↑ Parent Menu⌂ Main Menu
← Appendix G ICE Manual Cross-Reference
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · open a dropdown to go to a section or subsection

G.3 ICE Manual to GHRM Cross-Reference

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.
Author: Daniel P. Colwell
G.3 ICE Manual to GHRM Cross-Reference

Each ICE chapter is listed with the GHRM chapters that cover the same subject, the most relevant first. Chapters marked new were written to fill a gap found during this comparison.

Table G-1. Volume I, Section 1: Context
ICE Ch.ICE chapter titleGHRM chapters
1Introduction to Section 1Ch. 1.0
2Foundations and other geotechnical elements in context: their roleCh. 1.0
3A brief history of the development of geotechnical engineeringCh. 1.0
4The geotechnical triangleCh. 1.0, Ch. 3.9
5Structural and geotechnical modellingCh. 6.1, Ch. 6.2
6Computer analysis principles in geotechnical engineeringCh. 6.3, Ch. 6.2
7Geotechnical risks and their context for the whole projectCh. 1.1, Ch. 3.8, Ch. 3.8
8Health and safety in geotechnical engineeringCh. 3.9, Ch. 4.1, Ch. 3.10 new, Ch. 5.4 new
9Foundation design decisionsCh. 6.1, Ch. 7.1
10Codes and standards and their relevanceCh. 1.0
11Sustainable geotechnicsCh. 1.0, Ch. 7.2
Table G-2. Volume I, Section 2: Fundamental principles
ICE Ch.ICE chapter titleGHRM chapters
12Introduction to Section 2Ch. 2.1
13The ground profile and its genesisCh. 2.1, Ch. 2.2, Ch. 2.13 new
14Soils as particulate materialsCh. 2.2, Ch. 2.3
15Groundwater profiles and effective stressesCh. 2.8
16Groundwater flowCh. 2.8, Ch. 6.4
17Strength and deformation behaviour of soilsCh. 5.2, Ch. 2.4, Ch. 2.5
18Rock behaviourCh. 2.7
19Settlement and stress distributionsCh. 6.2
20Earth pressure theoryCh. 7.1
21Bearing capacity theoryCh. 6.1
22Behaviour of single piles under vertical loadsCh. 6.1
23Slope stabilityCh. 6.3, Ch. 3.8
24Dynamic and seismic loading of soilsCh. 6.5, Ch. 2.3
25The role of ground improvementCh. 7.2
26Building response to ground movementsCh. 6.2, Ch. 3.8
27Geotechnical parameters and safety factorsCh. 5.2, App D
Table G-3. Volume I, Section 3: Problematic soils and their issues
ICE Ch.ICE chapter titleGHRM chapters
28Introduction to Section 3Ch. 2.9 new
29Arid soilsCh. 2.13 new
30Tropical soilsCh. 2.13 new
31Glacial soilsCh. 2.4, Ch. 2.5, Ch. 2.13 new
32Collapsible soilsCh. 2.9 new, Ch. 2.4
33Expansive soilsCh. 2.5, Ch. 2.13 new
34Non-engineered fillsCh. 2.10 new
35Organics/peat soilsCh. 2.6
36Mudrocks, clays and pyrite implicationsCh. 2.5, Ch. 2.12 new
37Sulfates and sulfides in soils and rocksCh. 2.12 new
38Soluble groundCh. 2.11 new
Table G-4. Volume I, Section 4: Site investigation
ICE Ch.ICE chapter titleGHRM chapters
39Introduction to Section 4Ch. 3.9
40The ground as a hazardCh. 3.8, Ch. 1.1, Ch. 3.5, Ch. 2.11 new, Ch. 3.10 new
41Man-made hazards and obstructionsCh. 3.10 new, Ch. 5.4 new
42Roles and responsibilitiesCh. 3.1, Ch. 8.1
43Preliminary studiesCh. 3.2, Ch. 3.4, Ch. 3.10 new
44Planning, procurement and managementCh. 3.9, Ch. 3.3, Ch. 3.1, Ch. 3.7
45Geophysical exploration and remote sensingCh. 5.1, Ch. 3.2, Ch. 2.11 new
46Ground explorationCh. 4.1
47Field geotechnical testingCh. 5.1
48Geo-environmental testingCh. 5.4 new
49Sampling and laboratory testingCh. 4.1, Ch. 5.2
50Geotechnical reportingCh. 8.4, Ch. 8.3
Table G-5. Volume II, Section 5: Design of foundations
ICE Ch.ICE chapter titleGHRM chapters
51Introduction to Section 5Ch. 6.1
52Foundation types and conceptual design principlesCh. 6.1
53Shallow foundationsCh. 6.1, Ch. 6.2
54Single pilesCh. 6.1
55Pile-group designCh. 6.1
56Rafts and piled raftsCh. 6.1
57Global ground movements and their effects on pilesCh. 6.1, Ch. 6.3
58Building on fillsCh. 2.10 new, Ch. 2.9 new
59Design principles for ground improvementCh. 7.2
60Foundations subjected to cyclic and dynamic loadsCh. 2.3, Ch. 6.5
Table G-6. Volume II, Section 6: Design of retaining structures
ICE Ch.ICE chapter titleGHRM chapters
61Introduction to Section 6Ch. 7.1
62Types of retaining wallsCh. 7.1
63Principles of retaining wall designCh. 7.1
64Geotechnical design of retaining wallsCh. 7.1
65Geotechnical design of retaining wall support systemsCh. 7.1
66Geotechnical design of grouted anchorsCh. 7.1
67Retaining walls as part of complete underground structureCh. 7.1
Table G-7. Volume II, Section 7: Design of earthworks, slopes and pavements
ICE Ch.ICE chapter titleGHRM chapters
68Introduction to Section 7Ch. 7.4 new
69Earthworks design principlesCh. 7.4 new, Ch. 6.3
70Design of new earthworksCh. 7.4 new, Ch. 2.3, Ch. 2.10 new
71Earthworks asset management and remedial designCh. 7.4 new, Ch. 3.8, Ch. 2.10 new
72Slope stabilisation methodsCh. 7.4 new, Ch. 6.3, Ch. 7.2
73Design of soil reinforced slopes and structuresCh. 7.1, Ch. 7.2
74Design of soil nailsCh. 7.1
75Earthworks material specification, compaction and controlCh. 5.3, Ch. 7.3
76Pavement foundation designCh. 7.3, Ch. 2.3
Table G-8. Volume II, Section 8: Construction processes
ICE Ch.ICE chapter titleGHRM chapters
77Introduction to Section 8Ch. 5.3
78Procurement and specificationCh. 3.1, Ch. 8.2
79Sequencing of geotechnical worksCh. 5.3, Ch. 5.5 new
80Groundwater controlCh. 2.8, Ch. 6.4
81Types of bearing pilesCh. 6.1
82Piling problemsCh. 5.3, Ch. 6.1
83UnderpinningCh. 7.2
84Ground improvementCh. 7.2
85Embedded wallsCh. 7.1
86Soil reinforcement constructionCh. 7.1, Ch. 7.2
87Rock stabilisationCh. 2.7, Ch. 7.4 new
88Soil nailing constructionCh. 7.1
89Grouted anchor constructionCh. 7.1
90Geotechnical grouting and soil mixingCh. 7.2, Ch. 2.11 new
91Modular foundations and retaining wallsCh. 7.1
Table G-9. Volume II, Section 9: Construction verification
ICE Ch.ICE chapter titleGHRM chapters
92Introduction to Section 9Ch. 5.3
93Quality assuranceCh. 5.3, Ch. 8.4
94Principles of geotechnical monitoringCh. 5.3, Ch. 5.5 new
95Types of geotechnical instrumentation and their usageCh. 5.3, Ch. 5.5 new
96Technical supervision of site worksCh. 5.3, Ch. 5.5 new
97Pile integrity testingCh. 5.3
98Pile capacity testingCh. 5.3, Ch. 6.1
99Materials and material testing for foundationsCh. 5.2, Ch. 5.3, Ch. 2.12 new
100Observational methodCh. 5.5 new
101Close-out reportsCh. 8.4
← Previous · Appendices Appendix F — Analytical Equations