excavations.
| Eq. | Quantity | Expression | Use and limits |
|---|---|---|---|
| 2.7-1 | Grading coefficients | Cu = D60/D10; Cc = D302/(D10D60) | USCS SW/SP |
| 2.7-2 | Relative density | Dr = (emax − e)/(emax − emin); Dr ≈ √[(N1)60/46] | Clean sand |
| 2.7-3 | Peak friction angle | φ′ = φ′cv + 3IR | Bolton (1986), triaxial |
| 2.7-4 | Hazen permeability | k (ft/day) ≈ 1.8×106 D102 (in.) | Clean sand; order of magnitude |
| 2.7-5 | Point load correlation | qu ≈ 24 Is(50) | Calibrate; lower for shale |
| 2.7-6 | Hoek-Brown | σ1′ = σ3′ + σci(mbσ3′/σci + s)a | Rock mass |
| 2.7-7 | Barton joint strength | τ = σn tan[φr + JRC log(JCS/σn)] | Unfilled joints |
| 2.7-8 | Planar sliding FS | See Section 2.7.8 | Hoek and Bray (1981) |
The friction angle of a sand is not a fixed property: it rises with density and falls with confining stress, because dense sand must dilate to shear and high stress suppresses dilation. Bolton’s relative dilatancy index captures both effects in one number.
| Variable | Value | Description |
|---|---|---|
| φ′cv | 33° | Critical-state friction angle, subangular quartz sand |
| Dr | 70% (0.70) | Relative density |
| p′ | 2,000 psf | Mean effective stress |
| pref | 20.9 psf (1 kPa) | Unit stress for the logarithm, so p′ enters in kPa |
IR = 2.81 and the peak triaxial friction angle is about 41°.
Eight degrees of the 41° come from dilation, not from friction between grains. For a shallow foundation, adopt a value 2° to 4° lower to allow for scatter and progressive failure; for a problem governed by large strains, the critical-state 33° is the safer value.
A culvert replacement excavation goes below the water table in clean medium sand. Hazen’s correlation from D10 gives a first estimate of permeability, which decides whether the excavation can be pumped from a sump or needs wellpoints.
| Variable | Value | Description |
|---|---|---|
| D10 | 0.006 in. (0.0152 cm), about the No. 100 sieve | Effective grain size |
| Soil | Clean medium sand | Hazen applies to clean sands |
k ≈ 65 ft/day (about 0.02 cm/s).
That is permeable enough that the excavation will meet running sand below the water table unless the water is drawn down first. Plan wellpoints, and confirm k with a pumping or slug test, because Hazen’s estimate can be off by a factor of 2 or more.
A bedding plane dips toward the track and daylights at the toe of a rock cut. The kinematic check says whether the block can slide; the limit-equilibrium check says how close it is; and solving for anchor force says what it would take to fix it.
| Variable | Value | Description |
|---|---|---|
| H | 30 ft | Cut height |
| ψf | 70° | Face angle |
| ψp | 40° | Dip of the bedding plane toward the track |
| γ | 160 pcf | Rock unit weight |
| c, φ | 200 psf; 30° | Bedding plane strength |
| Water | Dry; no tension crack | U = V = 0 |
| FStarget | 1.3 | For bolting |
Planar sliding is possible and FS = 0.93. Bolts normal to the plane must supply about 24,400 lb per foot of cut to reach FS = 1.3.
The block stands today only because of 200 psf of cohesion on the bedding, which weathering and a single freeze-thaw cycle can destroy. Water would make it worse: add horizontal drains so a tension crack full of water cannot cancel the bolting, and check the wedges formed where cross joints intersect the bedding.
The core log gives each of the five RMR parameters; the rating is their sum. The same log gives GSI, which feeds the Hoek-Brown strength used in slope and foundation design.
| Variable | Value | Description |
|---|---|---|
| qu | 12,000 psi (83 MPa) | Slightly weathered limestone |
| RQD | 65% | |
| Spacing | 1 to 2 ft (300 to 600 mm) | Joint spacing |
| Condition | Slightly rough, aperture under 1/25 in., slightly weathered walls | |
| Water | Damp | |
| Rating tables | Table 2.7-15 (Bieniawski 1989) | Strength, RQD, spacing, condition, groundwater and orientation ratings |
RMR89 = 65, Class II (good rock), before the orientation adjustment; GSI ≈ 65.
The orientation adjustment, applied for the actual cut or foundation, can lower the class substantially, as Example 2.2-3 showed. GSI deliberately excludes water and orientation, because Hoek-Brown analyses handle those explicitly.
| Material | γ (pcf) | Strength | Modulus | k (ft/day) | Notes |
|---|---|---|---|---|---|
| Loose SP sand | 95–110 | φ′ 29–31° | Es 200–500 ksf | 3–300 | Settles under vibration; liquefiable when saturated |
| Medium dense SP/SW sand | 105–120 | φ′ 31–36° | Es 500–1,000 ksf | 3–300 | Good fill and subballast source |
| Dense SW sand | 115–130 | φ′ 36–41° | Es 1,000–1,700 ksf | 3–300 | — |
| Silty sand SM | 110–125 | φ′ 29–34° | Es 300–800 ksf | 0.03–3 | Frost susceptible; see Chapter 2.4 |
| Shale (weak rock) | 135–155 | qu 500–5,000 psi; joints 20–30° | 0.2–1×106 psi | — | Slakes; treat as soil when weathered |
| Sandstone (medium strong) | 140–160 | qu 5,000–15,000 psi | 1–4×106 psi | — | Bedding-controlled sliding |
| Limestone (strong) | 155–170 | qu 8,000–25,000 psi | 3–8×106 psi | — | Karst |
| Granite (very strong) | 160–170 | qu 15,000–35,000 psi | 4–10×106 psi | — | Joint-controlled wedges; rockfall |
Starting values only; replace with test data and mapping.
Checklist · Part X · Problem Soils
A Class I railroad wants to use sand from a borrow pit on its right-of-way as embankment fill for a new siding. A gradation test gave the grain sizes shown, with 3% fines. The engineer must classify the sand and comment on its use as fill.
A gradation-only classification: with 3% fines the sand gets a single symbol.
| Variable | Value | Description |
|---|---|---|
| D10, D30, D60 | 0.006, 0.012 and 0.024 in. | |
| Fines | 3% | Less than 5% |
SP, poorly graded sand.
A Cu of 4 means a narrow range of grain sizes. Uniform sands drain well but compact poorly and are prone to running below the water table.
Rock core from a cut on a Class I railroad was tested at the drill rig with a point load tester, giving the size-corrected index shown. The engineer must estimate the unconfined compressive strength and the ISRM strength grade for the cut design.
The point load test is a quick field substitute for the uniaxial compressive test.
| Variable | Value | Description |
|---|---|---|
| Is(50) | 400 psi | Size-corrected point load index |
| Factor | 24 | Typical conversion; it ranges from about 15 to 25 for different rocks |
qu ≈ 9,600 psi (66 MPa), ISRM grade R4, strong.
The conversion factor varies by rock type, so calibrate it with a few uniaxial tests on the same core before using point load results for design.
Blocks are sliding on a rough joint set in a rock cut above a Class I railroad main line. The joint has the residual friction angle, roughness and wall strength shown, and the normal stress on the joint is low. The engineer must find the friction angle of the joint for the stability analysis.
Barton’s criterion adds a roughness term to the residual friction angle; the term is largest at low normal stress, which is the condition in most rock slopes along track.
| Variable | Value | Description |
|---|---|---|
| φr | 28° | Residual friction angle |
| JRC | 6 | Joint roughness coefficient |
| JCS | 5,000 psi | Joint wall compressive strength |
| σn | 50 psi | Normal stress |
φ = 40°.
Roughness adds 12° at this low stress. At 500 psi the term would be 6 × 1 = 6°, so the friction angle measured in a high-stress laboratory test can understate the strength of a shallow block and overstate that of a deep one.
| Topic | Refer To |
|---|---|
| Subsidence and karst mechanisms | Chapter 3.8, Section 3.8.5 |
| Rock coring and RQD | Chapter 4.1, Section 4.1.5 |
| Seismic refraction and MASW | Chapter 5.1, Sections 5.1.6–5.1.7 |
| Rock classification | Chapter 2.2, Section 2.2.6 |
| Field permeability testing and dewatering | Chapter 2.8, Sections 2.8.4–2.8.6 |
| Rock cut slope design | Chapter 6.3, Section 6.3.7 |
| Liquefaction | Chapter 6.5 |
| Risk rating of rockfall and slope hazards | Chapter 3.8 |
| Typical values for sands from blow counts | Appendix D, Section D.2 |
The USACE manual Rock Foundations (EM 1110-1-2908) describes the Geomechanics Classification (RMR) and the Q-system and recommends trying more than one, because the classification itself forces a systematic look at strength, jointing, condition and water. For railroad cuts and bridge foundations on rock the RMR is the more convenient: its five basic parameters come straight from core logs and outcrop mapping, and through GSI it leads to the Hoek-Brown strength and modulus needed for slope and foundation analysis.
| Parameter | Ratings |
|---|---|
| Intact strength (UCS) | >36,000 psi: 15; 14,500–36,000: 12; 7,250–14,500: 7; 3,600–7,250: 4; 725–3,600: 2; 145–725: 1; <145: 0 |
| RQD | 90–100%: 20; 75–90: 17; 50–75: 13; 25–50: 8; <25: 3 |
| Discontinuity spacing | >6.6 ft: 20; 2–6.6 ft: 15; 8–24 in.: 10; 2.4–8 in.: 8; <2.4 in.: 5 |
| Discontinuity condition | 30, 25, 20, 10 or 0 from very rough and tight to open with soft gouge |
| Groundwater | Dry 15; damp 10; wet 7; dripping 4; flowing 0 |
| Orientation adjustment (slopes) | 0, −5, −25, −50, −60 from very favorable to very unfavorable |
Equation 2.7-9. GSI and generalized Hoek-Brown parameters
mb = mi exp[(GSI − 100)/(28 − 14D)]; s = exp[(GSI − 100)/(9 − 3D)]; a = ½ + (e−GSI/15 − e−20/3)/6
Equation 2.7-10. Rock mass modulus (Hoek and Diederichs)
| Input | Value | Result | Value |
|---|---|---|---|
| UCS, RQD | 8,000 psi, 62% | Basic / adjusted RMR | 60 / 55 |
| Joint spacing, condition | 10 in., slightly rough, highly weathered | Class | III — Fair |
| Groundwater, orientation | Damp, favorable | GSI | 60 |
| mi, disturbance D | 17, 0.7 (good blasting) | mb, s, a | 1.888, 0.00304, 0.503 |
| Rock mass modulus | 482 ksi |
Open the rock mass calculator →
RMR89 from five parameters plus orientation, rock mass class with c and φ ranges, GSI, Hoek-Brown mb, s, a, rock mass strength and modulus, and the failure envelope.
This is the cut of Table 2.7-16, worked by hand. It goes from the five RMR parameters to the Hoek-Brown constants and the rock mass modulus, which is the chain an analysis program needs.
| Variable | Value | Description |
|---|---|---|
| UCS | 8,000 psi (55 MPa) | Sandstone |
| RQD | 62% | |
| Spacing | 10 in. | Joint spacing |
| Condition | Slightly rough, highly weathered walls | |
| Water | Damp | |
| Orientation | Favorable for slopes | |
| mi | 17 | Intact rock constant, sandstone |
| D | 0.7 | Disturbance, good blasting |
| Ei | 2,400 ksi | Intact modulus: modulus ratio 300 × UCS, as used by the calculator |
| Rating tables | Table 2.7-15 (Bieniawski 1989) | Strength, RQD, spacing, condition, groundwater and orientation ratings |
Basic RMR 60, adjusted 55 (Class III, fair); GSI 60; mb = 1.888, s = 0.00304, a = 0.503; Erm = 482 ksi.
Blast damage (D = 0.7) cuts the rock mass modulus to about a fifth of the intact value and lowers s by a factor of about 20 compared with undisturbed rock. Controlled blasting near the final face is worth specifying for that reason alone.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.
Section 3.4.9 screens a cut for wedges that can slide; this section computes how close one of them is to sliding. Wyllie and Mah's Rock Slope Engineering (Appendix III) gives the full vector solution first published by Hoek and Bray, which is the basis of the common wedge programs. The wedge is bounded by two slide planes, the upper slope, the face and an optional tension crack. Each slide plane has its own cohesion and friction, the wedge and crack can be full of water, and anchor and seismic forces can be added. The solution also checks whether contact is kept on both planes or lost on one, which changes the mode of sliding. Kliche's Rock Slope Stability and the FHWA Rock Slopes manual cover the same analysis and the field data it needs.
Equation 2.7-11. Factor of safety with contact on both planes
FS = (N1 tanφ1 + N2 tanφ2 + c1A1 + c2A2) / ν(W iz − T w − E we − V w5)
The vectors and coefficients are those of Wyllie and Mah's equations III.1 to III.80, built from the dip and dip direction of each plane. Water pressure is the average for a fully saturated wedge with the water table at the upper surface. Partial saturation is modeled, as Wyllie and Mah suggest, by reducing the unit weight of water in proportion. The minimum anchor tension for a target factor of safety, and the anchor's best orientation, follow from equations III.105 to III.111.
| Quantity | Published | Calculator |
|---|---|---|
| Line of intersection, plunge / trend | 31.20° / 157.73° | 31.20° / 157.73° |
| Wedge weight | 2.8272 × 107 lb | 2.8272 × 107 lb |
| FS, saturated with tension crack | 1.1378 | 1.1378 |
| FS, dry | 1.7360 | 1.7356 |
| Minimum anchor tension for FS = 1.5 | 3.4307 × 106 lb | 3.4305 × 106 lb |
The Appendix III wedge is 100 ft high: plane 1 dips 45° toward 105° (c = 500 psf, φ = 20°) and plane 2 dips 70° toward 235° (c = 1,000 psf, φ = 30°), with a tension crack 40 ft behind the crest. It weighs about 14,136 tons. Saturated, its factor of safety is 1.14; drained, 1.74. A seismic coefficient of 0.1 on the saturated wedge lowers it to 0.93. To reach 1.5 saturated takes about 1,715 tons of anchor force, best installed nearly horizontal and pointing back along the line of intersection. Drainage is worth nearly as much as the anchors.
Open the rock wedge calculator →
Hoek and Bray comprehensive wedge solution: geometry, weight, water and tension crack, cohesion and friction on each plane, anchor and seismic forces, contact checks, and the minimum anchor tension at its optimum orientation.
Wyllie and Mah screen wedges first with friction-only charts (their Section 7.5). With no cohesion and no water, the factor of safety does not depend on the size of the wedge, only on its shape and the friction angles: FS = A tanφA + B tanφB, where A and B are read from charts for the dips and dip directions of the two planes. Their guidance is practical. A wedge below 1.0 will probably fail as the cut is made, so the only realistic option is to cut the face no steeper than the line of intersection. Between 1.0 and 2.0 the wedge needs the comprehensive analysis of this section, usually to size bolts. Above 2.0 it can generally be left. Because the calculator solves the general case, setting c = 0 and no water reproduces the friction-only value for any friction angle.
| φ (deg) | FS | Wyllie and Mah guidance |
|---|---|---|
| 20 | 0.90 | Below 1.0: cut at the line of intersection |
| 25 | 1.16 | 1.0 to 2.0: comprehensive analysis and bolting |
| 30 | 1.44 | 1.0 to 2.0: comprehensive analysis and bolting |
| 35 | 1.74 | 1.0 to 2.0: comprehensive analysis and bolting |
| 40 | 2.09 | Above 2.0: generally stable |
The tables below take the saturated Appendix III wedge and vary first the water level and then the anchor force. The anchor is set at the optimum orientation the calculator finds (plunge about 7° upward, trend 349°). Wyllie and Mah give a quick rule for that orientation. Point the anchor back along the line of intersection, viewed from the toe, and incline it so that it makes an angle equal to the average friction angle with that line: plunge ≈ ½(φ1 + φ2) − ψi = 25° − 31.2° = −6.2° (upward), close to the exact −7.0°. Draining the wedge raises its factor of safety from 1.14 to 1.74. Reaching the same gain with anchors would take roughly 2,500 tons of anchor force. Drains, kept working, are the cheaper first step.
| Water (% of saturated) | FS | Anchor force, tons (optimum orientation, saturated) | FS |
|---|---|---|---|
| 0 | 1.74 | 0 | 1.14 |
| 25 | 1.58 | 500 | 1.23 |
| 50 | 1.43 | 1000 | 1.33 |
| 75 | 1.28 | 1500 | 1.45 |
| 100 | 1.14 | 2000 | 1.58 |
| 2500 | 1.73 |
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Folds, faults, shear zones, veins and unconformities control where a rock cut is weak, where water flows and how the orientation of discontinuities changes along the cut. They are best recognized in outcrops and old cuts before excavation, and on the terrain map (Section 3.2.11 in Chapter 3.2). Photographs of each type in road cuts and outcrops are collected in the Atlas of Structural Geology (Mukherjee 2015).
A fold has a hinge, two limbs and an axial plane. Anticlines are arched up and synclines down. Across a folded cut the dip of bedding, and therefore the kinematic hazard, changes: one limb may dip into the cut (planar sliding) while the other dips away (toppling or stable). Tension fractures open along anticline crests; synclines collect water. Thin weak layers between strong beds are often sheared and thinned on the limbs.
A fault zone usually has a fault core of clay-rich gouge, breccia or cataclasite around the principal slip surface, which is polished and striated (slickensides), and a damage zone of intensely fractured and veined rock on either side. Fault zones range from centimeters to more than 100 m wide; one regional fault exposed in a highway cut in limestone has a zone over 100 m wide in which the bedding is obliterated (Mukherjee 2015, after Caine and others).
Ductile shear zones are bands of strongly foliated rock (mylonite) in which the rock has flowed rather than fractured; the foliation forms a weak, closely spaced fabric that controls sliding. Veins are fractures filled with minerals (quartz, calcite, gypsum). Quartz veins are strong; calcite and gypsum veins can be weaker or soluble.
An unconformity is a buried erosion surface that represents a gap in time. A disconformity has parallel layers above and below; an angular unconformity has tilted or folded rocks below flat-lying rocks above; a nonconformity has sedimentary rock over igneous or metamorphic rock (Physical Geology text, Chapter 9). For a cut the surface often carries a weathered zone or old soil, perches water, and separates two rock masses with different discontinuity orientations.
For railroad work: Divide every rock cut into structural domains bounded by fold hinges, faults and unconformities, and run the kinematic analysis and rock mass rating for each domain separately (Sections 2.7.17 and 2.7.18). Map fault zones on the cut face and in the borings, sample the gouge for residual shear strength, and put horizontal drains or relief wells where the fault core dams groundwater behind the face. Where faults cross a cut or tunnel on a line through ultramafic rock, have the rock tested for asbestos before any excavation or ballast production.
Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.