Railway Ground Hazard Risk Management · 1.0 · Introduction
Sections · click a car to open it

Chapter 1.0 — Manual Overview

About this manual and how it is organized.
Authors: Daniel P. Colwell and Mario Ruel
Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
1.0.1 Purpose of This Manual

Railway Ground Hazard Risk Management is a geotechnical reference for railroad clients. It is organized in eight sections that follow a project from start to finish: 1.0 Introduction (this overview and the risk framework); 2.0 The Underworld (the track foundation, how it fails, and the soil, rock and groundwater beneath it); 3.0 Risk Management (scoping, desktop study, drilling scope, reconnaissance, site conditions, access, cost, risk ratings and risk assessment); 4.0 Subsurface Exploration; 5.0 Testing; 6.0 Analysis; 7.0 Design; and 8.0 Reporting. Chapters are numbered by section and order, so Chapter 2.4 is the fifth chapter in Section 2.0, and its subsections are 2.4.1, 2.4.2 and so on. The manual was restructured this way in November 2026, when the chapters on scoping, desktop study, drilling scope, reconnaissance, site conditions, access, cost estimates, infiltration and seepage, and reporting (Chapters 3.1 to 3.7, 6.4 and 8.1 to 8.3) were added.

It is written for geotechnical engineers, geologists and field staff delivering investigation, design, construction-phase and ground hazard risk management services to Class I, regional and short line railroads, and to passenger and commuter operators.

1.0.2 How the Manual Is Organized
SectionTitleScopeChapters
1.0IntroductionAbout this manual and the risk framework that governs the rest of itChapter 1.0 — Manual Overview
Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management
2.0The UnderworldTrack foundation, failure mechanisms, soil and rock, track substructure, problem soils and groundwaterChapter 2.1 — Track Foundation Elements
Failure mechanisms and triggers (Chapter 3.8, Sections 3.8.1–3.8.17)
Chapter 2.2 — Soil and Rock Classification
Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior
Chapter 2.8 — Groundwater Characterization and Seepage
3.0Risk ManagementScoping, desktop study, drilling scope, site review, site conditions, access, cost, risk ratings and risk assessmentChapter 3.1 — Scoping Proposals
Chapter 3.2 — Desktop Study
Chapter 3.3 — Drilling Scope
Chapter 3.4 — Site Review and Reconnaissance
Chapter 3.5 — Site Conditions
Chapter 3.6 — Site Accessibility Study
Chapter 3.7 — Cost Estimates
Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Chapter 3.9 — Geotechnical Investigation Planning and Scope
4.0Subsurface ExplorationBorings and samplingChapter 4.1 — Borings and Sampling
5.0TestingIn situ testing, laboratory testing, and construction monitoring and field testingChapter 5.1 — In Situ Testing
Chapter 5.2 — Laboratory Testing Program
Chapter 5.3 — Construction Monitoring and Field Testing
6.0AnalysisBearing capacity, settlement, slope stability, infiltration and seepage, and seismic hazardChapter 6.1 — Foundation Engineering: Bearing Capacity
Chapter 6.2 — Settlement Analysis
Chapter 6.3 — Slope Stability Analysis
Chapter 6.4 — Infiltration and Seepage
Chapter 6.5 — Seismic Hazard and Liquefaction
7.0DesignRetaining structures, ground improvement and pavement subgradeChapter 7.1 — Retaining Structures
Chapter 7.2 — Ground Improvement Methods
Chapter 7.3 — Pavement Subgrade Evaluation
Ground Improvement Technology Library — Chapter 7.2, Section 7.2.16
8.0ReportingExploration versus investigation, change orders, memorandums and the geotechnical reportChapter 8.1 — Exploration Versus Investigation
Chapter 8.2 — Change Orders
Chapter 8.3 — Memorandums
Chapter 8.4 — Geotechnical Report Preparation
App.AppendicesTemplates, special provisions, typical soil properties and analytical equationsAppendices
Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit
Appendix F — Analytical Equations

Where the Geotechnology for Railroaders course modules are used in this manual

The two-day Geotechnology for Railroaders course (Modules 1–8) is the field-training companion to this manual. Its concepts, case histories, field photographs and job-aid figures are cited in the chapters below. Use the course for crews and inspectors, and this manual for the engineering basis behind it.

Table 1.0-2. Course module to manual chapter crosswalk
Course moduleWhere it appears in this manual
1 — Risk Management of Geo-HazardsChapter 1.1 (risk equation, classification, case histories, stabilization program)
2 — Geology and Soil EngineeringChapters 3.9, 4.1, 2.2, 5.2 and 3.8 (landforms, sampling, field identification, subgrade strength by feel)
3 — Track Substructure: Ballast and Sub BallastChapters 2.3 and 2.1 (ballast functions, fouling, undercutting, sub ballast, bridge approaches)
4 — Track DrainageChapters 2.3, 2.1 and 2.8 (cardinal rules, ditches, subdrains, culvert inspection)
5 — Slides and InstabilitiesChapters 3.8 and 6.3 (downhill and uphill slide categories, the four don’ts, signs of instability)
6.1 — Slope StabilizationChapters 6.3 and 7.1 (berms, realignment, driven and gravity walls, soil nailing)
6.2 — Subgrade StabilizationChapters 6.1, 5.3 and 7.2 (geosynthetics, HMA underlayment, grouting, EPS, screw piles)
6.3 — Scour and ErosionChapter 3.8 (scour mechanisms, countermeasures)
6.4 — Rock FallsChapters 3.8 and 6.3 (rockfall strategies, incident reporting)
6.5 — Beaver DamsChapter 3.8 (BAHA program, uphill dams, rapid drawdown)
6.6 / 7.1 — Winter Problems, Spring ThawChapters 2.3, 3.8 and 6.3 (frost heave, spring silt liquefaction, rapid drawdown)
7.2 / 7.3 — Extreme Weather, EarthquakesChapters 3.8 and 6.5 (event declaration, precipitation indices, seismic response criteria)

After Geotechnology for Railroaders Program, Module 1; course menu. Full reference under Supplemental References.

1.0.3 Using the Apps on a Desktop and a Phone

The manual is supported by a small set of apps on dirtbert.com. They run in any current web browser (Chrome, Edge, Safari or Firefox) on a desktop, laptop, tablet or phone. There is nothing to install and no account to create, except where a sign-in is noted below.

Table 1.0-3. The apps, and how each one works on a desktop and on a phone
AppWhat it doesOn a desktopOn a phoneWhere your work is kept
GHRMThis manual: eight sections (1.0 to 8.0), 37 chapters and the appendices.Each chapter opens with an On this page list at the left and the section train across the top. Select a section heading to open it; Expand all opens every section.The page narrows to one column and On this page folds into a button at the top: tap it, then tap a section. Turn the phone sideways for wide tables.Checklist ticks are saved in this browser on this device.
GHRM Tools, Analytical Tools and the Calculator MapCalculators, workbook guides and field forms from the Geotechnical Analysis Suite, listed by discipline or by manual chapter.Calculators open in a new tab. The Apps and Analytical Tools section at the end of each Section 6.0 Analysis chapter (6.1, 6.2, 6.3, 6.4, 6.5), and the orange strips inside sections, link straight to them.Calculators work on a phone; the workbook guides read best on a larger screen.The calculators are on dirtbert.com and need a sign-in.
Ground Improvement Technology SelectorNarrows the 45 techniques of the technology library (7.2.16) to the ones that fit the problem and site.Opens beside Chapter 7.2.Same page, one column.Nothing is stored.

Keeping the apps on a phone

Open the app in the phone’s browser and add it to the home screen so it opens like an app:

  • iPhone or iPad (Safari): tap Share, then Add to Home Screen.
  • Android (Chrome): tap the ⋮ menu, then Add to Home screen.

Good candidates are the chapters you use most in the field.

Where the apps appear in this manual

  • Apps and analytical tools: gathered in Section 6.0 Analysis. Each analysis chapter ends with an Apps and Analytical Tools section (6.1, 6.2, 6.3, 6.4, 6.5) listing the apps and the calculators and workbook guides for that part of the analysis, with the chapters and sections where each tool is used. Project management and cost tools are in Chapters 3.1 and 3.7, and pavement design tools in Chapter 7.3, each in an Apps and Tools section (3.1, 3.7, 7.3).
  • Orange tools strips: inside each section a tool supports, in every chapter.
  • Checklists: sections marked with a checklist save your ticks in the browser and can be printed.
1.0.4 Conventions and Standards Basis
  • Units: English (U.S. customary) units throughout, with SI in parentheses where a source equation is SI-based.
  • Loading: Cooper E-80 and 286,000-lb gross rail load are the default design bases unless the client specifies otherwise.
  • Governing references: AREMA Manual for Railway Engineering; FRA Track Safety Standards (49 CFR Part 213) and Bridge Safety Standards (49 CFR Part 237); ASTM test methods; FHWA and USACE guidance; and each client railroad's engineering standards, which govern where they differ.
  • Client values: Client-specific criteria quoted in this manual are summaries for planning. Always confirm them against the client's current standard before use on a project.

Reading European (UIC / EN) railway sources alongside AREMA

Several sections of this manual draw on Profillidis, Railway Management and Engineering, which is written to UIC and European (EN) practice in metric units. AREMA and FRA remain the governing basis for North American work; the European material is included for the mechanics, the data and the design logic behind it. The terms and units below appear wherever that material is cited.

Table 1.0-1. Terms and units used where this manual cites Profillidis
European / UIC termNorth American equivalent or conversion
SleeperTie (crosstie)
Track bedBallast + subballast together
Formation layerEngineered top-of-subgrade layer; comparable in role to a blanket or prepared subgrade layer
SubsoilNative or embankment fill below the formation layer
Cant / cant deficiencySuperelevation / unbalanced superelevation
Longitudinal, transverse, horizontal defectSurface (profile), cross-level, alignment
t (metric tonne) — axle load1 t = 2,205 lb; a 286,000-lb car on 4 axles ≈ 32.4 t/axle
kp/cm² (kilopond per cm²)1 kp/cm² ≈ 14.2 psi
t/mm (track or layer reaction coefficient)1 t/mm ≈ 56 kip/in.
‰ (per mille) gradient10‰ = 1.0% grade
MGT / million tons of trafficSame concept; UIC counts gross metric tons

UIC axle-load categories for standard gauge: A = 16 t, B = 18 t, C = 20 t, D = 22.5 t (E = 25 t). Profillidis notes that standard-gauge axle loads in the USA are 28–35 tons, so European design charts calibrated to 22–25 tons sit well below North American heavy-haul loading. Track deterioration is reported to grow roughly with Q3 to Q4 (Q = axle load), so a modest axle-load increase produces a much larger increase in damage.

UIC line groups (UIC Code 714R) classify lines by a fictitious daily tonnage Tth that weights freight, locomotive and speed effects: group 1 > 130,000 t/day; group 2 = 80,000–130,000; group 3 = 40,000–80,000; group 4 = 20,000–40,000; group 5 = 5,000–20,000; group 6 < 5,000 t/day. Group 4 is described as representative of most lines worldwide. Several UIC thickness and maintenance rules in this manual are keyed to these groups.

Regulation, specification, code, standard and guideline are not interchangeable. In the book’s usage, regulations and specifications are rules issued by governmental or inter-governmental bodies that impose specific instructions or methods; codes are a form of legislation defining a procedure or performance to be followed; standards are uniform criteria developed by a national or international body and are suggested rather than obligatory; guidelines are non-mandatory recommendations.

After Profillidis (2014), §7.5 (axle and traffic load), §12 footnote (definitions). Conversions added by the authors. Full reference under Supplemental References.

1.0.5 Empirical Equations — Use and Limitations

Many values in railway geotechnical work are estimated from empirical equations: SPT and CPT correlations for strength and stiffness, index-property correlations for compressibility and permeability, rock-mass ratings, and landslide runout and rainfall-threshold relations. The manual collects 60 of them in the Empirical Equations & Correlations reference, each with its formula, original source, the data it was fitted to, and the constraints on its use.

Every equation is a statistical fit to a specific data set. Use it only within the stated materials and ranges, prefer site-specific calibration, and confirm coefficients against the cited original before relying on a result for design.

Note required when an equation is used. Wherever a correlated value appears — a calculation, a boring log, a design-parameter table, a report or a GHRM assessment — record with it:

  1. the equation ID and source (for example, IS-02, Liao & Whitman 1986);
  2. that the soil or rock is within the equation’s range of applicability;
  3. that the value is correlated, not tested;
  4. the limitation that governs (for example, “not applicable to clays”), and the test that will confirm it.

Each chapter has an Empirical Equations — Use and Limitations card listing the equations it uses, and an Empirical equation note box closes each section that refers to one. The Geotechnical Analysis Suite workflow adds the same note wherever it uses a correlation (preliminary anticipated results, assumed design parameters, the report).

Where each equation is used

IDEquationFamilyUsed in (or applies to)
IS-01SPT energy & procedure correctionIn-situ testsAppendices; Chapter 3.9; Chapter 4.1; Chapter 6.1; Chapter 6.5; Chapter 5.3; Chapter 8.4
IS-02SPT overburden normalization (sands)In-situ testsAppendices (applies); Chapter 3.9 (applies); Chapter 4.1; Chapter 6.5; Chapter 8.4
IS-03Relative density of sand from SPTIn-situ testsChapter 4.1 (applies); Chapter 7.2 (applies)
IS-04Friction angle of sand from SPT (Schmertmann form)In-situ testsChapter 6.1 (applies); Chapter 7.1 (applies)
IS-05Friction angle of sand from SPT (Peck–Hanson–Thornburn)In-situ testsChapter 4.1 (applies); Chapter 6.1 (applies); Chapter 7.1 (applies)
IS-06Friction angle of sand from SPT (Hatanaka & Uchida)In-situ testsChapter 6.1 (applies)
IS-07Undrained shear strength of clay from SPTIn-situ testsChapter 4.1 (applies); Chapter 6.1 (applies); Chapter 6.3 (applies); Chapter 6.5; Chapter 2.3 (applies); Chapter 8.4; Chapter 2.1 (applies)
IS-08Drained Young's modulus of sand from SPTIn-situ testsChapter 6.2 (applies)
IS-09Shear-wave velocity from SPTIn-situ testsChapter 6.5 (applies)
IS-10OCR of clay from SPTIn-situ testsreference only
IS-11Cyclic resistance ratio of sand from SPTIn-situ testsChapter 6.5
IS-12Corrected cone resistanceIn-situ testsChapter 5.1; Chapter 6.5; Chapter 5.3 (applies)
IS-13Soil behaviour type index (normalized)In-situ testsChapter 5.1 (applies); Chapter 6.5
IS-14Undrained shear strength from CPTIn-situ testsChapter 5.1; Chapter 6.1 (applies); Chapter 6.3 (applies); Chapter 7.2
IS-15Friction angle of sand from CPTIn-situ testsChapter 5.1 (applies); Chapter 6.1 (applies)
IS-16Relative density of sand from CPTIn-situ testsChapter 5.1 (applies); Chapter 7.2 (applies)
IS-17Preconsolidation stress / OCR from CPTIn-situ testsChapter 5.1 (applies); Chapter 6.2; Chapter 7.2; Chapter 5.3 (applies)
IS-18Shear-wave velocity from CPTIn-situ testsChapter 5.1; Chapter 6.5; Chapter 2.3
IS-19Constrained modulus from CPTIn-situ testsChapter 5.1 (applies); Chapter 6.2 (applies); Chapter 7.2 (applies)
IS-20Hydraulic conductivity from CPTIn-situ testsChapter 5.1 (applies); Chapter 2.8 (applies); Chapter 7.2
IS-21Soil unit weight from CPTIn-situ testsChapter 5.1 (applies); Chapter 7.3 (applies)
IS-22Cyclic resistance ratio of sand from CPTIn-situ testsChapter 6.5
IS-23Flat dilatometer (DMT) intermediate parametersIn-situ testsChapter 5.1
IS-24OCR, K₀ and Sᵤ of clay from DMTIn-situ testsChapter 5.1
IS-25Field vane strength correctionIn-situ testsChapter 5.1; Chapter 2.2; Chapter 6.3
IX-01Compression index from liquid limit (undisturbed)Index propertiesChapter 3.9 (applies); Chapter 2.2 (applies); Chapter 6.2 (applies); Chapter 5.2 (applies)
IX-02Compression index from liquid limit (remolded)Index propertiesChapter 6.2 (applies); Chapter 5.2 (applies)
IX-03Compression index from void ratioIndex propertiesChapter 6.2 (applies); Chapter 5.2 (applies)
IX-04Compression index from plasticity indexIndex propertiesChapter 2.2 (applies); Chapter 6.2 (applies); Chapter 5.2 (applies)
IX-05Secondary compression ratioIndex propertiesChapter 6.2; Chapter 2.3 (applies); Chapter 5.3 (applies); Chapter 5.2 (applies); Chapter 2.1
IX-06Normalized undrained strength from plasticityIndex propertiesChapter 6.3 (applies); Chapter 5.2 (applies)
IX-07SHANSEP undrained strength ratioIndex propertiesChapter 6.3 (applies)
IX-08Friction angle of NC clay from plasticityIndex propertiesChapter 6.3 (applies); Chapter 7.1 (applies); Chapter 5.2 (applies)
IX-09At-rest earth pressure coefficientIndex propertiesChapter 5.1; Chapter 7.1; Chapter 2.1 (applies)
IX-10Undrained strength from liquidity indexIndex propertiesChapter 2.2; Chapter 7.3 (applies); Chapter 5.2 (applies)
IX-11Hazen hydraulic conductivityIndex propertiesChapter 2.8 (applies); Chapter 7.2 (applies); Chapter 5.2 (applies)
IX-12Chapuis hydraulic conductivityIndex propertiesChapter 2.8 (applies)
IX-13Small-strain shear modulus (Hardin)Index propertiesChapter 5.1; Chapter 6.5 (applies); Chapter 2.3 (applies); Chapter 5.2 (applies)
RK-01Rock Mass Rating (RMR₈₉)Rock mass & rockfallChapter 3.9 (applies); Chapter 2.2
RK-02Rock mass quality (Q-system)Rock mass & rockfallChapter 2.2
RK-03RMR–Q conversionRock mass & rockfallChapter 2.2 (applies)
RK-04RQD from volumetric joint countRock mass & rockfallChapter 4.1 (applies); Chapter 2.2 (applies)
RK-05GSI from RMR₈₉Rock mass & rockfallChapter 2.2
RK-06Slope Mass RatingRock mass & rockfallChapter 6.3 (applies); Chapter 1.1 (applies); Chapter 3.8 (applies)
RK-07Generalized Hoek–Brown criterionRock mass & rockfallChapter 6.1 (applies); Chapter 6.3 (applies)
RK-08Rock mass deformation modulusRock mass & rockfallChapter 6.5
RK-09Joint shear strength (Barton–Bandis)Rock mass & rockfallChapter 6.3 (applies)
RK-10UCS from point load indexRock mass & rockfallAppendices; Chapter 3.9; Chapter 4.1; Chapter 2.2 (applies); Chapter 7.3; Chapter 2.3; Chapter 5.2
RK-11Rockfall shadow angleRock mass & rockfallChapter 1.1 (applies); Chapter 3.8 (applies)
RK-12Rockfall Hazard Rating System scoringRock mass & rockfallChapter 1.1 (applies); Chapter 3.8
LS-01Reach angle (Fahrböschung) vs. volume — rock avalanchesLandslide & debris flowChapter 1.1 (applies); Chapter 3.8 (applies)
LS-02Reach angle vs. volume — all landslide typesLandslide & debris flowChapter 1.1 (applies)
LS-03Debris-flow travel distanceLandslide & debris flowChapter 1.1 (applies); Chapter 3.8 (applies)
LS-04Debris-flow peak dischargeLandslide & debris flowChapter 1.1 (applies)
LS-05Debris-flow inundation area (LAHARZ-type)Landslide & debris flowChapter 1.1 (applies)
LS-06Debris-flow velocity from superelevationLandslide & debris flowChapter 3.8 (applies)
LS-07Landslide volume from areaLandslide & debris flowChapter 1.1 (applies)
LS-08Rainfall intensity–duration threshold (Caine)Landslide & debris flowChapter 1.1 (applies); Chapter 3.8
LS-09Rainfall intensity–duration threshold (global update)Landslide & debris flowChapter 1.1 (applies); Chapter 3.8 (applies)
LS-10Newmark sliding displacement (regression)Landslide & debris flowChapter 6.5; Chapter 1.1 (applies); Chapter 3.8 (applies)
Supplemental References

Sections on this page marked “After Profillidis (2014)” draw on the document below. Text is summarized or paraphrased; tables are transcribed or reproduced with their original source noted; figures and photos are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design.

  1. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  2. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This part was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

This part summarizes and organizes material from the chapters that follow; see the Author and Sources section at the end of each chapter for the works cited.

Next · 1.0 Introduction → Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management