This chapter covers the memorandums used on ground hazard and geotechnical work: project update memos, field and reconnaissance memos, technical memos and recommendation addenda. A memorandum is often the most-read document on a job, because it answers one question quickly; that makes its structure and review as important as a full report's.
A memorandum answers a limited question or records a decision, in a few pages. It is the right document when the question is narrow, the audience is the project team, and the answer is needed sooner than a full report allows. Busy readers prefer it: one client's project manager asked that reconnaissance summaries be kept to about one page, with the photographs delivered as a map file rather than pages of prints.
| Type | Purpose | Typical length | Example |
|---|---|---|---|
| Project update memo | Record a change in scope, the reason and the effect | 1 to 3 pages | Borings added at one reach; RFP revised; estimate updated |
| Field or reconnaissance memo | Report what was found on a site visit | 1 to 2 pages plus photo map | Access, clearing, boring relocations, open items |
| Data transmittal | Send logs or laboratory data without interpretation | 1 page plus attachments | Preliminary boring logs for the designer |
| Technical memo | Answer one engineering question | 3 to 10 pages | Stability of steepened slopes at four reaches |
| Recommendation addendum | Add to or revise an issued report | 3 to 10 pages | Memorandum addendum to an earlier final geotechnical report, with new logs and quantities |
| Emergency assessment letter | Give a decision within a day or two of a failure | 2 pages plus photos and a sketch | See Section 8.4.1 |
| Choose a memorandum when | Choose a report when |
|---|---|
| The question is narrow (one reach, one structure, one decision) | The project needs a complete record of conditions and recommendations |
| The audience is the project team | The document will go to bidders, regulators or the public |
| The answer is needed in days | There is time for full review |
| It adds to an issued report | It replaces or stands alone |
| The content is a decision or a change | The content is a design basis |
A memorandum works when the reader gets the answer in the first paragraph. The structure below follows a project update memo used in practice.
| Part | Content |
|---|---|
| Header block | Prepared by, date, project, client and project numbers, subconsultant and key dates |
| 1. Summary | The finding or decision and its effect, in a short paragraph |
| 2. Finding or background | What was found and why it matters, in bullets |
| 3. Details | Tables of borings, quantities, results; figures |
| 4. Changes | What changed from the previous version (for revisions) |
| 5. Cost or schedule effect | Net change and new totals, where relevant |
| 6. Files updated | Where the revised documents and map files are saved |
| 7. Open items | What still needs a decision, and from whom |
| Limitations | What the memo is based on and what it does not cover |
Write in plain sentences with short bullets. Give boring IDs, stations and dates exactly; round quantities sensibly; and keep observation, interpretation and recommendation in separate paragraphs.
Attach only what the reader needs to act: a boring location plan matched in style across figures, preliminary logs, a photo map with clickable photo locations, the revised RFP or estimate. Reference the files by name and location so the team can find the current version, and move superseded files out of the working folder so nobody uses them by mistake.

| Check | Reviewer |
|---|---|
| The summary answers the question in the first paragraph | Author, then technical reviewer |
| Numbers agree with the tables, the estimate and the map file | Author |
| Boring IDs, stations, coordinates and dates are correct and consistent | Author |
| Interpretation and recommendations are supported by the data | Technical reviewer |
| Open items name who decides | Project manager |
| Draft status is marked until final | Author |
| No client-confidential data leave the project team | Project manager |
Mark drafts clearly ("draft, pending internal review") until they are issued, and record the revision history in the header for update memos.
The outline below is condensed from a project update memo on a siding re-grade, with client details removed.
| Part | Content |
|---|---|
| Summary | A design check found that the west reach had embankment work but no planned borings. Three borings were added and all borings renumbered west to east, giving 10 borings and 132 ft of drilling. The drilling RFP was revised and the estimate updated. |
| Finding | The only nearby boring was a 4-ft hand auger on the other side of the track, in topsoil only; a creek and box culvert nearby suggest soft alluvium under the fill; the reach is about 2.7 miles from the others and needs a separate setup. |
| Details | Boring table: ID, reach, station, offset, depth, coring, coordinates, previous ID. |
| Changes (RFP Revision 2) | Reach added to site reference and access; borings renumbered; totals 10 borings, 132 ft, 15-ft coring contingency, up to 16 Shelby tubes; laboratory quantities updated. |
| Cost effect | Subconsultant rates are placeholders (previous invoice plus 20 percent) until the quote is received. |
| Files updated | RFP, map files, figures, project pages and cost workbook; superseded files moved out. |
| Open items | Confirm the new boring locations with the geotechnical lead; draw the access route; replace placeholder rates when the quote arrives. |
| Topic | Refer to |
|---|---|
| Report types and the emergency assessment letter | Section 8.4.1 |
| Exploration versus investigation | Chapter 8.1 |
| Change orders | Chapter 8.2 |
| Reconnaissance summary | Chapter 3.4 |
| Drilling RFP revisions | Chapter 3.3 |