About this section
Section 5.0 covers testing: in situ tests run in the ground, laboratory tests on samples, geo-environmental testing of corridor soils, and the field testing and monitoring used during and after construction, including the observational method and trigger-action response plans.
Each test is described by what it is, what information it provides and how that information is used, so the right tests can be chosen for the design question.
Chapters
In Situ Testing
What each in situ test is, what information it provides, and how that information is used in design and risk assessment.
Laboratory Testing Program
Laboratory testing is the scientific foundation of every geotechnical design.
Construction Monitoring and Field Testing
Construction monitoring is the geotechnical consultant's final opportunity to verify that subsurface conditions match design assumptions, that materials meet…
Geo-Environmental Testing on Railroad Corridors
What contaminants to expect in railroad ground, how to sample for them during a geotechnical program, and how to manage drilling waste and spoil.
The Observational Method and Trigger-Action Response Plans
Designing for the most probable conditions, measuring what actually happens, and having the response ready before the measurements arrive.