Appendix F — Analytical Equations

The closed-form equations of soil and rock mechanics used in this manual, 97 entries in nine families, each with its variables, the conditions it assumes, its source and the sections that use it. English units throughout.
Author: Daniel P. Colwell

Companion to the Empirical Equations & Correlations reference. Equations transcribed from the cited literature and checked against the chapters that use them; verify against the originals before design use.

Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database

Empirical correlations from the library references, in English units. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.

References (27)
  1. AREMA19 – AREMA (2019). Manual for Railway Engineering, Chapter 1 – Roadway and Ballast. American Railway Engineering and Maintenance-of-Way Association.
  2. ASCE722 – ASCE (2022). ASCE/SEI 7-22, Minimum Design Loads and Associated Criteria for Buildings and Other Structures.
  3. CALTRANS – California Department of Transportation (2004). Transportation- and Construction-Induced Vibration Guidance Manual (Jones & Stokes, June 2004).
  4. CASTELLANOS – Castellanos, B.A. (2014). Use and Measurement of Fully Softened Shear Strength. Ph.D. dissertation, Virginia Polytechnic Institute and State University.
  5. CB – Carter, M. & Bentley, S.P. (2016). Soil Properties and their Correlations, 2nd ed. Wiley.
  6. RRSUPER – A Class I railroad (2002). RM 1305-0, Method for Determining Superelevation, Spiral Length, and Maximum Train Speed on Curves (December 2002).
  7. RRPIPE1 – A Class I railroad (2018). Specifications for the Design and Construction of Pipeline Occupancies (revised June 5, 2018).
  8. DASDYN – Das, B.M. & Ramana, G.V. (2011). Principles of Soil Dynamics, 2nd ed. Cengage Learning.
  9. EM1901 – U.S. Army Corps of Engineers (1993). EM 1110-2-1901, Seepage Analysis and Control for Dams (Change 1).
  10. EM2908 – U.S. Army Corps of Engineers (1994). EM 1110-1-2908, Rock Foundations.
  11. FGE – Rao, V.V.S. & Sivakumar Babu, G.L., eds. (2016). Forensic Geotechnical Engineering. Developments in Geotechnical Engineering. Springer India.
  12. GEC5 – Sabatini, P.J. et al. (2002). FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017)), Geotechnical Engineering Circular No. 5: Evaluation of Soil and Rock Properties.
  13. HDS2 – FHWA (2002). Highway Hydrology, Hydraulic Design Series No. 2, 2nd ed. FHWA-NHI-02-001 (superseded by HDS-2 Highway Hydrology 3rd ed., FHWA-HIF-24-007 (2024)).
  14. HEC20 – FHWA (2001). Hydraulic Engineering Circular No. 20, Stream Stability at Highway Structures, 3rd ed. FHWA NHI 01-002 (superseded by HEC-20 4th ed., FHWA-HIF-12-004 (2012)).
  15. LI16 – Li, D., Hyslip, J., Sussmann, T. & Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis.
  16. LOOK – Look, B.G. (2007). Handbook of Geotechnical Investigation and Design Tables. Taylor & Francis.
  17. LOOK23 – Look, B.G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press / Taylor & Francis.
  18. RAOHAMED – Rao, A.R. & Hamed, K.H. (2000). Flood Frequency Analysis. CRC Press.
  19. ROB – Robertson, P.K. & Cabal, K.L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing.
  20. TOMLINSON – Tomlinson, M. & Woodward, J. (2008). Pile Design and Construction Practice, 5th ed. Taylor & Francis.
  21. TRENTER – Trenter, N.A. (2001). Earthworks: A Guide. Thomas Telford, London.
  22. UFC – U.S. Department of Defense (2004). UFC 3-220-05, Dewatering and Groundwater Control (16 January 2004).
  23. UFC486001 – U.S. Department of Defense (2022). UFC 4-860-01, Railroad Design and Rehabilitation, 23 June 2022.
  24. RRSHORE – Two Class I railroads (2004). Guidelines for Temporary Shoring (published October 25, 2004).
  25. USACE – U.S. Army Corps of Engineers (1990). EM 1110-1-1904, Settlement Analysis.
  26. UTSI – Utsi, E.C. (2017). Ground Penetrating Radar: Theory and Practice. Butterworth-Heinemann (Elsevier).
  27. WYLLIE – Wyllie, D.C. & Mah, C.W. (2004). Rock Slope Engineering: Civil and Mining, 4th ed. Spon Press.
Correlations (74)
EstimateCorrelationLimits / notesSource
Undrained strength of clay from SPTsu ≈ 4 N (high PI) to 15 N (low PI), kPa → su ≈ 85 N to 310 N psfSowers; wide scatter – calibrate locallyLOOK 5.3 notes, p.79
Undrained strength of clay from SPTsu ≈ 4.5 N (PI > 30%) to 8 N (PI = 15%), kPa → su ≈ 95 N to 165 N psfStroud & Butler (1975)LOOK 5.3 notes, p.79
Friction angle from normalized SPTφ′ = √(15.4 (N1)60) + 20°Hatanaka & Uchida (1996), 60% energyGEC5 Eq. 72, p.211
Friction angle from SPT and stressφ′ ≈ tan⁻¹ [N60 / (12.2 + 20.3 σ′vo/pa)]^0.34Schmertmann (1975); conservative at shallow depthGEC5 Eq. 73, p.211
Saturated very fine or silty sandN = 15 + (N′ − 15)/2 for N′ > 15Dynamic pore pressure correctionGEC5 34 note, p.211
Elastic modulus from SPT – silts, sandy siltsE ≈ 400 (N1)60 kPa = 8.4 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – clean fine–medium sandsE ≈ 700 (N1)60 kPa = 14.6 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – coarse sandsE ≈ 1,000 (N1)60 kPa = 20.9 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Elastic modulus from SPT – sandy gravelsE ≈ 1,200 (N1)60 kPa = 25.1 (N1)60 ksfAASHTO (1996)GEC5 29, p.175
Clay modulus from SPTE′/N ≈ 0.6–0.7 MPa (12.5–14.6 ksf); Eu/N ≈ 1.0–1.2 MPa (21–25 ksf)CIRIA (1995); Eu/N = 1 footings, 2 rafts, 3 friction pilesLOOK 11.12, p.155
CPT tip / SPT ratioqc/N (tsf per blow/ft): silts 2; clean fine–medium sand 3.5; coarse sand 5; sandy gravel 6SchmertmannUSACE 3-1, p.35
Undrained strength from CPTsu = qc / Nk, Nk = 17–20 (NC 17–18, OC 20); corrected su = (qc − σvo)/Nk, Nk = 15–19Calibrate with lab testsLOOK 5.14, p.85
Coefficient of horizontal consolidationch = 300 / t50 (m²/yr, t50 in minutes) → ch ≈ 3,230 / t50 ft²/yr; cv ≈ ch / 2 (range 1–10)Piezocone dissipationLOOK 5.14, p.85
Compression index – claysCc = 0.009 (LL − 10) (organic soils, sensitivity < 4)Skempton / Terzaghi & PeckUSACE 3-7, p.59
Compression index – claysCc = 1.15 (e0 − 0.35); Cc = 0.012 wn; Cc = 0.01 (LL − 13)All claysUSACE 3-7, p.59
Compression index – organic soils, peatCc = 0.0115 wnwn in percentUSACE 3-7, p.59
Compression index – varved claysCc = (1 + e0) [0.1 + 0.006 (wn − 25)]USACE 3-7, p.59
Compression index – remolded claysCc = 0.007 (LL − 7)Azzouz et al. (1976)CB 5.2, p.109
Compression index – inorganic silt/clayCc = 0.30 (e0 − 0.27); Cc = 0.75 (e0 − 0.5)Azzouz et al. (1976)CB 5.2, p.109
Recompression indexCr ≈ 0.05–0.10 Cc (range 0.015–0.35)Roscoe et al. (1958)CB 5.1 text, p.108
Secondary compression indexCα ≈ 0.0001 wn (10 < wn < 3000%)NAVFAC DM 7.1USACE 3-14 text, p.79
Drained modulus of clay from suE′/su ≈ 270 (PI 10–30), 200 (20–30), 150 (30–40), 130 (40–50)Stroud et al. (1975)LOOK 11.13, p.155
Shear modulus at small and large strainG(large) ≈ E/2.5; G(small) ≈ 2E ≈ 5 G(large)LOOK 11.2 notes, p.148
Stiffness degradationE0.01/E0 = 0.8–0.9; E0.1/E0 = 0.4–0.5; E1.0/E0 = 0.1–0.2Heymann (1998)LOOK 11.3, p.148
Hazen formulak (cm/s) ≈ C · D10² (mm), C ≈ 1.0–1.5Clean sands; Hazen (1911): C1 = 0.01–0.015 with k in m/sCB Eq. 4.5, p.97
Plasticity index from linear shrinkagePI ≈ 2.13 LSUse where PL and LL are difficultLOOK 2.12, p.49
Liquidity and consistency indexLI = (w − PL)/PI; CI = (LL − w)/PICB Eq. 6.15–6.16, p.145
Tensile and point load strengthTensile ≈ 5–25% UCS (use 10%); Is(50) ≈ UCS/20 (varies)LOOK 6.1, p.90
Rock mass strength from RQDRQD 0–70%: q = 0.33 qu, c = 0.1 qu, φ = 30°; RQD 70–100%: q = 0.33–0.8 qu, c = 0.1 qu, φ = 30–60°Kulhawy & Goodman (1988)LOOK 9.13, p.132
Joint shear strengthEffective φ = basic φb + roughness angle i (first-order i 10–15°, second-order 20–30°)Patton (1966)LOOK 9.15–9.16, p.134
Undrained strength from CPTusu = (qt − σvo)/Nkt, Nkt = 10–18 (average 14)Use 14–16 with no local experienceROB text, p.43
Undrained strength ratiosu/σ′vo ≈ Qt/Nkt ≈ 0.071 Qt; (su/σ′vo)NC ≈ 0.22 (direct simple shear, φ′ ≈ 26°)Qt = (qt − σvo)/σ′voROB text, p.45
Overconsolidation ratio from CPTOCR = 0.25 Qt^1.25 (Robertson 2009); OCR = k Qt, k = 0.33 (0.2–0.5) (Kulhawy & Mayne 1990)Kulhawy & Mayne valid for Qt < 20ROB text, p.46
In situ stress ratioK0 ≈ 0.1 QtMechanically overconsolidated fine-grained soils only; guide onlyROB text, p.47
Soil unit weight from CPTγ/γw = 0.27 log Rf + 0.36 log(qt/pa) + 1.236, Rf = 100 fs/qt (%)Robertson (2010)ROB text, p.42
Friction angle of clean sand from CPTφ′ = 17.6° + 11 log QtnUnaged, uncemented quartz to siliceous sand (Mayne 2006)ROB Fig. 28, p.49
SPT N60 from CPT and Ic(qt/pa)/N60 = 8.5 (1 − Ic/4.6)Jefferies & Davies (1993); Ic < 4.06; poor in stiff high-OCR claysROB text, p.41
Permeability from Ick = 10^(0.952 − 3.04 Ic) m/s for 1.0 < Ic ≤ 3.27; k = 10^(−4.52 − 1.37 Ic) m/s for 3.27 < Ic < 4.0 (× 100 for cm/s)Approximate guide onlyROB 6, p.56
Constrained modulus from CPTM = αM (qt − σvo); Ic > 2.2: αM = Qt when Qt < 14, αM = 14 when Qt > 14; Ic < 2.2: αM = 0.0188 · 10^(0.55 Ic + 1.68)Robertson (2009); lower in organic soilsROB text, p.62
Small-strain shear modulus from shear wave velocityG0 = ρ Vs² = (γ/g) Vs² (γ in pcf, g = 32.2 ft/s², Vs in ft/s → G0 in psf)Seismic CPT or other Vs measurementROB text, p.53
Subgrade reaction size effectks = ks1 [(B + 1)/(2B)]², B in ftTerzaghi (1955); large scatterROB 9 text, p.84
Probability of failure from mean FS and its COVpf = P(FS < 1) ≈ Φ(−ln μFS / θ) (FS lognormal, θ = COV of FS small)Reproduces Silva et al. (2008) curves; θ ≈ 0.07–0.32 by structure categoryFGE text, p.475
Forensic rejection criterion for an observed FSFS* = exp[√ln(1 + θ²) · (β − 1.645/√n)]; observed FS < FS* → the target β was not achievedθ = COV of FS, n = number of observed FS. Example: β = 3, θ = 0.3, n = 1 → FS* ≈ 1.5FGE Eq. 31.5, p.472
Total measurement errorCOVtotal = √(COVequipment² + COVprocedure² + COVrandom²)Kulhawy & Trautmann (1996)FGE 31.5, p.480
Model factorHm = M · Hu; M < 1 means the calculated capacity exceeds the measured (unconservative)M treated as an independent lognormal variable (lateral capacity of drilled shafts example)FGE Eq. 31.11, p.485
Fouling indexFI = P4 + P200 (percent passing No. 4 and No. 200 sieves)Selig & Waters (1994); categories clean < 1 … highly fouled > 40LI16 Eq. 3.1, p.84
Spoornet fouling indexFI(Spoornet) = 0.4 P19 + 0.3 P6.7 + 0.2 P1.18 + 0.1 P0.15 (percent passing 19, 6.7, 1.18, 0.15 mm)Intervention at about 80LI16 Eq. 3.2, p.86
Cumulative plastic strain of subgradeεp(%) = a (σd/σs)^m N^bσd = deviator stress, σs = soil compressive strength, N = load cycles; a, b, m by soil type in the databaseLI16 4.7, p.174
E80 lateral pressure on shoring (Boussinesq strip)σh = (2q/π)(β − sin β cos 2α); q = 80,000/(5 × tie length) psfβ and α are angles to the edges of the tie strip; q = 1778 psf for 9-ft tiesRRSHORE App. A, p.A-1
E80 impact factor for buried structuresIF = 1.75 for cover ≤ 5 ft; IF = 1.75 − 0.03 (H − 5) for 5–30 ft; IF = 1.0 below 30 ftH = height of cover (ft)RRPIPE1 3.2.3, p.13
Subballast filter (piping subgrade)D15(subballast) < 5 × D85(subgrade); P200(subballast) ≤ 5%Plus R50 and R15 ratios by filter character (database)AREMA19 1-2-4, p.1-2-25
Rational method peak flowQ = C i A (Q in cfs, i in in./hr, A in acres)C from the database (railroad yards 0.20–0.40); small basins only (< 500 acres)HDS2 5.7, p.5-33
Risk of exceedance during service lifeR = 1 − (1 − 1/Tr)^nTr = return period (yr), n = service life (yr)HDS2 Eq. 4.81, p.4-90
Hazen permeability estimatek (cm/s) = C · D10², C ≈ 100 (40–150), D10 in cmClean, uniform sand only; confirm with pumping testsUFC Eq. 3-2, p.3-6
Weighted creep ratio against piping (Lane)Cw = (ΣLv + ΣLh/3) / Δh ≥ tabulated minimum (2.5 boulders … 8.5 very fine sand or silt)Lv, Lh = vertical and horizontal seepage path lengths; Δh = head differenceUFC 4-3, p.4-40
Stream stability ratingR = Σ (wi × ri) over 13 indicatorsExcellent < 32, good 32–55, fair 55–78, poor > 78HEC20 D.2–D.3, p.D.6
Curve superelevationE = 0.0007 D S² − Eu (E, Eu in in.; D = degree of curve; S = speed, mph)Eu = unbalance; Eu = 0 is balancedRRSUPER Eq. 1, p.1
Minimum spiral lengthL = max(1.63 Eu Sp, 62 E) (ft)Passenger comfort and freight torsion; Sp = max passenger speed (mph)RRSUPER Eq. 2–3, p.2
Impact pile driving vibrationPPV = 0.65 (25/D)^n × (E/36,000)^0.5 in/sD = distance (ft), E = rated hammer energy (ft-lb), n = 1.1 default (1.0–1.4 by soil class)CALTRANS Eq. 9, p.21
Vibratory pile driver and other equipmentPPV = PPVref (25/D)^n in/sPPVref = reference equipment level at 25 ftCALTRANS Eq. 10, 12, p.21–27
Ballast surface stresspm = qo / Ab ≤ 65 psiqo = maximum rail seat load (lb); Ab = 270 in.² for 6×8 ties, 312 in.² for 7×9 tiesUFC486001 Eq. 5-11, p.48
Site class velocity check (ASCE 7-22)Classify with v̄s, v̄s/1.3 and 1.3 v̄s when v̄s is estimated; use the most critical resultv̄s = Σdi / Σ(di/vsi) over the upper 100 ftASCE722 §20.3–20.4, §20.3
Fully softened strength from PI (curved envelope)τFS/pa = a (σ'n/pa)^b; a = 0.00004 PI² – 0.0091 PI + 0.7716; b = 0.00009 PI² – 0.0107 PI + 1.0561pa = 2,116 psf; σ(a) = 0.0247, σ(b) = 0.0407 (mean – 1σ ≈ 16% chance of lower value)CASTELLANOS Eq. 6.15–6.16, p.184
Shaft friction in coarse-grained soil (effective stress)fs = Ks σ'vo tan δ; Ks = (Ks/Ko) Ko, δ = (δ/φ') φ'Ks/Ko and δ/φ' from Tomlinson Tables 4.10–4.11; base Nq σ'vo AbTOMLINSON Eq. 4.17, T4.10–4.11, p.172
Haul volume from bulking factorVloose = Vbank (1 + B/100); Vfill = Vbank (1 + ΔV/100)B = bulking factor (Table 9.4); ΔV = net bulking (+) or shrinkage (–) after compactionTRENTER T9.4, text, p.119
Remolded strength from consistencyIc = 1 – LI = (LL – w)/PI → su range (Table 3.2)Remolded clay fill only; PL is hard to measure accurately – use with cautionTRENTER 3.2, p.28
Blast vibration attenuation (scaled distance)PPV = k (R/√W)^β in/sR = distance (ft), W = charge per delay (lb); k ≈ 160 avg, 242 (90%), 605 (99%); β ≈ −1.6WYLLIE Eq. 11.16, p.264
Grouted anchor bond lengthLb = T·FS / (π d τa)T = design load, d = drill hole diameter, τa = allowable rock–grout bond stress (Table 12.8)WYLLIE T12.8, p.297
Gumbel (EV1) flood quantile, method of momentsxT = x̄ + KT s; KT = −0.45 − 0.7797 ln[−ln(1 − 1/T)]x̄, s = mean and standard deviation of annual maxima; α = 0.7797 s, β = x̄ − 0.45005 sRAOHAMED Eq. 8.2.5–8.2.20, §7.2
GPR velocity and depthv = c/√εr ≈ 0.98/√εr ft/ns; depth = v t / 2t = two-way travel time (ns); 'rule of 3': air 0.98, dry soil (εr ≈ 9) 0.33, fresh water 0.11 ft/nsUTSI Ch. 4, p.40
Trafficability of placed fillw − wopt ≤ 2.5% (PI 10), 5% (PI 20), 7.5% (PI 30)Keeps su ≥ 60 kPa (1,250 psf) for haul trafficLOOK23 5.3, p.130
Mononobe–Okabe active earth pressurePAE = ½γH²(1 − kv)KAE; KAE = cos²(φ−θ−β) / {cosθ cos²β cos(δ+β+θ)[1 + √(sin(φ+δ)sin(φ−θ−i)/(cos(δ+β+θ)cos(i−β)))]²}; θ = tan⁻¹[kh/(1−kv)]β = wall back batter from vertical, i = backfill slope; no real solution when φ − θ − i < 0DASDYN Eq. 8.4–8.6, p.332–333
Bearing capacity of rock (general shear)qult = cNc + 0.5γBNγ + γDNq; Nφ = tan²(45 + φ/2), Nc = 2√Nφ(Nφ + 1), Nγ = √Nφ(Nφ² − 1), Nq = Nφ²Strip; multiply Nc by Cc and Nγ by Cγ for other shapes (Table 6-1); compressive failure of poorly confined columns: qult = 2c tan(45 + φ/2)EM2908 Eq. 6-1, 6-2, 6-5, p.6-3–6-5
Filter permeability and pipe criteriaD15(filter)/d15(base) ≥ 3 to 5; D50(filter)/hole or slot width ≥ 1.0Retention criterion by base soil category in Table D-2; no gap-graded filtersEM1901 Eq. D-1, D-2, p.D-5–D-6
All correlations ↗

Full database  ·  Laboratory tests  ·  Download Excel  ·  Library documents for this chapter  ·  Calculators for this chapter

F.0 Use and Limitations

Appendix F collects the analytical equations used across the manual in one place, in English (U.S. customary) units. An analytical equation comes from mechanics: equilibrium, elasticity, flow or wave theory. It is exact for the model it describes. That is the difference from the Empirical Equations & Correlations reference, whose entries are statistical fits to test data.

Exact for the model does not mean exact for the site. Every equation here rests on assumptions, such as an elastic half-space, a circular slip surface, one-dimensional drainage or steady seepage, and its inputs (strength, stiffness, permeability, pore pressure) carry the uncertainty of the investigation. The Limitations line in each entry states the assumption most likely to be violated in railroad work. A few entries combine an analytical form with empirical coefficients (for example, the β method for piles or the impact factor for wheel loads); those are flagged in the entry.

When an equation is used, report with the result:

  1. the equation ID and source (for example, SE-02, Terzaghi 1925);
  2. the input values and where each came from (test, correlation or assumption);
  3. that the site conditions meet the equation’s assumptions, or how they differ;
  4. the factor of safety or margin applied, and the criterion it is checked against.
Table F-1. Units and constants used in this appendix
QuantityUnitValue or note
Length, depth, thicknessft (in. for rail and tie dimensions) 
Stress, pressure, strengthpsf (psi for track and plate tests; tsf where noted)1 psi = 144 psf; 1 tsf = 2,000 psf
Unit weightpcfγw = 62.4 pcf
Force and loadlb, kips; lb/ft for plane-strain problemsCooper E-80 wheel = 40,000 lb
Hydraulic conductivityft/day (ft/s for laboratory tests)1 ft/s = 86,400 ft/day
Flowft3/day1 gpm = 192.5 ft3/day
Accelerationgg = 32.2 ft/s2
Atmospheric pressurepsfPa = 2,116 psf (14.7 psi)
Anglesdegrees, unless the entry says radians 
Table F-2. Equation families
SectionFamilyID prefixEntries
F.1Stresses in Soil: Effective Stress and Elastic Load SpreadST-9
F.2Track Structure: Beam on Elastic Foundation and Load SpreadTR-7
F.3Bearing Capacity and Deep FoundationsBC-19
F.4Settlement and ConsolidationSE-14
F.5Slope Stability (Limit Equilibrium)SL-13
F.6Lateral Earth Pressure and Retaining WallsEP-12
F.7Groundwater, Seepage and WellsGW-12
F.8Seismic and Dynamic ResponseDY-7
F.9Subgrade, Frost and ReinforcementSG-4

Each entry links to the sections of the manual where the equation is used. Use the search box below to find an equation by symbol, name or author.

F.1 Stresses in Soil: Effective Stress and Elastic Load Spread

Effective stress and the elastic (Boussinesq-type) solutions used to carry a surface load down to the layer being analyzed. These feed the settlement, bearing and subgrade checks.

ST-01Phase relationshipse, γd, γ
S · e = w · Gs
γd = Gs · γw / (1 + e)    e = Gs · γw / γd − 1
γ = (Gs + S · e) · γw / (1 + e)    n = e / (1 + e)

Variables. e = void ratio; n = porosity; w = water content (decimal); S = degree of saturation (decimal); Gs = specific gravity of solids; γw = 62.4 pcf; γd, γ = dry and moist unit weight (pcf)

Inputs: where each value comes from (8)
SymbolWhat it isComes fromHow to get itTypical range
evoid ratioAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
nporosityAnother equationn = e/(1 + e), from the void ratio.0.25–0.55 for most mineral soils · by USCS group
wwater content (decimal)Lab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
Sdegree of saturation (decimal)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Gsspecific gravity of solidsLab testSpecific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested.2.64–2.80 mineral; lower if organic · by USCS group
γw62.4 pcfConstantPhysical constant or standard value.project-specific
γddry unit weightLab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. All soils. Exact volume–weight identities; used to get e0 for consolidation and γ for stress calculations.

Limitations. Results are only as good as Gs and w. Assume S = 1 below the water table only where the soil is truly saturated; the capillary zone and gassy organic soils may not be.

Source. Lambe & Whitman 1969 [33] [27] · In the manual: Ch 6.2 Eq. 6.2-9

ST-02Effective stress principleσ'v
σ'v = σv − u
σv = Σ γi · hi    u = γw · hw (hydrostatic)

Variables. σv = total vertical stress (psf); u = pore water pressure (psf); γi, hi = unit weight (pcf) and thickness (ft) of layer i; hw = depth below the water table or piezometric head above the point (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
σvtotal vertical stress (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
upore water pressure (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
hwdepth below the water table or piezometric head above the point (ft)Field measurementGroundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level.project-specific

Use. Saturated soils. Governs strength and compressibility in every chapter.

Limitations. Hydrostatic u applies only with no vertical seepage. Use measured piezometric heads under artesian or downward flow, and the seasonal high water level for design.

Source. Terzaghi 1943 [57] · In the manual: Ch 2.8 Eq. 2.8-1

ST-03Mohr–Coulomb shear strengthτf
τf = c' + σ'n · tan φ'    (drained, effective stress)
τf = su    (undrained, φ = 0)
τr = c'r + σ'n · tan φ'r    (residual)

Variables. c', φ' = effective cohesion (psf) and friction angle; σ'n = effective normal stress on the failure plane (psf); su = undrained shear strength (psf); subscript r = residual

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
σ'neffective normal stress on the failure plane (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
suundrained shear strength (psf)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group

Use. Long-term (drained) or end-of-construction (undrained) analyses; residual strength on pre-sheared surfaces.

Limitations. A linear envelope overstates c' at low stress; for shallow slides use c' ≈ 0 or a curved envelope. Choose drained or undrained strength by loading rate relative to drainage, not by soil name alone.

Source. Coulomb 1776; Terzaghi 1943 [16] [57] · In the manual: Ch 6.3 Eq. 6.3-12, Ch 5.2 §5.2.3

ST-04Point load (Boussinesq)Δσz
Δσz = 3Q · z3 / (2π · R5) = (3Q / 2πz2) · [1 / (1 + (r/z)2)]5/2
R = √(r2 + z2)

Variables. Q = point load (lb); z = depth below the load (ft); r = horizontal distance from the load line (ft); Δσz in psf

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Qpoint load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
zdepth below the load (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
rhorizontal distance from the load line (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Concentrated loads (a wheel or column load) at depths greater than about twice the loaded width; superpose for several loads.

Limitations. Assumes a homogeneous, isotropic, linear-elastic half-space. Over-predicts stress below a stiff upper layer such as ballast over soft subgrade.

Source. Boussinesq 1885 [9] [45] · In the manual: Ch 6.2 §6.2.2, Ch 2.3 §2.3.2

ST-05Uniformly loaded rectangle, below a cornerIσ
Δσz = q · Iσ,   m = B/z,   n = L/z,   V = m2 + n2 + 1
Iσ = (1/4π) · [ (2mn√V / (V + m2n2)) · ((V + 1)/V) + tan−1( 2mn√V / (V − m2n2) ) ]

Variables. q = uniform pressure (psf); B, L = plan dimensions of the loaded rectangle (ft); z = depth below the corner (ft). Use the arctangent in radians and add π when V < m2n2

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
quniform pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
zdepth below the corner (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Footings, slabs and rectangular fill areas. Stress at any point is found by adding and subtracting corner rectangles; under the center of an L × B area use four rectangles of L/2 × B/2.

Limitations. Flexible load on an elastic half-space. Without the +π correction the arctangent form gives wrong values at shallow depth (V < m2n2). Iσ = 0.25 at z = 0.

Source. Newmark 1935 [41] [45] · In the manual: Ch 6.2 Eq. 6.2-1

ST-06Uniformly loaded circle, below the centerΔσz
Δσz = q · [ 1 − ( 1 / (1 + (a/z)2) )3/2 ]

Variables. q = uniform pressure (psf); a = radius of the loaded area (ft); z = depth below the center (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
quniform pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
aradius of the loaded area (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
zdepth below the center (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Tanks, plate load tests, tire or outrigger pads approximated as circles.

Limitations. Center line only; for off-center points use influence charts. Same half-space assumptions as ST-04.

Source. Integration of Boussinesq (1885) [45] [27] · In the manual: Ch 6.2 §6.2.2, Ch 7.3 §7.3.2

ST-07Uniform strip loadΔσz
Δσz = (q/π) · [ β + sin β · cos(β + 2δ) ]
Below the center line: Δσz = (q/π) · (β + sin β)

Variables. q = strip pressure (psf); β = angle subtended at the point by the loaded width (radians); δ = angle from the vertical to the near edge of the strip (radians, positive away from the strip)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
qstrip pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
βangle subtended at the point by the loaded width (radians)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
δangle from the vertical to the near edge of the strip (radians, positive away from the strip)Lab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group

Use. Long loads: a track bed, a wall footing or a long stockpile, where L ≥ about 5B.

Limitations. Plane strain, flexible load, elastic half-space. Confirm the sign convention for δ against the figure being used.

Source. Holl 1940; Poulos & Davis 1974 [45] · In the manual: Ch 6.2 Eq. 6.2-3

ST-08Embankment load (Osterberg)Δσz
Δσz = (q/π) · [ ((a + b)/a) · (α1 + α2) − (b/a) · α2 ]    (one side)
α1 = tan−1((a + b)/z) − tan−1(b/z),   α2 = tan−1(b/z),   q = γfill · H

Variables. H = embankment height (ft); γfill = fill unit weight (pcf); a = horizontal length of the side slope (ft); b = half the crest width (ft); z = depth below original ground (ft); angles in radians

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
Hembankment height (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γfillfill unit weight (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
ahorizontal length of the side slope (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
bhalf the crest width (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
zdepth below original ground (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Railroad embankments and approach fills. For a symmetric embankment, the stress below the center line is twice the one-side value.

Limitations. Elastic half-space under a flexible trapezoidal load; ignores fill stiffness and staged construction. Use the as-built cross section when it differs from the design section.

Source. Osterberg 1957 [44] [27] · In the manual: Ch 6.2 §6.2.2, Ch 6.2 §12.11

ST-092:1 (approximate) stress spreadΔσz
Δσz = Q / [ (B + z) · (L + z) ]    (rectangle)
Δσz = q · B / (B + z)    (strip, per foot)

Variables. Q = total load (lb); q = strip pressure (psf); B, L = loaded width and length (ft); z = depth below the loaded area (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Qtotal load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
qstrip pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
zdepth below the loaded area (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Quick checks and preliminary settlement estimates.

Limitations. Average stress only; under-predicts center-line stress at shallow depth (z < B) and should not replace ST-05 to ST-08 for final design.

Source. Approximation to Boussinesq [27] · In the manual: Ch 6.2 Eq. 6.2-2

F.2 Track Structure: Beam on Elastic Foundation and Load Spread

The rail as a beam on an elastic (Winkler) foundation, and the steps from wheel load to rail seat load, tie–ballast pressure and subgrade stress.

TR-01Track modulus (Winkler foundation)u
p(x) = u · y(x)
u = rail support force per inch of rail per inch of deflection (lb/in./in. = psi)

Variables. p = distributed support reaction under the rail (lb/in.); y = rail deflection (in.); u = track modulus (psi)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
pdistributed support reaction under the rail (lb/in.)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
yrail deflection (in.)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
utrack modulus (psi)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Continuous support of one rail by ties, ballast, subballast and subgrade together. Typical values: about 2,000–7,000 psi for mainline track.

Limitations. u lumps all layers below the rail into one spring and is not a soil property. It varies with load level and season; back-calculate it from deflection at representative loads (TR-05).

Source. Winkler 1867; Talbot (AREA) 1918 [64] [25] [50] · In the manual: Ch 2.3 §2.3.6

TR-02Characteristic length of the railβ, Lc
β = ( u / (4 E I) )1/4    (1/in.)
Lc = 1/β = ( 4 E I / u )1/4    (in.)

Variables. E = rail modulus = 30 × 106 psi; I = rail moment of inertia (in.4; 136RE ≈ 95 in.4); u = track modulus (psi)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Erail modulusAnother equationComputed: E = 30 × 10^6 psiproject-specific
Irail moment of inertia (in.^4Material property (published)Code or manufacturer value: steel E = 29,000,000 psi; concrete per ACI 318; rail and pile section properties from AREMA or producer tables.project-specific
utrack modulus (psi)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Sets how far a wheel load spreads along the rail; wheels within about 3Lc to 4Lc of each other interact.

Limitations. Beam on elastic foundation: ignores rail–tie gaps, voided ties and tie spacing. Results become poor where hanging ties or poor support are present.

Source. Hetényi 1946 [25] [50] · In the manual: Ch 2.3 §2.3.6

TR-03Rail deflection and bending momenty0, M0
y0 = P · β / (2u)    M0 = P / (4β) = P · Lc / 4
y(x) = (Pβ / 2u) · e−βx (cos βx + sin βx)    M(x) = (P / 4β) · e−βx (cos βx − sin βx)
Several wheels: y = Σ (Pi β / 2u) · e−βxi (cos βxi + sin βxi)

Variables. P = wheel load (lb); x = distance from the wheel (in.); y in in.; M in in.-lb. Zero moment at x = π/(4β); uplift begins at x = 3π/(4β)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Pwheel load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
xdistance from the wheel (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Single or multiple wheel loads on continuously supported rail; rail bending stress = M · c / I.

Limitations. Use the dynamic wheel load (TR-08) for design. Superposition is valid only within the linear range; the model does not represent ballast settlement or lift-off of unloaded ties.

Source. Hetényi 1946 [25] [50] · In the manual: Ch 2.3 §2.3.6, Ch 2.3 §2.11

TR-04Track modulus from measured deflectionu
u = [ P / (2 y0) ]4/3 / (4 E I)1/3

Variables. P = single applied wheel load (lb); y0 = measured rail deflection under that load (in.); E I as in TR-02

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Psingle applied wheel load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
y0measured rail deflection under that load (in.)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific

Use. Back-calculating u from a single-load test (loaded car or test vehicle) with the seating deflection subtracted.

Limitations. Take y0 as the deflection between two load levels (for example, a light seating load and the test load) so that voids under ties do not inflate it. Neighboring axles must be far enough away (> 4Lc) or included by superposition.

Source. Rearrangement of TR-03 [50] [34] · In the manual: Ch 2.3 §2.3.6

TR-05Rail seat load and tie–ballast pressureqr, pa
qr = u · y0 · a = P · β · a / 2    (Talbot: 0.391 P a / x1, x1 = (π/4) Lc)
pa = 2 qr / A'b,   A'b = (2/3) · b · ℓ    ⇒   pa = 3 qr / (b · ℓ)

Variables. a = tie spacing (in.); b = tie width (in.); ℓ = tie length (in.); A'b = effective tie bearing area, taken as the two tamped end thirds of the tie; the factor 2 is the load from both rail seats; qr in lb, pa in psi

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
atie spacing (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
btie width (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
ℓtie length (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
A'beffective tie bearing area, taken as the two tamped end thirds of the tieProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Ballast pressure check and the starting pressure for spreading load down to subgrade.

Limitations. Assumes uniform pressure over the tamped zones. AREMA limits average tie–ballast pressure to about 65 psi for timber ties and 85 psi for concrete ties; confirm against the edition in use. Center-bound or end-bound ties concentrate pressure well above the average.

Source. Talbot (AREA); AREMA MRE Ch. 1 and 30 [1] [50] · In the manual: Ch 2.3 §2.3.2

TR-06Pressure on subgrade by load-spread angleσs
σs = Pd / Aeff
Aeff = (Bt + 2d · tan θ) · (Lt + 2d · tan θ)

Variables. Pd = dynamic wheel load (lb); Bt, Lt = tie width and length (ft); d = ballast plus subballast thickness (ft); θ = spread angle (35° in the manual); σs in psf

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Pddynamic wheel load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
dballast plus subballast thickness (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
θspread angle (35° in the manual)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. First-order subgrade stress for comparing section thicknesses.

Limitations. Approximate: it ignores load sharing between ties and stiffness contrast between layers. Check against ST-04 superposition or a layered elastic analysis for heavy-axle or soft-subgrade sites.

Source. AREMA MRE Ch. 1 [1] · In the manual: Ch 2.3 §2.3.2

TR-07Dynamic wheel load (impact factor)Pd
Pd = Ps · (1 + θi)    θi = 33 V / (100 D)

Variables. Ps = static wheel load (lb; Cooper E-80 = 40,000 lb per wheel); V = train speed (mph); D = wheel diameter (in.)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Psstatic wheel load (lbLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
Vtrain speed (mph)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Dwheel diameter (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Converts static wheel load to a design dynamic load; the manual's DLF of 1.2 to 1.5 brackets typical results.

Limitations. Semi-empirical (derived from field measurements, not mechanics). It does not cover wheel flats, rail joints or bridge-approach stiffness transitions, which can raise loads well above this value.

Source. Talbot; AREMA MRE Ch. 1 and 30 [1] · In the manual: Ch 2.3 §2.3.2, Ch 6.1 §6.1.4

F.3 Bearing Capacity and Deep Foundations

Ultimate capacity of shallow footings and static axial capacity of piles and shafts.

BC-01General bearing capacity equationqult
qult = c' Nc Fcs Fcd Fci + q Nq Fqs Fqd Fqi + ½ γ B Nγ Fγs Fγd Fγi

Variables. c' = cohesion (psf); q = γ · Df, effective overburden at footing base (psf); γ = effective unit weight below the base (pcf); B = footing width, or B' for eccentric load (ft); N = bearing capacity factors (BC-02); F = shape, depth and inclination factors (BC-03 to BC-05)

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
c'cohesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
qintermediate value computed on this pageAnother equationComputed: q = γ · D_f, effective overburden at footing base (psf)project-specific
γeffective unit weight below the base (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
Bfooting width, or B' for eccentric load (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Nbearing capacity factors (BC-02)Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
Fintermediate value computed on this pageAnother equationComputed: F = shape, depth and inclination factors (BC-03 to BC-05)project-specific

Use. Shallow footings on soil, Df ≤ about B. Use drained (c', φ') or undrained (su, φ = 0) parameters as the loading requires.

Limitations. Assumes general shear failure. For loose sand or soft clay (local or punching shear) reduce strength (c* = 0.67c', tan φ* = 0.67 tan φ') or check settlement, which usually governs. Use γ' (buoyant) where the water table is within B below the base.

Source. Terzaghi 1943; Meyerhof 1963; Vesić 1973 [57] [38] [63] · In the manual: Ch 6.1 Eq. 6.1-1

BC-02Bearing capacity factorsNc, Nq, Nγ
Nq = eπ tan φ' · tan2(45° + φ'/2)
Nc = (Nq − 1) · cot φ'    (Nc = 5.14 for φ = 0)
Nγ = 2 (Nq + 1) · tan φ'

Variables. φ' = friction angle of the bearing soil (degrees)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
φ'friction angle of the bearing soil (degrees)Lab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. With BC-01.

Limitations. Nγ varies widely between authors (Vesić, Meyerhof, Hansen); state which is used. Factors grow very quickly above φ' ≈ 35°, so a few degrees of overestimate in φ' gives a large overestimate in capacity.

Source. Prandtl 1921; Reissner 1924; Vesić 1973 [63] · In the manual: Ch 6.1 Eq. 6.1-2

BC-03Shape factorsFs
Fcs = 1 + (B/L)(Nq/Nc)    Fqs = 1 + (B/L) tan φ'    Fγs = 1 − 0.4 (B/L)

Variables. B, L = footing width and length (ft), L ≥ B; use B', L' for eccentric loads. Strip: B/L = 0; square or circle: B/L = 1

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Rectangular, square and circular footings with BC-01.

Limitations. Empirically calibrated from model tests; do not mix shape factors from one author with Nγ from another.

Source. De Beer 1970, as given by Vesić 1973 [63] · In the manual: Ch 6.1 Eq. 6.1-3

BC-04Depth factorsFd
Df/B ≤ 1:   Fqd = 1 + 2 tan φ' (1 − sin φ')2 (Df/B)
Fcd = Fqd − (1 − Fqd) / (Nc tan φ')    (φ = 0: Fcd = 1 + 0.4 Df/B)    Fγd = 1
Df/B > 1: replace Df/B with tan−1(Df/B) in radians

Variables. Df = embedment depth (ft); B = footing width (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
Dfembedment depth (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Bfooting width (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Embedded footings where the soil above the base is competent and will remain in place.

Limitations. Omit depth factors (set to 1) where the embedment soil may be removed by scour, excavation or trenching, or is loose fill.

Source. Hansen 1970 [23] [63] · In the manual: Ch 6.1 Eq. 6.1-4

BC-05Load inclination factorsFi
Fci = Fqi = (1 − β°/90°)2    Fγi = (1 − β/φ')2

Variables. β = inclination of the resultant load from vertical (degrees); φ' = friction angle (degrees). If β ≥ φ', Fγi = 0

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
βinclination of the resultant load from vertical (degrees)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'friction angle (degrees)Lab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Abutments and wall footings with horizontal thrust.

Limitations. Also check sliding separately (EP-08); a footing can satisfy bearing and still slide.

Source. Meyerhof 1963; Hanna & Meyerhof 1981 [38] · In the manual: Ch 6.1 Eq. 6.1-5

BC-06Undrained bearing capacity of clay (Skempton)qult
qult = su · Nc + q
Nc ≈ 5 · (1 + 0.2 Df/B) · (1 + 0.2 B/L),   Df/B ≤ 2.5    (fit to Skempton's chart; strip limits 5.0 at the surface (exact π + 2 = 5.14) and 7.5 at depth)

Variables. su = undrained shear strength within about B below the base (psf); q = total overburden at the base (psf)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strength within about B below the base (psf)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
qtotal overburden at the base (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Short-term (end-of-construction) capacity of saturated clay; the manual's subgrade allowable stress qu/(π + 2)/FS is this case with qu = 2su.

Limitations. Total-stress analysis: valid only for rapid loading of saturated clay. Correct field vane su with Bjerrum's factor; Nc is capped near 9 for deep foundations.

Source. Skempton 1951 [51] · In the manual: Ch 6.1 §6.1.2, Ch 2.3 §2.3.4

BC-07Eccentric load: effective area and contact pressureB', qmax
eB = MB/P,   eL = ML/P    B' = B − 2eB,   L' = L − 2eL
qmax, min = (P / BL) · (1 ± 6eB/B)    (eB ≤ B/6)
eB > B/6: qmax = 4P / [3L(B − 2eB)]

Variables. P = vertical load (lb); M = moment about the footing centroid (ft-lb); B, L = footing dimensions (ft)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Pvertical load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
Mmoment about the footing centroid (ft-lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific

Use. Abutments, wall footings and crane-rail foundations with moment.

Limitations. Use B', L' in BC-01 to BC-05, and full B, L for settlement. AREMA keeps the resultant within the middle third (e ≤ B/6) for unfactored loads.

Source. Meyerhof 1953 [37] [11] · In the manual: Ch 6.1 Eq. 6.1-7, Ch 7.1 §7.1.5

BC-08Allowable bearing pressureqallow
qallow = (qult − q) / FS + q    qnet,allow = (qult − q) / FS

Variables. q = overburden pressure at the base (psf); FS = factor of safety (typically 2.5 to 3.0 for railroad structures)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
qoverburden pressure at the base (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
FSfactor of safety (typically 2.5 to 3.0 for railroad structures)Design criterionSet by the client railroad standards, AREMA, AASHTO, USACE or the project specification.typically 2.5 to 3.0 for railroad structures

Use. Converting ultimate to allowable capacity.

Limitations. The FS covers strength uncertainty only. The allowable pressure for design is the lower of this value and the pressure that gives tolerable settlement (SE-01 to SE-03).

Source. Terzaghi & Peck 1967 [59] · In the manual: Ch 6.1 Eq. 6.1-6

BC-09Static axial pile capacityQult
Qult = Qs + Qp = Σ fs,i · As,i + qp · Ap    Qallow = Qult / FS

Variables. fs = unit shaft resistance in layer i (psf); As = shaft surface area in layer i (ft2); qp = unit tip resistance (psf); Ap = tip area (ft2)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
fsunit shaft resistance in layer i (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Asshaft surface area in layer i (ft^2)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
qpunit tip resistance (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Aptip area (ft^2)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Driven piles and drilled shafts; fs and qp come from BC-10 to BC-12.

Limitations. Static analysis sets the estimate only; confirm with dynamic testing (PDA/CAPWAP) or a load test. Exclude shaft resistance in scourable, liquefiable or downdrag zones.

Source. Hannigan et al. 2016 [21] · In the manual: Ch 6.1 Eq. 6.1-9

BC-10Shaft resistance, effective stress (β) methodfs
fs = β · σ'v    β = K · tan δ

Variables. σ'v = effective vertical stress at mid-layer (psf); K = lateral earth pressure coefficient on the shaft; δ = pile–soil interface friction angle

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
σ'veffective vertical stress at mid-layer (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Klateral earth pressure coefficient on the shaftChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
δpile–soil interface friction angleLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group

Use. Sands, and long-term capacity in clays.

Limitations. The form is analytical, but K and δ are empirical and depend on installation; typical β = 0.25–0.40 for steel H-piles in sand. Do not let fs grow without limit with depth.

Source. Burland 1973 [12] [21] · In the manual: Ch 6.1 Eq. 6.1-12

BC-11Shaft and tip resistance in clay (total stress)fs, qp
fs = α · su    qp = 9 · su

Variables. α = adhesion factor (from the correlations in Chapter 6.1, Equation 6.1-11); su = undrained shear strength (psf)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
αadhesion factor (from the correlations in Chapter 6.1, Equation 6.1-11)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
suundrained shear strength (psf)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group

Use. Short-term capacity of piles and shafts in saturated clay.

Limitations. α is empirical; see the Empirical Equations reference for its limits. Nc = 9 assumes the tip is at least about 4 diameters into the bearing clay.

Source. Skempton 1951; Tomlinson 1957 [51] [21] · In the manual: Ch 6.1 Eq. 6.1-10

BC-12Pile tip resistance in sandqp
qp = σ'v,tip · Nq* ≤ 0.5 Pa Nq* tan φ' (Meyerhof 1976 limit)

Variables. σ'v,tip = effective vertical stress at the tip (psf); Nq* = bearing capacity factor for deep foundations (Vesić or Meyerhof chart)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
σ'v,tipeffective vertical stress at the tip (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Nq*bearing capacity factor for deep foundations (Vesić or Meyerhof chart)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Driven piles ending in sand or gravel.

Limitations. Nq* is highly sensitive to φ'. Cap qp at the limiting value (often 100–150 tsf for driven piles) and check against CPT or SPT-based methods.

Source. Meyerhof 1976; Vesić 1977 [21] · In the manual: Ch 6.1 Eq. 6.1-14

BC-13Pile group efficiency (Converse–Labarre)η
η = 1 − θ · [ (n − 1) m + (m − 1) n ] / (90 · m · n)    θ = tan−1(D/S) in degrees

Variables. m = number of columns; n = number of rows; D = pile diameter (ft); S = center-to-center spacing (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
mnumber of columnsChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
nnumber of rowsChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Dpile diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Scenter-to-center spacing (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Friction piles in clay at close spacing.

Limitations. Geometric rule, not mechanics. Driven piles in sand typically show η ≥ 1; for clay, also check block failure (BC-14) and use the lower capacity.

Source. Converse–Labarre formula, as given by Bowles 1996 [11] · In the manual: Ch 6.1 Eq. 6.1-17

BC-14Block failure of a pile group in clayQblock
Qblock = 2 Dg (Bg + Lg) · s̄u + Nc · su,tip · Bg · Lg

Variables. Dg = embedded depth of the group (ft); Bg, Lg = plan dimensions of the block around the outer piles (ft); s̄u = average su along the block perimeter (psf); su,tip = su at tip level (psf); Nc from BC-06 (up to 9)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Dgembedded depth of the group (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
s̄uaverage s_u along the block perimeter (psf)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
su,tips_u at tip level (psf)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
Ncintermediate value computed on this pageAnother equationComputed: N_c = from BC-06 (up to 9)project-specific

Use. Closely spaced friction pile groups in clay.

Limitations. Compare with the sum of individual pile capacities × η; the smaller governs.

Source. Terzaghi & Peck 1967 [59] · In the manual: Ch 6.1 Eq. 6.1-18

BC-15Uplift (tension) capacity of a pileQt
Qult,t = Σ fs,t · As + Wp

Variables. fs,t = unit shaft resistance in tension (psf, typically 0.75–0.80 of compression); Wp = effective pile weight (lb)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
fs,tunit shaft resistance in tension (psf, typically 0.75–0.80 of compression)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 0.75–0.80 of compression
Wpeffective pile weight (lb)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Tension piles, frost-jacking checks and overturning restraint.

Limitations. Use buoyant pile weight below the water table. Frost heave adfreeze is a separate load to be added, not a capacity.

Source. Hannigan et al. 2016 [21] · In the manual: Ch 6.1 Eq. 6.1-19

BC-16Chin hyperbolic extrapolation of a pile load testU
U = Δ / [(Δ/P) − K]

Variables. Δ = pile head settlement at load P; K = intercept of the Δ/P against Δ line; 1/U = its slope

Use. Ultimate capacity from a static test stopped before failure.

Limitations. Hyperbolic fits tend to overestimate capacity; use as an upper estimate and check a settlement-based criterion.

Source. Chin 1972, as given by Brown 2012 (Eq. 98.1) [73] · In the manual: Ch 5.3 §5.3.5.4

BC-17Pile base resistance from CPT (Dutch averaging)qb
qb,ult = 0.9 qc,m;   qb,0.1 = 0.6 qc,m

Variables. qc,m = weighted average cone resistance from 8D above to 4D below the toe; qb,0.1 = base resistance at settlement of 10% of the diameter

Use. Base resistance of piles in sand from CPT soundings.

Limitations. Shaft resistance correlations with qc vary from about qc/10 to qc/40; use BC-12 for the shaft.

Source. Bell and Robinson 2012 (Eqs. 54.13–54.14); Lehane et al. 2005 [75] · In the manual: Ch 6.1 §6.1.5.5

BC-18Low-strain pile integrity test relationsc, t, Δf
c = √(E/ρ);   t = 2L/c;   Z = ρcA;   Δf = c/(2L)

Variables. E, ρ = modulus and density of the pile; L = pile length; A = section area; Z = impedance; Δf = spacing of resonant peaks

Use. Interpreting sonic echo and frequency-response tests; checking pile length.

Limitations. Resolution falls in long piles and stiff ground; confirm suspected defects by cross-hole sonic logging.

Source. French and Turner 2012 (Eqs. 97.1–97.5) [74] · In the manual: Ch 5.3 §5.3.5.4

BC-19High-strain dynamic test: impedance and Case dampingRd
Z = EA/c;   F = Zv;   Rd = J Z vtoe

Variables. F = force; v = particle velocity; J = Case damping factor (sand 0.015–0.06 s/ft to clay 0.18–0.34 s/ft); vtoe = toe velocity

Use. Removing the dynamic (damping) resistance from a dynamic load test to estimate static capacity.

Limitations. Signal matching is preferred to the closed-form Case method; J depends on soil type.

Source. Brown 2012 (Eqs. 98.4–98.9; Table 98.6) [73] · In the manual: Ch 5.3 §5.3.5.4

F.4 Settlement and Consolidation

Elastic settlement, one-dimensional consolidation and its rate, secondary compression, and acceleration with surcharge and vertical drains.

SE-01Immediate (elastic) settlementSi
Si = q · B · (1 − ν2) · Iw / Es

Variables. q = net contact pressure (psf); B = footing width (ft); ν = Poisson's ratio (0.5 undrained clay; 0.3–0.35 sand); Es = soil modulus (psf); Iw = shape and rigidity factor

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
qnet contact pressure (psf)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
Bfooting width (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
νPoisson's ratio (0.5 undrained clayAssumed (published values)Rarely measured; choose from published ranges. Use 0.5 for undrained clay.0.25–0.40; 0.5 undrained · by USCS group
Essoil modulus (psf)Field test, lab test or correlationPressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc.loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group
Iwshape and rigidity factorChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Sands (most of the settlement) and undrained distortion of clays.

Limitations. Es is the controlling uncertainty; choose it for the stress and strain level of the problem. Homogeneous half-space; for layered or increasing stiffness use the strain-influence approach.

Source. Timoshenko & Goodier 1951; Bowles 1996 [61] [11] · In the manual: Ch 6.2 Eq. 6.2-4

SE-02Primary consolidation, normally consolidated claySc
Sc = [Cc / (1 + e0)] · H · log10[ (σ'v0 + Δσ) / σ'v0 ]
Sublayers: Sc = Σ (same expression for each sublayer i)

Variables. Cc = compression index; e0 = initial void ratio (ST-01); H = layer thickness (ft); σ'v0 = initial effective stress at mid-layer (psf); Δσ = stress increase at mid-layer (psf, from ST-04 to ST-09)

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
Cccompression indexLab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
e0initial void ratio (ST-01)Another equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
Hlayer thickness (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
σ'v0initial effective stress at mid-layer (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Δσintermediate value computed on this pageAnother equationComputed: Δσ = stress increase at mid-layer (psf, from ST-04 to ST-09)project-specific

Use. Clay where σ'v0 = σ'p (OCR = 1).

Limitations. One-dimensional compression; use sublayers no thicker than about 5–10 ft so that the log term is not averaged across a large stress change. Measure Cc and σ'p on undisturbed samples (ASTM D2435).

Source. Terzaghi 1925 [56] [27] · In the manual: Ch 6.2 Eq. 6.2-5, Ch 6.2 Eq. 6.2-10

SE-03Primary consolidation, overconsolidated claySc
σ'v0 + Δσ ≤ σ'p:   Sc = [Cr / (1 + e0)] · H · log10[ (σ'v0 + Δσ) / σ'v0 ]
σ'v0 + Δσ > σ'p:   Sc = [Cr / (1 + e0)] H log10(σ'p / σ'v0) + [Cc / (1 + e0)] H log10[ (σ'v0 + Δσ) / σ'p ]

Variables. Cr = recompression (swell) index, roughly Cc/5 to Cc/10; σ'p = preconsolidation stress (psf)

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
Crrecompression (swell) index, roughly C_c/5 to C_c/10Lab testUnload–reload slope of the e–log σ' curve (ASTM D2435). Screening: Cr ≈ Cc/5 to Cc/10.0.01–0.08 (inorganic clays) · by USCS group
σ'ppreconsolidation stress (psf)Lab test (or correlation)Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0.OCR 1 (NC) to > 4 (heavily OC) · by USCS group
Cccompression indexLab testSlope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10).CL 0.10–0.40, CH 0.35–0.90 · by USCS group
e0void ratioAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Overconsolidated or desiccated-crust clays, and reloading of old embankment foundations.

Limitations. The result depends strongly on σ'p; sample disturbance lowers measured σ'p and raises computed settlement.

Source. Terzaghi 1925; Holtz et al. 2011 [56] [27] · In the manual: Ch 6.2 Eq. 6.2-7

SE-04Consolidation settlement from mv or ΔeSc
Sc = Δe · H / (1 + e0) = mv · Δσ' · H
mv = av / (1 + e0),   av = −Δe / Δσ'

Variables. Δe = change in void ratio from the e–log σ' curve; mv = coefficient of volume compressibility (1/psf) over the actual stress range

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Δechange in void ratio from the e–log σ' curveAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
mvcoefficient of volume compressibility (1/psf) over the actual stress rangeChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Reading settlement directly from a consolidation test curve over the design stress range.

Limitations. mv is not constant; take it over the same stress interval as the design load.

Source. Terzaghi 1943; Holtz et al. 2011 [57] [27] · In the manual: Ch 6.2 §6.2.4

SE-05Time factor and coefficient of consolidationTv
Tv = cv · t / Hdr2    t = Tv · Hdr2 / cv
cv = k / (mv · γw)

Variables. cv = coefficient of consolidation (ft2/day); t = time (days); Hdr = drainage path (ft; H/2 for two-way drainage, H for one-way); k = permeability (ft/day); γw = 62.4 pcf

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
cvcoefficient of consolidation (ft^2/day)Lab test (or field)Consolidation test (ASTM D2435 or D4186), log-time or root-time fit at the design stress range. ch from CPTu dissipation tests.CL 0.05–1, CH 0.005–0.2 ft²/day · by USCS group
ttime (days)TimeElapsed test time (recorded) or the analysis time chosen for design.project-specific
Hdrdrainage path (ftProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
kpermeability (ft/day)Field or lab testField: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only.clean sand 1–100, clay < 0.001 ft/day · by USCS group
γw62.4 pcfConstantPhysical constant or standard value.project-specific

Use. Rate of primary consolidation under one-dimensional vertical drainage.

Limitations. Laboratory cv often under-predicts field rates where sand seams shorten Hdr; identify drainage boundaries from CPTu dissipation or continuous sampling.

Source. Terzaghi 1925 [56] · In the manual: Ch 6.2 Eq. 6.2-11, Ch 6.2 Eq. 6.2-13

SE-06Average degree of consolidationU
U = 1 − Σm=0∞ (2 / M2) · e−M2 Tv,   M = (π/2)(2m + 1)
U ≤ 60%: Tv = (π/4) · U2    U > 60%: Tv = 1.781 − 0.933 · log10(100 − U%)
S(t) = U · Sc    (T50 = 0.197, T90 = 0.848)

Variables. U = average degree of consolidation (decimal in the series and first approximation; percent in the second)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
Uaverage degree of consolidation (decimal in the series and first approximationChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Uniform initial excess pore pressure with depth (wide loads relative to layer thickness).

Limitations. For narrow loads or triangular pore pressure distributions the U–Tv relationship differs. Construction time spreads loading; treat the load as applied at mid-construction.

Source. Terzaghi 1925; Casagrande, as given by Taylor 1948 [56] [55] · In the manual: Ch 6.2 §6.2.5, Ch 6.2 Eq. 6.2-19

SE-07Secondary compressionSs
Ss = [Cα / (1 + ep)] · H · log10(t2 / t1)

Variables. Cα = secondary compression index; ep = void ratio at the end of primary consolidation; t1 = time to end of primary (days); t2 = end of design life (days)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Cαsecondary compression indexLab testSlope of e vs log time after primary consolidation in the consolidation test (ASTM D2435).Cα/Cc 0.03–0.08 · by USCS group
epvoid ratio at the end of primary consolidationAnother equatione = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435).sands 0.35–0.85, clays 0.5–2.0 · by USCS group
t1time to end of primary (days)TimeElapsed test time (recorded) or the analysis time chosen for design.project-specific
t2end of design life (days)Design criterionSet by the client railroad standards, AREMA, AASHTO, USACE or the project specification.project-specific

Use. Organic clays, peats and soft clays over a long service life.

Limitations. Cα drops after overconsolidation by surcharge; use the post-surcharge value where a surcharge is removed.

Source. Mesri 1973 [36] · In the manual: Ch 6.2 Eq. 6.2-14

SE-08Surcharge to offset settlementUreq
Ureq = (Sc,f + Ss,f) / Sc,(f+s)
ts = Tv(Ureq) · Hdr2 / cv

Variables. Sc,f = final primary settlement under the permanent load; Ss,f = secondary settlement to be removed; Sc,(f+s) = primary settlement under permanent load plus surcharge; ts = time the surcharge must stay in place

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
Sc,ffinal primary settlement under the permanent loadLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
Ss,fsecondary settlement to be removedField or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Sc,(f+s)primary settlement under permanent load plus surchargeLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
tstime the surcharge must stay in placeTimeElapsed test time (recorded) or the analysis time chosen for design.project-specific
cvcoefficient of consolidationLab test (or field)Consolidation test (ASTM D2435 or D4186), log-time or root-time fit at the design stress range. ch from CPTu dissipation tests.CL 0.05–1, CH 0.005–0.2 ft²/day · by USCS group

Use. Choosing surcharge height and duration for approach fills and embankments over soft clay.

Limitations. Ureq is an average; the mid-depth of a thick layer lags behind it. Use the U at the least consolidated point (mid-layer) where rebound after removal must be avoided, and confirm with settlement plates and piezometers.

Source. Johnson 1970 [31] · In the manual: Ch 6.2 §6.2.8

SE-09Radial consolidation to vertical drainsUr
Ur = 1 − exp(−8 Th / μ)    Th = ch · t / de2
μ = ln(n/s) + (kh/ks) · ln(s) − 0.75 + π z (2L − z) kh / qw,   n = de/dw,   s = ds/dw
de = 1.13 S (square) or 1.05 S (triangular)    dw = 2(a + b)/π

Variables. ch = horizontal coefficient of consolidation (ft2/day); de = drain influence diameter (ft); S = drain spacing (ft); dw, ds = drain and smear-zone diameters (ft); kh/ks = smear permeability ratio; L = drain length for one-way discharge (ft); z = depth (ft); qw = drain discharge capacity (ft3/day); a, b = PVD band dimensions (ft)

Inputs: where each value comes from (7)
SymbolWhat it isComes fromHow to get itTypical range
chhorizontal coefficient of consolidation (ft^2/day)Lab test (or field)Consolidation test (ASTM D2435 or D4186), log-time or root-time fit at the design stress range. ch from CPTu dissipation tests.CL 0.05–1, CH 0.005–0.2 ft²/day · by USCS group
dedrain influence diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Sdrain spacing (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
kh/kssmear permeability ratioField or lab testField: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only.clean sand 1–100, clay < 0.001 ft/day · by USCS group
Ldrain length for one-way discharge (ft)Hydraulic studyFrom the hydraulic model or study (HEC-RAS, FHWA HEC-18), stream gauge records or the drainage design.project-specific
zdepth (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
qwdrain discharge capacity (ft^3/day)Product dataManufacturer's data sheet for the specified product, confirmed by project QA testing.project-specific

Use. PVD and sand drain design. With no smear and no well resistance, μ ≈ ln(n) − 0.75.

Limitations. Smear parameters are uncertain and govern at close spacing; calibrate with a test section where possible.

Source. Barron 1948; Hansbo 1981 [6] [22] · In the manual: Ch 7.2 §7.2.3

SE-10Combined vertical and radial drainageU
(1 − U) = (1 − Uv) · (1 − Ur)

Variables. Uv from SE-06; Ur from SE-09

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Uvintermediate value computed on this pageAnother equationComputed: U_v = from SE-06project-specific
Urintermediate value computed on this pageAnother equationComputed: U_r = from SE-09project-specific

Use. Total degree of consolidation with PVDs in a layer that also drains vertically.

Limitations. Uv is usually small in thick clay with drains, so U ≈ Ur.

Source. Carillo 1942 [13] · In the manual: Ch 7.2 §7.2.3

SE-11Differential settlement and angular distortionδ/L
β = (SA − SB) / LAB

Variables. SA, SB = settlement at two points (in. or ft); LAB = distance between them (same units)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
LABdistance between them (same units)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Bridge-approach transitions, track profile and structure tolerance checks.

Limitations. Compare with the railroad's own limits (the manual cites 1/500 at Class 4 bridge approaches). Use predicted settlements at the same time after construction.

Source. Skempton & MacDonald 1956 [53] · In the manual: Ch 6.2 Eq. 6.2-16

SE-12Creep compression of fillΔs
Δs = α H log(t2/t1)

Variables. α = creep compression rate (% per log cycle; Table in §6.2.6.1); H = fill thickness; t1, t2 = times after placement

Use. Long-term settlement of new or old fills under track.

Limitations. Rates are from a small number of case histories; for the engineered rows α depends on σ′v in MPa.

Source. Skinner 2012 (Eq. 58.2), from Charles and Watts 2001 [69] · In the manual: Ch 6.2 §6.2.6.1

SE-13Self-weight settlement of an embankmentS
S ≈ 0.5 γ H² / D*

Variables. γ = fill unit weight; H = embankment height; D* = equivalent constrained modulus of the fill

Use. Settlement of the fill itself during and after construction.

Limitations. Vol. II omits the unit of the D* values it quotes (50 for compacted sandy gravel, 6 for low-plasticity clay; apparently MPa). Confirm against Charles (1993).

Source. Nowak 2012 (Eq. 70.7), after Trenter 2001 [70] · In the manual: Ch 6.2 §6.2.6.1

SE-14Collapse settlement from the saturated oedometer curveΔH
ΔH = Σ Hi (e0,i − esat,i) / (1 + e0,i)

Variables. e0,i = as-placed void ratio; esat,i = void ratio on the saturated compression curve at the layer stress

Use. Settlement of fill placed dry of optimum when it is first flooded.

Limitations. Away from slopes only; not for high-plasticity clay; depends on the height the fill becomes saturated.

Source. Thorel et al. 2011 [68] · In the manual: Ch 2.4 §2.4.20

F.5 Slope Stability (Limit Equilibrium)

Limit-equilibrium factors of safety for infinite slopes, circular and non-circular slip surfaces, and planar rock slides, with water and seismic loading.

SL-01Infinite slope, cohesionless, dry or submergedFS
FS = tan φ' / tan β

Variables. φ' = friction angle; β = slope angle

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
φ'friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
βslope angleProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Shallow sliding in clean sand, gravel and ballast shoulders.

Limitations. Shallow, slope-parallel failure only. Seepage out of the face roughly halves FS (SL-02).

Source. Taylor 1948 [55] [18] · In the manual: Ch 6.3 §6.3.2

SL-02Infinite slope with slope-parallel seepageFS
FS = c' / (γ z sin β cos β) + [ (γ − m γw) / γ ] · tan φ' / tan β

Variables. c' = effective cohesion (psf); γ = total unit weight (pcf; γsat below the phreatic surface); z = vertical depth to the slip surface (ft); m = height of the phreatic surface above the slip surface as a fraction of z (0 dry, 1 at the ground surface); β = slope angle

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
c'effective cohesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
γtotal unit weight (pcfLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
zvertical depth to the slip surface (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
mheight of the phreatic surface above the slip surface as a fraction of z (0 dry, 1 at the ground surface)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
βslope angleProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Shallow translational slides in embankment side slopes and residual soil cuts after rain.

Limitations. Assumes flow parallel to the slope. Use c' ≈ 0 unless shallow-stress testing supports more; a small c' has a large effect at shallow depth.

Source. Skempton & DeLory 1957 [52] [18] · In the manual: Ch 6.3 Eq. 6.3-15, Ch 3.8 §3.8.3

SL-03Infinite slope, undrainedFS
FS = su / (γ z sin β cos β)

Variables. su = undrained shear strength at depth z (psf)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strength at depth z (psf)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Short-term stability of long slopes in saturated clay.

Limitations. Total-stress analysis: valid for rapid loading only.

Source. Taylor 1948 [55] [18] · In the manual: Ch 6.3 §6.3.2

SL-04Ordinary method of slices (Fellenius)FS
FS = Σ [ c' ℓ + (W cos α − u ℓ) tan φ' ] / Σ W sin α

Variables. W = slice weight (lb/ft); α = inclination of the slice base (degrees); ℓ = length of the slice base = b / cos α (ft); u = pore pressure at the slice base (psf)

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
Wslice weight (lb/ft)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
αinclination of the slice base (degrees)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
ℓlength of the slice baseAnother equationComputed: ℓ = b / cos α (ft)project-specific
upore pressure at the slice base (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group

Use. Hand checks of circular surfaces.

Limitations. Ignores interslice forces; with high pore pressure it can be 10–60% conservative compared with Bishop. Use only as a check.

Source. Fellenius 1936 [20] [18] · In the manual: Ch 6.3 §6.3.3

SL-05Bishop simplified methodFS
FS = Σ [ (c' b + (W − u b) tan φ') / mα ] / Σ W sin α
mα = cos α · [ 1 + tan α · tan φ' / FS ]

Variables. b = slice width (ft); other symbols as in SL-04. Solve by iteration (FS appears on both sides)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
bslice width (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group

Use. Circular slip surfaces; the standard method for embankments and cuts in soil.

Limitations. Satisfies moment but not horizontal force equilibrium; not for non-circular surfaces. Watch for mα < about 0.2 at the toe, which inflates FS.

Source. Bishop 1955 [7] [18] · In the manual: Ch 6.3 Eq. 6.3-1, Ch 6.3 Eq. 6.3-2

SL-06Janbu simplified methodFS
FS = f0 · Σ [ (c' b + (W − u b) tan φ') / nα ] / Σ W tan α
nα = cos2α · [ 1 + tan α · tan φ' / FS ]
f0 = 1 + b1 · [ d/L − 1.4 (d/L)2 ],   b1 = 0.69 (c only), 0.31 (φ only), 0.50 (c and φ)

Variables. d = maximum depth of the slip surface below the chord from crest to toe (ft); L = chord length (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
dmaximum depth of the slip surface below the chord from crest to toe (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Lchord length (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group

Use. Non-circular (composite or planar) surfaces through weak layers.

Limitations. Force equilibrium only; f0 is an approximate correction for interslice shear. Prefer Spencer or Morgenstern–Price in software for final design.

Source. Janbu 1973 [29] [18] · In the manual: Ch 6.3 Eq. 6.3-5, Ch 6.3 Eq. 6.3-7

SL-07Pore pressure ratioru
ru = u / (γ h)    (W − u b) = W (1 − ru)    FS = m − n · ru

Variables. h = slice height (ft); m, n = stability coefficients from Bishop–Morgenstern charts

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
hslice height (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Simple representation of pore pressure in homogeneous embankments and chart solutions.

Limitations. A single ru cannot represent perched water or artesian pressure; use a piezometric surface for those.

Source. Bishop & Morgenstern 1960 [8] · In the manual: Ch 6.3 Eq. 6.3-4

SL-08Taylor stability number (φ = 0)Ns
FS = Ns · su / (γ H)

Variables. Ns = stability number from Taylor's chart, a function of slope angle and depth factor D = (depth to firm base)/H (5.52 for deep base failure, β < 53°); H = slope height (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Nsstability number from Taylor's chart, a function of slope angle and depth factor DAnother equationComputed: N_s = (depth to firm base)/H (5.52 for deep base failure, β < 53°)project-specific
Hslope height (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group

Use. Quick undrained checks of homogeneous clay slopes and embankment foundations.

Limitations. Homogeneous su, no water in cracks, no surcharge. Use software for layered sections.

Source. Taylor 1937 [54] · In the manual: Ch 6.3 Eq. 6.3-14

SL-09Tension crack depth and water forcezc, Pw
zc = 2c' / (γ √Ka)    (φ = 0: zc = 2 su / γ)
Pw = ½ γw zw2    acting horizontally at zw/3 above the crack bottom

Variables. Ka = tan2(45° − φ'/2); zw = depth of water in the crack (ft); Pw in lb/ft

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
Kaintermediate value computed on this pageAnother equationComputed: K_a = tan^2(45° − φ'/2)project-specific
zwdepth of water in the crack (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group

Use. Crest of cuts and embankments in cohesive soils; analysis with the crack assumed water-filled.

Limitations. Truncate the slip surface at the crack; do not count strength across the crack.

Source. Terzaghi 1943 [57] [18] · In the manual: Ch 6.3 Eq. 6.3-8, Ch 6.3 Eq. 6.3-9

SL-10Pseudo-static seismic loadingFeq, FS
Feq = kh · W
Infinite slope: FS = [ c' + (γ z cos2β − kh γ z sin β cos β − u) tan φ' ] / [ γ z sin β cos β + kh γ z cos2β ]

Variables. kh = horizontal seismic coefficient (fraction of g; often 0.5 PGA); W = weight of the sliding mass (lb/ft); u = pore pressure on the slip surface (psf)

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
khhorizontal seismic coefficient (fraction of gField or lab testField: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only.clean sand 1–100, clay < 0.001 ft/day · by USCS group
Wweight of the sliding mass (lb/ft)Another equationArea of the slice, wedge or wall section from the cross-section geometry × unit weight γ (from lab tests).project-specific
upore pressure on the slip surface (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Screening of slopes and embankments for earthquake loading.

Limitations. Treats a transient load as permanent; a FS below 1.0 means displacement, not necessarily failure. Follow with a Newmark estimate (DY-06). Not valid where strength loss or liquefaction is possible.

Source. Terzaghi 1950; Kramer 1996 [32] · In the manual: Ch 6.3 Eq. 6.3-10, Ch 6.3 Eq. 6.3-11

SL-11Plane failure in rock (Hoek and Bray)FS
FS = [ cj A + (W cos ψp − U − V sin ψp) tan φj ] / (W sin ψp + V cos ψp)
U = ½ γw zw A    V = ½ γw zw2

Variables. cj, φj = joint cohesion (psf) and friction angle; A = length of the sliding plane per foot of slope (ft2/ft); W = block weight (lb/ft); ψp = dip of the sliding plane; U = uplift on the plane; V = water force in the tension crack; zw = water depth in the crack (ft)

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
Alength of the sliding plane per foot of slope (ft^2/ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Wblock weight (lb/ft)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
ψpdip of the sliding planeProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Uuplift on the planeChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Vwater force in the tension crackLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
zwwater depth in the crack (ft)Field measurementGroundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level.project-specific

Use. Rock cuts where a discontinuity dips out of the face at less than the face angle and more than φj, within about ±20° of the face strike.

Limitations. Assumes a triangular uplift distribution and a single plane. Check wedges and toppling separately; use measured joint orientation, not one value.

Source. Hoek & Bray 1981 [26] [65] · In the manual: Ch 6.3 Eq. 6.3-13

SL-12Infinite slope with root cohesionFS
FS = (c′ + c′R) / (γ d sinβ cosβ) + tanφ′/tanβ

Variables. c′R = apparent root cohesion (grasses and shrubs about 40–125 psf; trees 65–210 psf); d = slip depth within the root zone

Use. Shallow slides on vegetated slopes; sensitivity to loss of cover.

Limitations. Most roots are within about 2 in. of the surface, tree roots to about 10 ft; check FS with c′R = 0.

Source. Nowak 2012 (Table 70.7), after Norris et al. 2008 [70] · In the manual: Ch 6.3 §6.3.18

SL-13Shear strength of unsaturated soil (extended Mohr–Coulomb)τ
τ = c′ + (σ − ua) tanφ′ + (ua − uw) tanφb

Variables. ua − uw = matric suction; φb = friction angle for suction (tanφb = Se tanφ′ in the Bishop form)

Use. Strength of fill and slopes above the water table.

Limitations. Suction is weather-dependent; never rely on it for design of a slope steeper than φ′.

Source. Fredlund, Morgenstern and Widger 1978 [77] · In the manual: Ch 6.4 §6.4.12

F.6 Lateral Earth Pressure and Retaining Walls

At-rest, active, passive and seismic earth pressure, surcharge from track loads, and the external stability of walls.

EP-01At-rest earth pressureK0
K0 = (1 − sin φ') · OCRsin φ'
σ'h0 = K0 · σ'v    σh0 = σ'h0 + u

Variables. φ' = friction angle; OCR = overconsolidation ratio; σ'v = effective vertical stress (psf)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
φ'friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
OCRoverconsolidation ratioLab test (or correlation)Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0.OCR 1 (NC) to > 4 (heavily OC) · by USCS group
σ'veffective vertical stress (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Walls that cannot move (culvert walls, braced or restrained abutments).

Limitations. Semi-empirical; compaction behind a rigid wall can raise lateral pressure above K0 near the top.

Source. Jaky 1944; Mayne & Kulhawy 1982 [28] [35] · In the manual: Ch 7.1 §7.1.2

EP-02Rankine active and passive pressureKa, Kp
Ka = tan2(45° − φ'/2)    Kp = tan2(45° + φ'/2)
σ'a = Ka σ'v − 2c' √Ka    σ'p = Kp σ'v + 2c' √Kp

Variables. σ'v = effective vertical stress at depth (psf); c' = effective cohesion (psf)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
σ'veffective vertical stress at depth (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
c'effective cohesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Vertical, frictionless back face with level backfill; the AREMA standard case with c' = 0.

Limitations. Active pressure needs wall movement of roughly 0.001H (dense sand) to 0.004H (loose sand); passive needs about ten times more. Neglect negative active pressure from c'.

Source. Rankine 1857 [46] · In the manual: Ch 7.1 §7.1.2

EP-03Rankine active pressure, sloping backfillKa
Ka = cos β · [ cos β − √(cos2β − cos2φ') ] / [ cos β + √(cos2β − cos2φ') ]
Resultant acts parallel to the backfill slope

Variables. β = backfill slope angle above horizontal (β ≤ φ')

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
βbackfill slope angle above horizontal (β ≤ φ')Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Cantilever walls with a sloping backfill, using the vertical plane through the heel.

Limitations. Not defined for β > φ'.

Source. Rankine 1857 [46] · In the manual: Ch 7.1 §7.1.2

EP-04Coulomb active and passive coefficientsKa, Kp
Ka = sin2(α + φ') / { sin2α · sin(α − δ) · [ 1 + √( sin(φ' + δ) sin(φ' − β) / (sin(α − δ) sin(α + β)) ) ]2 }
Kp = sin2(α − φ') / { sin2α · sin(α + δ) · [ 1 − √( sin(φ' + δ) sin(φ' + β) / (sin(α + δ) sin(α + β)) ) ]2 }

Variables. α = angle of the wall back face from horizontal (90° vertical); δ = wall friction angle; β = backfill slope above horizontal

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
αangle of the wall back face from horizontal (90° vertical)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
δwall friction angleLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group
βbackfill slope above horizontalProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Gravity, semi-gravity and MSE walls where wall friction acts.

Limitations. Coulomb Kp is unconservative for δ > φ'/2; use log-spiral values for passive resistance.

Source. Coulomb 1776 [16] · In the manual: Ch 7.1 §7.1.2

EP-05Resultant thrust with surcharge and waterPa
Pa = ½ Ka γ H2   (at H/3)    + Ka q H   (at H/2)
Water table at depth H1: use γ' below it and add Pw = ½ γw (H − H1)2

Variables. H = wall height (ft); γ = backfill unit weight (pcf); q = uniform surcharge (psf; Cooper E-80 equivalent 400 psf × DLF in the manual); thrust in lb/ft

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Hwall height (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γbackfill unit weight (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
quniform surcharge (psfLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
γ'buoyant unit weightAnother equationγ' = γsat − γw (γw = 62.4 pcf). Use below the water table.50–75 pcf for most mineral soils · by USCS group

Use. Wall design loads.

Limitations. A uniform surcharge is a simplification for track loads close to the wall; use EP-06 when the track is within about H of the wall.

Source. Rankine 1857; AREMA MRE Ch. 8 [46] [1] · In the manual: Ch 7.1 §7.1.2, Ch 7.1 §7.1.3

EP-06Lateral pressure from a strip or line loadσh
Strip load: σh = (2q/π) · (β − sin β cos 2α)
Line load, m = x/H > 0.4: σh = (4QL / πH) · m2 n / (m2 + n2)2    m ≤ 0.4: σh = (QL / H) · 0.203 n / (0.16 + n2)2

Variables. q = strip pressure (psf); β = angle subtended by the strip at the point on the wall (radians); α = angle from the vertical to the bisector of β (radians); QL = line load (lb/ft); x = distance from the wall to the line load (ft); n = z/H

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
qstrip pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
βangle subtended by the strip at the point on the wall (radians)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
αangle from the vertical to the bisector of β (radians)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
QLline load (lb/ft)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
xdistance from the wall to the line load (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
nintermediate value computed on this pageAnother equationComputed: n = z/Hproject-specific

Use. Track loads parallel to an abutment or wall; the strip form is the AREMA basis for Cooper E-80 surcharge.

Limitations. Boussinesq solutions doubled for an unyielding wall; overestimate pressure on walls that can yield. Use the dynamic track load as q.

Source. Terzaghi 1954; NAVFAC 1986; AREMA MRE Ch. 8 [58] [40] [1] · In the manual: Ch 7.1 §7.1.3

EP-07Seismic active thrust (Mononobe–Okabe)KAE
PAE = ½ γ H2 (1 − kv) KAE    θ = tan−1[ kh / (1 − kv) ]
KAE = cos2(φ' − θ − ψ) / { cos θ cos2ψ cos(δ + ψ + θ) [ 1 + √( sin(φ' + δ) sin(φ' − θ − β) / (cos(δ + ψ + θ) cos(β − ψ)) ) ]2 }
ΔPAE = PAE − Pa   at about 0.6H (Seed & Whitman 1970)

Variables. ψ = batter of the wall back face from vertical (0 for a vertical wall); β = backfill slope; kh, kv = seismic coefficients (fractions of g)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
ψbatter of the wall back face from vertical (0 for a vertical wall)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
βbackfill slopeProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Yielding walls with dry cohesionless backfill.

Limitations. Requires φ' − θ − β ≥ 0; no solution otherwise. The wall angle here is measured from vertical (unlike EP-04). Not for saturated backfill without hydrodynamic terms.

Source. Okabe 1926; Mononobe & Matsuo 1929 [43] [39] [49] · In the manual: Ch 7.1 §7.1.7

EP-08Retaining wall stability checksFS, e
FSsliding = (ΣV · tan δb + B ca + Pp) / ΣPh    FSoverturning = ΣMR / ΣMO
e = B/2 − (ΣMR − ΣMO) / ΣV    qmax, min = (ΣV / B)(1 ± 6e/B)

Variables. ΣV = total vertical load on the base (lb/ft); δb = base friction angle; ca = base adhesion (psf); Pp = passive resistance relied on (lb/ft); ΣPh = horizontal driving forces; MR, MO = resisting and overturning moments about the toe (ft-lb/ft)

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
ΣVtotal vertical load on the base (lb/ft)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
δbbase friction angleLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group
cabase adhesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
Pppassive resistance relied on (lb/ft)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
ΣPhhorizontal driving forcesLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific

Use. Cantilever, gravity and semi-gravity walls.

Limitations. Count passive resistance only below frost depth and below any soil that may be excavated. Also check bearing (BC-01, BC-07) and global stability (SL-05).

Source. Bowles 1996; AREMA MRE Ch. 8 [11] [1] · In the manual: Ch 7.1 §7.1.5, Ch 7.1 §16.9

EP-09Compaction-induced lateral pressure (Ingold)σ′h,m
σ′h,m = √(2Pγ/π);   zcr = K0√(2P/(πγ));   hc = (1/K0)√(2P/(πγ))

Variables. P = effective roller line load (lb/ft); γ = fill unit weight; envelope σv/K0 to zcr, constant to hc, then K0σv

Use. Rigid walls, headwalls and abutments with compacted backfill.

Limitations. For walls that do not yield to the active state; add surcharge and water separately.

Source. Pickles 2012 (Eqs. 64.1–64.3) [71] · In the manual: Ch 7.1 §7.1.19

EP-10Passive resistance of discrete piles (soldier piles)P
P = Kp b p′v (z ≤ 1.5b);   P = Kp² b p′v (z ≥ 1.5b);   P = (2 + 7z/3b) su b (z ≤ 3b);   P = 9 su b (z ≥ 3b)

Variables. b = pile width; z = depth below excavation; p′v = effective overburden there; spacing s > 3b; divide by s for per-foot-of-wall values

Use. Embedment of soldier piles below an excavation.

Limitations. Ultimate values; valid for Kp 3.0–5.3. Vol. II prints ≤ in both depth limits; the second of each pair is evidently ≥.

Source. Pickles 2012 (Eqs. 64.5–64.8), after Barton 1982 and Fleming et al. 1994 [71] · In the manual: Ch 7.1 §7.1.4.7

EP-11Depth of softened clay in front of an embedded wallL
L = √(12 cv t)

Variables. cv = coefficient of consolidation; t = time the excavation is open

Use. su taken as zero at the excavation level rising to the design value at depth L.

Limitations. Where no groundwater recharge is possible, use about 1.6 ft (0.5 m).

Source. Pickles 2012 (Eq. 64.4) [71] · In the manual: Ch 7.1 §7.1.4.7

EP-12Ground anchor fixed length from bondTult
Tult = π d L τult;   Tdesign = Tult/F

Variables. d = borehole diameter; L = fixed anchor length; τult = grout–ground bond (in clay αcu); F = global factor

Use. Preliminary fixed length of tiebacks.

Limitations. Bond values must be confirmed by anchor tests.

Source. Turner 2012 (Eqs. 66.1–66.6) [72] · In the manual: Ch 7.1 §7.1.4.7

F.7 Groundwater, Seepage and Wells

Darcy flow, laboratory and field permeability tests, flow nets, piping and uplift, and flow to wells and drains.

GW-01Darcy's lawq, v
Q = k · i · A    i = Δh / L
v = k · i    vs = k · i / n

Variables. k = hydraulic conductivity (ft/day); i = hydraulic gradient; A = gross flow area (ft2); v = discharge velocity; vs = seepage (pore) velocity; n = porosity

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
khydraulic conductivity (ft/day)Field or lab testField: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only.clean sand 1–100, clay < 0.001 ft/day · by USCS group
ihydraulic gradientChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Agross flow area (ft^2)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
vdischarge velocityHydraulic studyFrom the hydraulic model or study (HEC-RAS, FHWA HEC-18), stream gauge records or the drainage design.project-specific
vsseepage (pore) velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group
nporosityAnother equationn = e/(1 + e), from the void ratio.0.25–0.55 for most mineral soils · by USCS group

Use. Laminar flow in soil.

Limitations. Turbulent flow in open-graded ballast and coarse gravel departs from Darcy. Field k can differ from laboratory k by orders of magnitude.

Source. Darcy 1856 [17] · In the manual: Ch 2.8 Eq. 2.8-11, Ch 2.8 Eq. 2.8-13

GW-02Constant-head permeability testk
k = Q · L / (A · Δh · t)

Variables. Q = volume collected (ft3) in time t (s); L = specimen length (ft); A = specimen area (ft2); Δh = head difference (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Qvolume collected (ft^3) in time t (s)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Lspecimen length (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
Aspecimen area (ft^2)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
Δhhead difference (ft)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific

Use. Clean sands and gravels.

Limitations. Use de-aired water and keep gradients low to stay laminar.

Source. ASTM D2434 [17] · In the manual: Ch 2.8 Eq. 2.8-6

GW-03Falling-head permeability testk
k = (a · L / (A · t)) · ln(h1 / h2)

Variables. a = standpipe area (ft2); h1, h2 = heads at the start and end of time t (ft)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
astandpipe area (ft^2)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific

Use. Silts and clays.

Limitations. Confirm saturation (B-value) before testing.

Source. ASTM D5084 [17] · In the manual: Ch 2.8 Eq. 2.8-7

GW-04Equivalent permeability of layered soilkh, kv
kh,eq = Σ ki Hi / Σ Hi    kv,eq = Σ Hi / Σ (Hi / ki)

Variables. ki, Hi = permeability and thickness of layer i

Use. Stratified alluvium and embankment fill.

Limitations. Thin continuous sand seams control kh; a single clay layer controls kv.

Source. Harr 1962 [24] · In the manual: Ch 2.8 §2.8.5

GW-05Flow net seepage and exit gradientq, ie
q = k · H · (Nf / Nd)    ie = (H / Nd) / ℓ

Variables. H = total head loss (ft); Nf = number of flow channels; Nd = number of equipotential drops; ℓ = length of the last flow-net square at the exit (ft); q in ft3/day per ft

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Htotal head loss (ft)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Nfnumber of flow channelsHydraulic studyFrom the hydraulic model or study (HEC-RAS, FHWA HEC-18), stream gauge records or the drainage design.project-specific
Ndnumber of equipotential dropsChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
ℓlength of the last flow-net square at the exit (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Steady seepage under or through embankments and cofferdams.

Limitations. For anisotropic soil, draw the net on a transformed section (x scaled by √(kv/kh)) and use k = √(khkv).

Source. Forchheimer; Cedergren 1989 [14] · In the manual: Ch 2.8 Eq. 2.8-14

GW-06Critical gradient, piping and uplifticr, FS
icr = γ' / γw = (Gs − 1) / (1 + e)    FSpiping = icr / ie
Blanket uplift: FS = σv / u = Σ γi ti / (γw hp)

Variables. γ' = buoyant unit weight (pcf); ti = thickness of each blanket layer (ft); hp = piezometric head at the base of the blanket above its base (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
γ'buoyant unit weight (pcf)Another equationγ' = γsat − γw (γw = 62.4 pcf). Use below the water table.50–75 pcf for most mineral soils · by USCS group
tithickness of each blanket layer (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
hppiezometric head at the base of the blanket above its base (ft)Field measurementGroundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level.project-specific
Gsspecific gravity of solidsLab testSpecific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested.2.64–2.80 mineral; lower if organic · by USCS group

Use. Toe of embankments next to waterways, excavation bottoms and boils.

Limitations. Use large factors (the manual cites FS ≥ 4.0 for piping) because exit gradients are hard to estimate.

Source. Terzaghi 1943 [57] [14] · In the manual: Ch 2.8 Eq. 2.8-15, Ch 2.8 Eq. 2.8-16

GW-07Steady flow to a well, confined aquifer (Thiem)Q
Q = 2π k b (h2 − h1) / ln(r2 / r1)

Variables. b = aquifer thickness (ft); h1, h2 = heads at radial distances r1, r2 (ft); Q in ft3/day (1 gpm = 192.5 ft3/day)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
baquifer thickness (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Dewatering estimates and analysis of steady-state pumping tests.

Limitations. Fully penetrating well, homogeneous isotropic aquifer, steady state.

Source. Thiem 1906 [60] · In the manual: Ch 2.8 §2.8.6

GW-08Steady flow to a well, unconfined aquifer (Dupuit–Thiem)Q
Q = π k (H2 − hw2) / ln(R / rw)

Variables. H = saturated thickness before pumping (ft); hw = water depth in the well (ft); R = radius of influence (ft); rw = well radius (ft)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Hsaturated thickness before pumping (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
hwwater depth in the well (ft)Field measurementGroundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level.project-specific
Rradius of influence (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
rwwell radius (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific

Use. Wellpoint and deep-well yield in water-table aquifers.

Limitations. Dupuit assumes horizontal flow; drawdown at the well is under-predicted when it is large. Q is not sensitive to R because R enters through a logarithm.

Source. Dupuit 1863; Thiem 1906 [19] [60] · In the manual: Ch 2.8 Eq. 2.8-19

GW-09Transient pumping test (Cooper–Jacob)T, S
s = (2.303 Q / 4πT) · log10(2.25 T t / (r2 S))
T = 2.303 Q / (4π Δs)    S = 2.25 T t0 / r2    k = T / b

Variables. s = drawdown (ft); T = transmissivity (ft2/day); S = storativity; Δs = drawdown per log cycle of time (ft); t0 = zero-drawdown time intercept (days); r = distance to the observation well (ft)

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
sdrawdown (ft)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
Ttransmissivity (ft^2/day)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
SstorativityChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Δsdrawdown per log cycle of time (ft)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
t0zero-drawdown time intercept (days)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
rdistance to the observation well (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Confined aquifer pumping tests.

Limitations. Valid when u = r2S / (4Tt) ≤ 0.01 (some references accept 0.05); discard early-time data that do not meet it.

Source. Cooper & Jacob 1946 [15] · In the manual: Ch 2.8 Eq. 2.8-8, Ch 2.8 Eq. 2.8-10

GW-10Slug test (Bouwer–Rice)k
k = [ rc2 · ln(Re / rw) / (2 Le) ] · (1/t) · ln(y0 / yt)

Variables. rc = casing radius (ft); rw = effective well radius (ft); Re = effective radius from the Bouwer–Rice coefficients (ft); Le = screen length (ft); y0, yt = head displacement at the start and at time t

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
rccasing radius (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
rweffective well radius (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific
Reeffective radius from the Bouwer–Rice coefficients (ft)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Lescreen length (ft)Test setupDimension of the test equipment or specimen: from the test standard or the lab/field test record.project-specific

Use. Hydraulic conductivity of the soil around a monitoring well or piezometer.

Limitations. Tests only a small volume; a poorly developed screen gives low k.

Source. Bouwer & Rice 1976 [10] · In the manual: Ch 2.8 Eq. 2.8-5

GW-11Unconfined flow to a drain (Dupuit)q
q = k (h12 − h22) / (2L)

Variables. h1, h2 = saturated heights above the impermeable base at the source and at the drain (ft); L = flow length (ft); q in ft3/day per ft of drain

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
Lflow length (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Sizing longitudinal subdrains and side ditches that lower the water table under track.

Limitations. Horizontal flow; add rainfall infiltration separately where it is significant.

Source. Dupuit 1863 [19] [14] · In the manual: Ch 2.3 §2.3.8

GW-12Unsaturated hydraulic conductivity (Mualem–van Genuchten)k(Se)
k = ks Se0.5 [1 − (1 − Se1/m)m]2, m = 1 − 1/n

Variables. ks = saturated conductivity; Se = effective saturation from the van Genuchten water retention curve; n = van Genuchten parameter

Use. Seasonal infiltration and pore pressure in unsaturated fill.

Limitations. Conductivity is lower on wetting than drying at the same suction (hysteresis); field data for dumped fills are scarce.

Source. van Genuchten 1980; applied to railway embankments by O'Brien 2013 [76] [67] · In the manual: Ch 6.4 §6.4.12

F.8 Seismic and Dynamic Response

Wave-velocity moduli, site period, the liquefaction demand and capacity ratio, Newmark yield acceleration and seismic refraction.

DY-01Small-strain elastic moduli from wave velocityGmax
Gmax = ρ Vs2 = (γ / g) · Vs2    E = 2G (1 + ν)    M = (γ / g) · Vp2

Variables. γ = unit weight (pcf); g = 32.2 ft/s2; Vs, Vp = shear and compression wave velocity (ft/s); G, E, M in psf

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
γunit weight (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
g32.2 ft/s^2ConstantPhysical constant or standard value.project-specific
Vsshear-wave velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Interpreting MASW, crosshole, downhole and seismic CPT data.

Limitations. Very small strain (< 10−4%); reduce for design strain levels. Vp in saturated soil reflects the water (about 5,000 ft/s), not the soil skeleton.

Source. Elastic wave theory; Kramer 1996 [32] · In the manual: Ch 5.1 Eq. 5.1-15

DY-02Time-averaged shear wave velocityV̄s
V̄s = Σ di / Σ (di / Vs,i)    (top 100 ft for site class)

Variables. di = thickness of layer i (ft); Vs,i = its shear wave velocity (ft/s)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
dithickness of layer i (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Vs,iits shear wave velocity (ft/s)Field testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Seismic site classification.

Limitations. A travel-time average, not an arithmetic average; one soft layer pulls it down strongly.

Source. ASCE 7-22 [2] · In the manual: Ch 5.1 Eq. 5.1-16, Ch 6.5 §6.5.3

DY-03Fundamental period of a soil columnTs
Ts = 4H / V̄s

Variables. H = depth to bedrock or a strong impedance contrast (ft); V̄s = average shear wave velocity over H (ft/s)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Hdepth to bedrock or a strong impedance contrast (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
V̄saverage shear wave velocity over H (ft/s)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific

Use. Judging resonance of deep soft sites with bridge periods or embankment response.

Limitations. Single uniform layer on rigid base; period lengthens as strains increase during strong shaking.

Source. Kramer 1996 [32] · In the manual: Ch 6.5 §6.5.3

DY-04Cyclic stress ratio (Seed–Idriss)CSR
CSR = 0.65 · (amax / g) · (σv / σ'v) · rd

Variables. amax/g = peak ground surface acceleration (fraction of g); σv, σ'v = total and effective vertical stress at depth (psf); rd = stress reduction coefficient (Chapter 6.5)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
amax/gpeak ground surface acceleration (fraction of g)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
rdstress reduction coefficient (Chapter 6.5)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Liquefaction triggering demand at level-ground sites.

Limitations. Derived from a rigid-column argument with an empirical rd; use site response analysis where the soil profile is unusual or amax is large.

Source. Seed & Idriss 1971 [48] [66] · In the manual: Ch 6.5 §6.5.4

DY-05Factor of safety against liquefactionFSL
FSL = (CRR7.5 · MSF · Kσ · Kα) / CSR

Variables. CRR7.5 = cyclic resistance ratio for M7.5 from SPT, CPT or Vs (empirical curves); MSF = magnitude scaling factor; Kσ, Kα = overburden and static shear corrections

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
CRR7.5cyclic resistance ratio for M7.5 from SPT, CPT or V_s (empirical curves)Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
MSFmagnitude scaling factorPublished hazard / climate dataUSGS seismic design data / ASCE 7 hazard tool for the site location and site class (from Vs30 or SPT).project-specific
Vsshear-wave velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Saturated sands, non-plastic silts and gravelly sands.

Limitations. The ratio is analytical; CRR, MSF and K factors are empirical (see the Empirical Equations reference). Plastic fine-grained soils need cyclic softening criteria instead.

Source. Youd et al. 2001 [66] · In the manual: Ch 6.5 §6.5.4

DY-06Newmark yield accelerationky
Planar block: ky = (FSstatic − 1) · sin α
General: ky = the kh that gives FS = 1.0 in SL-05, SL-06 or SL-10

Variables. FSstatic = static factor of safety; α = angle of the sliding surface (for an infinite slope, α = β); ky as a fraction of g

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
FSstaticintermediate value computed on this pageAnother equationComputed: FS_static = static factor of safetyproject-specific
αangle of the sliding surface (for an infinite slope, α = β)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Input to permanent displacement estimates of slopes and embankments.

Limitations. Rigid sliding block; use the strength expected during shaking (reduced if strain-softening or excess pore pressure develops). The displacement correlations that use ky are empirical.

Source. Newmark 1965 [42] [30] · In the manual: Ch 6.5 §6.5.8, Ch 6.3 §6.3.4

DY-07Seismic refraction, two layersxc, h1
xc = 2h1 · √[ (V2 + V1) / (V2 − V1) ]    h1 = (xc / 2) · √[ (V2 − V1) / (V2 + V1) ]
From the intercept time: h1 = ti · V1 V2 / (2 √(V22 − V12))

Variables. V1, V2 = layer velocities (ft/s), V2 > V1; xc = crossover distance (ft); ti = intercept time (s); h1 = depth to the refractor (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
xccrossover distance (ft)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific
tiintercept time (s)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
h1depth to the refractor (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Depth to rock or to the water table along cuts and proposed structure sites.

Limitations. Fails where velocity decreases with depth (hidden layer) or where a thin layer does not produce first arrivals.

Source. Redpath 1973 [47] · In the manual: Ch 5.1 Eq. 5.1-17, Ch 5.1 Eq. 5.1-18

F.9 Subgrade, Frost and Reinforcement

Plate and deflectometer moduli, frost penetration, geosynthetic membranes and stone-column load sharing.

SG-01Elastic modulus from a plate or LWD testE
E = f · (1 − ν2) · σ0 · a / d0

Variables. σ0 = applied plate pressure (psi); a = plate radius (in.); d0 = center deflection (in.); f = 2 for a flexible plate (uniform pressure), π/2 for a rigid plate; E in psi

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
σ0applied plate pressure (psi)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
aplate radius (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
d0center deflection (in.)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
f2 for a flexible plate (uniform pressure), π/2 for a rigid plateChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Plate load tests and light weight deflectometer tests on subgrade and subballast.

Limitations. Composite modulus over about 1–1.5 plate diameters; it is stress-dependent, so report the stress level with the value.

Source. Timoshenko & Goodier 1951; ASTM E2583 [61] · In the manual: Ch 2.3 §2.3.6, Ch 7.3 §7.3.2

SG-02Frost penetration depth (Stefan, modified Berggren)X
X = λ · √( 48 k · F / L )    L = 144 · w · γd

Variables. X = frost depth (ft); k = thermal conductivity (BTU/hr·ft·°F; frozen-soil value, or the average of frozen and unfrozen values as in TM 5-852-6); F = surface freezing index = n × air freezing index (°F-days); L = volumetric latent heat (BTU/ft3); w = water content (decimal); γd = dry unit weight (pcf); λ = Aldrich–Paynter correction coefficient (≤ 1; λ = 1 gives the Stefan equation)

Inputs: where each value comes from (8)
SymbolWhat it isComes fromHow to get itTypical range
Xfrost depth (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
kthermal conductivity (BTU/hr·ft·°FPublished dataKersten charts in UFC 3-130-06 (TM 5-852-6) for the measured γd and w.fine-grained 0.8–1.4 BTU/hr·ft·°F · by USCS group
Fsurface freezing index = n × air freezing index (°F-days)Published hazard / climate dataDesign freezing index from NOAA climate records per UFC 3-130-06 (average of the 3 coldest winters in 30 years).project-specific
Lvolumetric latent heat (BTU/ft^3)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
wwater content (decimal)Lab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
γddry unit weight (pcf)Lab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
λAldrich–Paynter correction coefficient (≤ 1Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
λ1 gives the Stefan equation)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Frost depth for track subgrade protection and yard pavements.

Limitations. Stefan (λ = 1) over-predicts depth; the 48 converts °F-days to °F-hours (× 24) with the factor 2 of the derivation. Use the design freezing index of the coldest year in 10 or 30, not the mean.

Source. Stefan 1891; Aldrich & Paynter 1953 [3] [62] · In the manual: Ch 7.3 §7.3.5, Ch 2.3 §2.11

SG-03Geosynthetic spanning a gap (parabolic membrane)T
Th = wT · s2 / (8 y)    Tmax = Th · √(1 + (4y/s)2)
ε ≈ 8y2 / (3s2)

Variables. wT = vertical load on the reinforcement (psf, i.e. lb/ft per ft width); s = clear span between supports (ft); y = sag at mid-span (ft); ε = average strain; T in lb/ft

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
wTvertical load on the reinforcement (psf, i.eProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
sclear span between supports (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
ysag at mid-span (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
εaverage strainChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Load transfer platforms over column caps, voids and sinkholes.

Limitations. Solve T and y together with the reinforcement's stiffness (T = J · ε) so that the strain is compatible; use the long-term creep-reduced strength.

Source. Parabolic cable theory; BS 8006-1:2010 [4] · In the manual: Ch 7.2 §7.2.8

SG-04Stone columns: area ratio and stress concentrationas, n
as = (π/4)(D/s)2 (square)    as = (π / 2√3)(D/s)2 (triangular)
σc = σ / [1 + (n − 1) as]    σs = n σ / [1 + (n − 1) as]    Streated / Suntreated ≈ 1 / [1 + (n − 1) as]
qult ≈ as · qult,col + (1 − as) · qult,soil

Variables. D = column diameter (ft); s = column spacing (ft); σ = average applied stress (psf); σc, σs = stress on clay and on the column; n = stress concentration ratio σs/σc (typically 2–5)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Dcolumn diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
scolumn spacing (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
σaverage applied stress (psf)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
nstress concentration ratio σ_s/σ_c (typically 2–5)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 2–5

Use. Settlement reduction and bearing improvement with stone columns or aggregate piers.

Limitations. Equilibrium identities; n is chosen from experience or load tests. Not for very soft clay (su < about 300 psf) where columns bulge.

Source. Barksdale & Bachus 1983 [5] · In the manual: Ch 7.2 §7.2.4

F.10 References
  1. AREMA (2024). Manual for Railway Engineering. American Railway Engineering and Maintenance-of-Way Association, Lanham, MD. Chapters 1, 8 and 30.Find source ↗
  2. ASCE (2022). Minimum Design Loads and Associated Criteria for Buildings and Other Structures. ASCE/SEI 7-22, American Society of Civil Engineers, Reston, VA.Find source ↗
  3. Aldrich, H.P., and Paynter, H.M. (1953). Analytical Studies of Freezing and Thawing of Soils. Technical Report 42, Arctic Construction and Frost Effects Laboratory, U.S. Army Corps of Engineers, Boston.Find source ↗
  4. BSI (2010). BS 8006-1:2010, Code of Practice for Strengthened/Reinforced Soils and Other Fills. British Standards Institution, London.Find source ↗
  5. Barksdale, R.D., and Bachus, R.C. (1983). Design and Construction of Stone Columns, Vol. I. Report FHWA/RD-83/026, Federal Highway Administration, Washington, DC.Find source ↗
  6. Barron, R.A. (1948). Consolidation of fine-grained soils by drain wells. Transactions of the ASCE, 113, 718–742.Find source ↗
  7. Bishop, A.W. (1955). The use of the slip circle in the stability analysis of slopes. Géotechnique, 5(1), 7–17.Find source ↗
  8. Bishop, A.W., and Morgenstern, N. (1960). Stability coefficients for earth slopes. Géotechnique, 10(4), 129–153.Find source ↗
  9. Boussinesq, J. (1885). Application des Potentiels à l'Étude de l'Équilibre et du Mouvement des Solides Élastiques. Gauthier-Villars, Paris.Find source ↗
  10. Bouwer, H., and Rice, R.C. (1976). A slug test for determining hydraulic conductivity of unconfined aquifers with completely or partially penetrating wells. Water Resources Research, 12(3), 423–428.Find source ↗
  11. Bowles, J.E. (1996). Foundation Analysis and Design, 5th ed. McGraw-Hill, New York.Find source ↗
  12. Burland, J.B. (1973). Shaft friction of piles in clay — a simple fundamental approach. Ground Engineering, 6(3), 30–42.Find source ↗
  13. Carillo, N. (1942). Simple two and three dimensional cases in the theory of consolidation of soils. Journal of Mathematics and Physics, 21, 1–5.Find source ↗
  14. Cedergren, H.R. (1989). Seepage, Drainage, and Flow Nets, 3rd ed. Wiley, New York.Find source ↗
  15. Cooper, H.H., and Jacob, C.E. (1946). A generalized graphical method for evaluating formation constants and summarizing well-field history. Transactions, American Geophysical Union, 27(4), 526–534.Find source ↗
  16. Coulomb, C.A. (1776). Essai sur une application des règles de maximis et minimis à quelques problèmes de statique relatifs à l'architecture. Mémoires de Mathématique et de Physique, Académie Royale des Sciences, 7, 343–382.Find source ↗
  17. Darcy, H. (1856). Les Fontaines Publiques de la Ville de Dijon. Victor Dalmont, Paris.Find source ↗
  18. Duncan, J.M., Wright, S.G., and Brandon, T.L. (2014). Soil Strength and Slope Stability, 2nd ed. Wiley, Hoboken, NJ.Find source ↗
  19. Dupuit, J. (1863). Études Théoriques et Pratiques sur le Mouvement des Eaux, 2nd ed. Dunod, Paris.Find source ↗
  20. Fellenius, W. (1936). Calculation of the stability of earth dams. Transactions, 2nd Congress on Large Dams, Washington, DC, 4, 445–462.Find source ↗
  21. Hannigan, P.J., Rausche, F., Likins, G.E., Robinson, B.R., and Becker, M.L. (2016). Design and Construction of Driven Pile Foundations. FHWA-NHI-16-009 (GEC 12), Federal Highway Administration, Washington, DC.Find source ↗
  22. Hansbo, S. (1981). Consolidation of fine-grained soils by prefabricated drains. Proc. 10th International Conference on Soil Mechanics and Foundation Engineering, Stockholm, 3, 677–682.Find source ↗
  23. Hansen, J.B. (1970). A revised and extended formula for bearing capacity. Bulletin No. 28, Danish Geotechnical Institute, Copenhagen, 5–11.Find source ↗
  24. Harr, M.E. (1962). Groundwater and Seepage. McGraw-Hill, New York.Find source ↗
  25. Hetényi, M. (1946). Beams on Elastic Foundation. University of Michigan Press, Ann Arbor.Find source ↗
  26. Hoek, E., and Bray, J.W. (1981). Rock Slope Engineering, 3rd ed. Institution of Mining and Metallurgy, London.Find source ↗
  27. Holtz, R.D., Kovacs, W.D., and Sheahan, T.C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. Pearson, Upper Saddle River, NJ.Find source ↗
  28. Jaky, J. (1944). The coefficient of earth pressure at rest. Journal of the Society of Hungarian Architects and Engineers, 78(22), 355–358.Find source ↗
  29. Janbu, N. (1973). Slope stability computations. In Embankment-Dam Engineering, Casagrande Volume (Hirschfeld and Poulos, eds.), Wiley, New York, 47–86.Find source ↗
  30. Jibson, R.W. (2007). Regression models for estimating coseismic landslide displacement. Engineering Geology, 91(2–4), 209–218.Find source ↗
  31. Johnson, S.J. (1970). Precompression for improving foundation soils. Journal of the Soil Mechanics and Foundations Division, ASCE, 96(SM1), 111–144.Find source ↗
  32. Kramer, S.L. (1996). Geotechnical Earthquake Engineering. Prentice Hall, Upper Saddle River, NJ.Find source ↗
  33. Lambe, T.W., and Whitman, R.V. (1969). Soil Mechanics. Wiley, New York.Find source ↗
  34. Li, D., Hyslip, J., Sussmann, T., and Chrismer, S. (2016). Railway Geotechnics. CRC Press, Boca Raton, FL.Find source ↗
  35. Mayne, P.W., and Kulhawy, F.H. (1982). K0–OCR relationships in soil. Journal of the Geotechnical Engineering Division, ASCE, 108(GT6), 851–872.Find source ↗
  36. Mesri, G. (1973). Coefficient of secondary compression. Journal of the Soil Mechanics and Foundations Division, ASCE, 99(SM1), 123–137.Find source ↗
  37. Meyerhof, G.G. (1953). The bearing capacity of foundations under eccentric and inclined loads. Proc. 3rd International Conference on Soil Mechanics and Foundation Engineering, Zurich, 1, 440–445.Find source ↗
  38. Meyerhof, G.G. (1963). Some recent research on the bearing capacity of foundations. Canadian Geotechnical Journal, 1(1), 16–26.Find source ↗
  39. Mononobe, N., and Matsuo, H. (1929). On the determination of earth pressures during earthquakes. Proc. World Engineering Congress, Tokyo, 9, 177–185.Find source ↗
  40. NAVFAC (1986). Foundations and Earth Structures. Design Manual 7.02, Naval Facilities Engineering Command, Alexandria, VA.Find source ↗
  41. Newmark, N.M. (1935). Simplified Computation of Vertical Pressures in Elastic Foundations. Circular No. 24, Engineering Experiment Station, University of Illinois, Urbana.Find source ↗
  42. Newmark, N.M. (1965). Effects of earthquakes on dams and embankments. Géotechnique, 15(2), 139–160.Find source ↗
  43. Okabe, S. (1926). General theory of earth pressure. Journal of the Japanese Society of Civil Engineers, 12(1).Find source ↗
  44. Osterberg, J.O. (1957). Influence values for vertical stresses in a semi-infinite mass due to an embankment loading. Proc. 4th International Conference on Soil Mechanics and Foundation Engineering, London, 1, 393–394.Find source ↗
  45. Poulos, H.G., and Davis, E.H. (1974). Elastic Solutions for Soil and Rock Mechanics. Wiley, New York.Find source ↗
  46. Rankine, W.J.M. (1857). On the stability of loose earth. Philosophical Transactions of the Royal Society of London, 147, 9–27.Find source ↗
  47. Redpath, B.B. (1973). Seismic Refraction Exploration for Engineering Site Investigations. Technical Report E-73-4, U.S. Army Engineer Waterways Experiment Station, Explosive Excavation Research Laboratory, Livermore, CA.Find source ↗
  48. Seed, H.B., and Idriss, I.M. (1971). Simplified procedure for evaluating soil liquefaction potential. Journal of the Soil Mechanics and Foundations Division, ASCE, 97(SM9), 1249–1273.Find source ↗
  49. Seed, H.B., and Whitman, R.V. (1970). Design of earth retaining structures for dynamic loads. Proc. ASCE Specialty Conference on Lateral Stresses in the Ground and Design of Earth-Retaining Structures, Ithaca, NY, 103–147.Find source ↗
  50. Selig, E.T., and Waters, J.M. (1994). Track Geotechnology and Substructure Management. Thomas Telford, London.Find source ↗
  51. Skempton, A.W. (1951). The bearing capacity of clays. Proc. Building Research Congress, London, Division 1, 180–189.Find source ↗
  52. Skempton, A.W., and DeLory, F.A. (1957). Stability of natural slopes in London Clay. Proc. 4th International Conference on Soil Mechanics and Foundation Engineering, London, 2, 378–381.Find source ↗
  53. Skempton, A.W., and MacDonald, D.H. (1956). The allowable settlements of buildings. Proceedings of the Institution of Civil Engineers, 5(6), 727–768.Find source ↗
  54. Taylor, D.W. (1937). Stability of earth slopes. Journal of the Boston Society of Civil Engineers, 24(3), 197–246.Find source ↗
  55. Taylor, D.W. (1948). Fundamentals of Soil Mechanics. Wiley, New York.Find source ↗
  56. Terzaghi, K. (1925). Erdbaumechanik auf Bodenphysikalischer Grundlage. Deuticke, Vienna.Find source ↗
  57. Terzaghi, K. (1943). Theoretical Soil Mechanics. Wiley, New York.Find source ↗
  58. Terzaghi, K. (1954). Anchored bulkheads. Transactions of the ASCE, 119, 1243–1324.Find source ↗
  59. Terzaghi, K., and Peck, R.B. (1967). Soil Mechanics in Engineering Practice, 2nd ed. Wiley, New York.Find source ↗
  60. Thiem, G. (1906). Hydrologische Methoden. J.M. Gebhardt, Leipzig.Find source ↗
  61. Timoshenko, S.P., and Goodier, J.N. (1951). Theory of Elasticity, 2nd ed. McGraw-Hill, New York.Find source ↗
  62. U.S. Army and U.S. Air Force (1988). Arctic and Subarctic Construction: Calculation Methods for Determination of Depths of Freeze and Thaw in Soils. TM 5-852-6 / AFR 88-19, Vol. 6, Washington, DC.Find source ↗
  63. Vesić, A.S. (1973). Analysis of ultimate loads of shallow foundations. Journal of the Soil Mechanics and Foundations Division, ASCE, 99(SM1), 45–73.Find source ↗
  64. Winkler, E. (1867). Die Lehre von der Elastizität und Festigkeit. H. Dominicus, Prague.Find source ↗
  65. Wyllie, D.C., and Mah, C.W. (2004). Rock Slope Engineering: Civil and Mining, 4th ed. Spon Press, London.Find source ↗
  66. Youd, T.L., Idriss, I.M., et al. (2001). Liquefaction resistance of soils: summary report from the 1996 NCEER and 1998 NCEER/NSF workshops. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 127(10), 817–833.Find source ↗
  67. O'Brien, A.S. (2013). The assessment of old railway embankments – time for a change? In D. Gallipoli (ed.), Partial Saturation in Compacted Soils, 19–32. ICE Publishing, London.Find source ↗
  68. Thorel, L., Ferber, V., Caicedo, B., and Khokhar, I.M. (2011). Physical modelling of wetting-induced collapse in embankment base. Géotechnique, 61(5), 409–420.Find source ↗
  69. Skinner, H.D. (2012). Building on fills. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 58, 899–910. ICE Publishing, London.Find source ↗
  70. Nowak, P.A. (2012). Design of new earthworks. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 70, 1047–1066. ICE Publishing, London.Find source ↗
  71. Pickles, A. (2012). Geotechnical design of retaining walls. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 64, 981–1000. ICE Publishing, London.Find source ↗
  72. Turner, M. (2012). Geotechnical design of ground anchors. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 66, 1011–1030. ICE Publishing, London.Find source ↗
  73. Brown, M. (2012). Pile capacity testing. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 98, 1451–1470. ICE Publishing, London.Find source ↗
  74. French, S., and Turner, M. (2012). Pile integrity testing. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 97, 1419–1450. ICE Publishing, London.Find source ↗
  75. Bell, A., and Robinson, C. (2012). Single piles. ICE Manual of Geotechnical Engineering, Vol. II, Ch. 54, 803–822. ICE Publishing, London.Find source ↗
  76. van Genuchten, M.T. (1980). A closed-form equation for predicting the hydraulic conductivity of unsaturated soils. Soil Science Society of America Journal, 44, 892–898.Find source ↗
  77. Fredlund, D.G., Morgenstern, N.R., and Widger, R.A. (1978). The shear strength of unsaturated soils. Canadian Geotechnical Journal, 15(3), 313–321.Find source ↗