The reverse index: for each GHRM chapter, the ICE chapters to read alongside it (shown as volume-chapter, e.g. I-32 = Volume I, Chapter 32).
| GHRM | Title | ICE chapters |
|---|---|---|
| Chapter 1.0 | Manual Overview | I-1, I-2, I-3, I-4, I-10, I-11 |
| Chapter 1.1 | Introduction to Railway Ground Hazard Risk Management | I-7, I-40 |
| Chapter 2.1 | Track Foundation Elements | I-12, I-13 |
| Chapter 3.8 | Failure Mechanisms and Triggers | I-23, I-26, I-40 |
| Chapter 2.2 | Soil and Rock Classification | I-13, I-14 |
| Chapter 2.3 | Track Substructure: Ballast, Subballast and Subgrade | I-14, I-24, II-60, II-70, II-76 |
| Chapter 2.4 | Silts: Properties, Typical Values and Liquefaction | I-17, I-31, I-32 |
| Chapter 2.5 | Clays: Properties, Typical Values and Behavior | I-17, I-31, I-33, I-36 |
| Chapter 2.6 | Peats and Organic Soils: Properties, Typical Values and Behavior | I-35 |
| Chapter 2.7 | Rock and Sand: Properties, Typical Values and Behavior | I-18, II-87 |
| Chapter 2.8 | Groundwater Characterization and Seepage | I-15, I-16, II-80 |
| Chapter 2.9 | Collapsible Soils: Identification, Testing and Railroad Impacts | I-28, I-32, II-58 |
| Chapter 2.10 | Non-Engineered Fills: Old Embankments, Waste and Made Ground | I-34, II-58, II-70, II-71 |
| Chapter 2.11 | Soluble Ground and Karst: Sinkholes, Voids and Dissolution | I-38, I-40, I-45, II-90 |
| Chapter 2.12 | Sulfates, Sulfides and Problem Mudrocks | I-36, I-37, II-99 |
| Chapter 2.13 | Residual, Tropical and Arid Soils | I-13, I-29, I-30, I-31, I-33 |
| Chapter 3.1 | Scoping Proposals | I-42, I-44, II-78 |
| Chapter 3.2 | Desktop Study | I-43, I-45 |
| Chapter 3.3 | Drilling Scope | I-44 |
| Chapter 3.4 | Site Review and Reconnaissance | I-43 |
| Chapter 3.5 | Site Conditions | I-40 |
| Chapter 3.6 | Site Accessibility Study | — (railroad-specific; no direct ICE equivalent) |
| Chapter 3.7 | Cost Estimates | I-44 |
| Chapter 3.8 | Risk Ratings | I-7, II-71 |
| Chapter 3.8 | Ground Hazard Risk Assessment | I-7 |
| Chapter 3.9 | Geotechnical Investigation Planning and Scope | I-4, I-8, I-39, I-44 |
| Chapter 3.10 | Mining and Man-Made Hazards | I-8, I-40, I-41, I-43 |
| Chapter 4.1 | Borings and Sampling | I-8, I-46, I-49 |
| Chapter 5.1 | In Situ Testing | I-45, I-47 |
| Chapter 5.2 | Laboratory Testing Program | I-17, I-27, I-49, II-99 |
| Chapter 5.3 | Construction Monitoring and Field Testing | II-75, II-77, II-79, II-82, II-92, II-93, II-94, II-95, II-96, II-97, II-98, II-99 |
| Chapter 5.4 | Geo-Environmental Testing on Railroad Corridors | I-8, I-41, I-48 |
| Chapter 5.5 | The Observational Method and Trigger-Action Response Plans | II-79, II-94, II-95, II-96, II-100 |
| Chapter 6.1 | Foundation Engineering: Bearing Capacity | I-5, I-9, I-21, I-22, II-51, II-52, II-53, II-54, II-55, II-56, II-57, II-81, II-82, II-98 |
| Chapter 6.2 | Settlement Analysis | I-5, I-6, I-19, I-26, II-53 |
| Chapter 6.3 | Slope Stability Analysis | I-6, I-23, II-57, II-69, II-72 |
| Chapter 6.4 | Infiltration and Seepage | I-16, II-80 |
| Chapter 6.5 | Seismic Hazard and Liquefaction | I-24, II-60 |
| Chapter 7.1 | Retaining Structures | I-9, I-20, II-61, II-62, II-63, II-64, II-65, II-66, II-67, II-73, II-74, II-85, II-86, II-88, II-89, II-91 |
| Chapter 7.2 | Ground Improvement Methods | I-11, I-25, II-59, II-72, II-73, II-83, II-84, II-86, II-90 |
| Chapter 7.3 | Pavement Subgrade Evaluation | II-75, II-76 |
| Chapter 7.4 | Earthworks Asset Management and Remedial Design | II-68, II-69, II-70, II-71, II-72, II-87 |
| Chapter 8.1 | Exploration Versus Investigation | I-42 |
| Chapter 8.2 | Change Orders | II-78 |
| Chapter 8.3 | Memorandums | I-50 |
| Chapter 8.4 | Geotechnical Report Preparation | I-50, II-93, II-101 |
| Appendices A–C | Appendices | — (railroad-specific; no direct ICE equivalent) |
| Appendix D | Typical Soil Properties | I-27 |
| Appendix F | Analytical Equations | — (railroad-specific; no direct ICE equivalent) |