Subsections
22Primary References: Holtz, Kovacs and Sheahan (2011); Terzaghi, Peck and Mesri (1996); Kulhawy and Mayne (1990), EPRI EL-6800; Boulanger and Idriss (2006, 2007); Bray and Sancio (2006); Idriss and Boulanger (2008), EERI MNO-12; Youd et al. (2001); Robertson and Wride (1998); USACE EM 1110-3-138; NRCS NEH Part 633, Chapter 26; ASTM D2487, D2488, D4318, D4546.
- 2.4.0Executive Summaryopen →
- 2.4.1Background and Railroad Contextopen →
- 2.4.2Identification and Classificationopen →
- 2.4.3Typical Index and Physical Propertiesopen →
- 2.4.4Shear Strengthopen →
- 2.4.5Compressibility, Consolidation and Stiffnessopen →
- 2.4.6Compaction, Moisture Sensitivity and Stabilizationopen →
- 2.4.7Hydraulic Behavior: Erosion, Piping and Pumpingopen →
- 2.4.8Frost Susceptibilityopen →
- 2.4.9Liquefaction and Cyclic Softening of Siltsopen →
- 2.4.10Loess and Collapsible Siltsopen →
- 2.4.11Silts in Railroad Earthworksopen →
- 2.4.12Summary of Equationsopen →
- 2.4.13Worked Examplesopen →
- 2.4.14Representative Data Tableopen →
- 2.4.15Practical Recommendationsopen →
- 2.4.16Silt Investigation and Design Checklistopen →
- 2.4.17Practice Questionsopen →
- 2.4.18Cross-Referencesopen →
- 2.4.19Subballast as a Filter over Silty Subgradeopen →
- 2.4.20Collapse of Embankment Fill on Flooding: the Saturated Oedometer Methodopen →
- ·Author and Sourcesopen →