dirtbert.com › GHRM › Manual contents › Appendices
GHRM · Appendices

Appendices

Templates, special provisions, typical soil properties and analytical equations.

4 items

About this section

The appendices hold material used throughout the manual: templates and special provisions, typical soil properties from blow counts, moisture content and liquid limit, the analytical equations, and a cross-reference to the ICE Manual of Geotechnical Engineering.

How it fits: Reference material for all sections.

Chapters

Appendices A–C

Appendices

Reference templates and boilerplate specification language — borehole log (A), laboratory test results (B) and Geotechnical Special Provisions (C).

9 subsections
Appendix D

Typical Soil Properties

Typical values for each soil type from SPT blow counts, moisture content and liquid limit, with sources, limitations and follow-up testing.

13 subsections
Appendix F

Analytical Equations

Standard closed-form equations used across the manual (English units): stresses in soil, track structure, bearing, settlement, slopes, seepage and earth pressure.

11 subsections
Appendix G

ICE Manual Cross-Reference

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.

5 subsections