dirtbert.com › GHRM › 2.0 The Underworld › Chapter 2.12
GHRM · Chapter 2.12

Sulfates, Sulfides and Problem Mudrocks

Ground chemistry that attacks concrete, heaves stabilized subgrades and turns fresh shale into soil within a few seasons of exposure.

Subsections

8

Some ground problems are chemical rather than mechanical. Sulfate in soil and groundwater attacks concrete and reacts with lime and cement to form expansive minerals. Pyrite (iron sulfide) in shale oxidizes when exposed to air and water, producing acid and sulfate and swelling the rock. Many shales and claystones slake and lose strength within months of excavation. This chapter covers how to recognize these conditions, the tests that identify them and the design responses for concrete, stabilization and cut slopes.