Subsections
8Most soil mechanics was developed for transported soils: clays, silts and sands laid down by water, ice or wind. Residual soils formed in place by the weathering of rock, and soils in arid climates, follow different rules. Their strength comes partly from relict rock structure or cementation, their properties change gradually with depth rather than at layer boundaries, and their behavior depends heavily on moisture. In North America the most important residual soils are the saprolites of the Piedmont and Blue Ridge, and the most important arid soils are those of the Southwest and Great Basin.
Apps
No apps yet for this chapter.