↑ Parent Menu⌂ Main Menu
← Railway Ground Hazard Risk Management
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · open a dropdown to go to a section or subsection

Appendix G — ICE Manual Cross-Reference

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.
Author: Daniel P. Colwell

This appendix ties the GHRM to the ICE Manual of Geotechnical Engineering (Institution of Civil Engineers), the two-volume general reference on geotechnical practice. It lists the bibliographic details, maps every ICE chapter to the GHRM chapters that cover the same subject and back again, and records the gap-fill chapters written from the comparison.

G.1 About the ICE Manual and How It Is Used Here

The ICE Manual of Geotechnical Engineering is a two-volume reference published by the Institution of Civil Engineers. Volume I covers geotechnical principles, problematic soils and site investigation; Volume II covers the design of foundations, retaining structures, earthworks, slopes and pavements, construction processes and construction verification. It is written for practice in the United Kingdom and uses Eurocode terminology and SI units, but most of its content applies directly to North American railroad work.

This manual does not reproduce the ICE Manual. Its text, figures and tables are copyright of the publisher and are not copied here. Instead, every GHRM chapter carries a Further reading box listing the ICE chapters that cover the same subject, and the tables in this appendix map the two books to each other in both directions. Where the ICE Manual covers a subject the GHRM did not, new GHRM chapters have been written in original wording, in English units and for railroad conditions (Section G.4).

Readers who hold a licensed copy can go straight from a GHRM chapter to the matching ICE chapter. The ICE Manual is also available through the ICE Virtual Library and many engineering libraries.

G.2 Bibliographic Reference and Edition Notes

Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Vol. I: Geotechnical Engineering Principles, Problematic Soils and Site Investigation; Vol. II: Geotechnical Design, Construction and Verification. ICE Publishing, London.

Brown, M., Burland, J., Chapman, T., Higgins, K., Skinner, H. and Toll, D. (eds) (2023). ICE Manual of Geotechnical Engineering, 2nd edition, Vols I and II. Emerald Publishing, Bingley, on behalf of ICE Publishing.

Chapter numbers in this appendix follow the published contents of the manual: 101 chapters in nine sections, Chapters 1 to 50 in Volume I and 51 to 101 in Volume II. The chapter titles are given in full so that the right chapter can be found in either edition; if a chapter number in your copy differs, use the title.

G.3 ICE Manual to GHRM Cross-Reference

Each ICE chapter is listed with the GHRM chapters that cover the same subject, the most relevant first. Chapters marked new were written to fill a gap found during this comparison.

Table G-1. Volume I, Section 1: Context
ICE Ch.ICE chapter titleGHRM chapters
1Introduction to Section 1Ch. 1.0
2Foundations and other geotechnical elements in context: their roleCh. 1.0
3A brief history of the development of geotechnical engineeringCh. 1.0
4The geotechnical triangleCh. 1.0, Ch. 3.9
5Structural and geotechnical modellingCh. 6.1, Ch. 6.2
6Computer analysis principles in geotechnical engineeringCh. 6.3, Ch. 6.2
7Geotechnical risks and their context for the whole projectCh. 1.1, Ch. 3.8, Ch. 3.8
8Health and safety in geotechnical engineeringCh. 3.9, Ch. 4.1, Ch. 3.10 new, Ch. 5.4 new
9Foundation design decisionsCh. 6.1, Ch. 7.1
10Codes and standards and their relevanceCh. 1.0
11Sustainable geotechnicsCh. 1.0, Ch. 7.2
Table G-2. Volume I, Section 2: Fundamental principles
ICE Ch.ICE chapter titleGHRM chapters
12Introduction to Section 2Ch. 2.1
13The ground profile and its genesisCh. 2.1, Ch. 2.2, Ch. 2.13 new
14Soils as particulate materialsCh. 2.2, Ch. 2.3
15Groundwater profiles and effective stressesCh. 2.8
16Groundwater flowCh. 2.8, Ch. 6.4
17Strength and deformation behaviour of soilsCh. 5.2, Ch. 2.4, Ch. 2.5
18Rock behaviourCh. 2.7
19Settlement and stress distributionsCh. 6.2
20Earth pressure theoryCh. 7.1
21Bearing capacity theoryCh. 6.1
22Behaviour of single piles under vertical loadsCh. 6.1
23Slope stabilityCh. 6.3, Ch. 3.8
24Dynamic and seismic loading of soilsCh. 6.5, Ch. 2.3
25The role of ground improvementCh. 7.2
26Building response to ground movementsCh. 6.2, Ch. 3.8
27Geotechnical parameters and safety factorsCh. 5.2, App D
Table G-3. Volume I, Section 3: Problematic soils and their issues
ICE Ch.ICE chapter titleGHRM chapters
28Introduction to Section 3Ch. 2.9 new
29Arid soilsCh. 2.13 new
30Tropical soilsCh. 2.13 new
31Glacial soilsCh. 2.4, Ch. 2.5, Ch. 2.13 new
32Collapsible soilsCh. 2.9 new, Ch. 2.4
33Expansive soilsCh. 2.5, Ch. 2.13 new
34Non-engineered fillsCh. 2.10 new
35Organics/peat soilsCh. 2.6
36Mudrocks, clays and pyrite implicationsCh. 2.5, Ch. 2.12 new
37Sulfates and sulfides in soils and rocksCh. 2.12 new
38Soluble groundCh. 2.11 new
Table G-4. Volume I, Section 4: Site investigation
ICE Ch.ICE chapter titleGHRM chapters
39Introduction to Section 4Ch. 3.9
40The ground as a hazardCh. 3.8, Ch. 1.1, Ch. 3.5, Ch. 2.11 new, Ch. 3.10 new
41Man-made hazards and obstructionsCh. 3.10 new, Ch. 5.4 new
42Roles and responsibilitiesCh. 3.1, Ch. 8.1
43Preliminary studiesCh. 3.2, Ch. 3.4, Ch. 3.10 new
44Planning, procurement and managementCh. 3.9, Ch. 3.3, Ch. 3.1, Ch. 3.7
45Geophysical exploration and remote sensingCh. 5.1, Ch. 3.2, Ch. 2.11 new
46Ground explorationCh. 4.1
47Field geotechnical testingCh. 5.1
48Geo-environmental testingCh. 5.4 new
49Sampling and laboratory testingCh. 4.1, Ch. 5.2
50Geotechnical reportingCh. 8.4, Ch. 8.3
Table G-5. Volume II, Section 5: Design of foundations
ICE Ch.ICE chapter titleGHRM chapters
51Introduction to Section 5Ch. 6.1
52Foundation types and conceptual design principlesCh. 6.1
53Shallow foundationsCh. 6.1, Ch. 6.2
54Single pilesCh. 6.1
55Pile-group designCh. 6.1
56Rafts and piled raftsCh. 6.1
57Global ground movements and their effects on pilesCh. 6.1, Ch. 6.3
58Building on fillsCh. 2.10 new, Ch. 2.9 new
59Design principles for ground improvementCh. 7.2
60Foundations subjected to cyclic and dynamic loadsCh. 2.3, Ch. 6.5
Table G-6. Volume II, Section 6: Design of retaining structures
ICE Ch.ICE chapter titleGHRM chapters
61Introduction to Section 6Ch. 7.1
62Types of retaining wallsCh. 7.1
63Principles of retaining wall designCh. 7.1
64Geotechnical design of retaining wallsCh. 7.1
65Geotechnical design of retaining wall support systemsCh. 7.1
66Geotechnical design of grouted anchorsCh. 7.1
67Retaining walls as part of complete underground structureCh. 7.1
Table G-7. Volume II, Section 7: Design of earthworks, slopes and pavements
ICE Ch.ICE chapter titleGHRM chapters
68Introduction to Section 7Ch. 7.4 new
69Earthworks design principlesCh. 7.4 new, Ch. 6.3
70Design of new earthworksCh. 7.4 new, Ch. 2.3, Ch. 2.10 new
71Earthworks asset management and remedial designCh. 7.4 new, Ch. 3.8, Ch. 2.10 new
72Slope stabilisation methodsCh. 7.4 new, Ch. 6.3, Ch. 7.2
73Design of soil reinforced slopes and structuresCh. 7.1, Ch. 7.2
74Design of soil nailsCh. 7.1
75Earthworks material specification, compaction and controlCh. 5.3, Ch. 7.3
76Pavement foundation designCh. 7.3, Ch. 2.3
Table G-8. Volume II, Section 8: Construction processes
ICE Ch.ICE chapter titleGHRM chapters
77Introduction to Section 8Ch. 5.3
78Procurement and specificationCh. 3.1, Ch. 8.2
79Sequencing of geotechnical worksCh. 5.3, Ch. 5.5 new
80Groundwater controlCh. 2.8, Ch. 6.4
81Types of bearing pilesCh. 6.1
82Piling problemsCh. 5.3, Ch. 6.1
83UnderpinningCh. 7.2
84Ground improvementCh. 7.2
85Embedded wallsCh. 7.1
86Soil reinforcement constructionCh. 7.1, Ch. 7.2
87Rock stabilisationCh. 2.7, Ch. 7.4 new
88Soil nailing constructionCh. 7.1
89Grouted anchor constructionCh. 7.1
90Geotechnical grouting and soil mixingCh. 7.2, Ch. 2.11 new
91Modular foundations and retaining wallsCh. 7.1
Table G-9. Volume II, Section 9: Construction verification
ICE Ch.ICE chapter titleGHRM chapters
92Introduction to Section 9Ch. 5.3
93Quality assuranceCh. 5.3, Ch. 8.4
94Principles of geotechnical monitoringCh. 5.3, Ch. 5.5 new
95Types of geotechnical instrumentation and their usageCh. 5.3, Ch. 5.5 new
96Technical supervision of site worksCh. 5.3, Ch. 5.5 new
97Pile integrity testingCh. 5.3
98Pile capacity testingCh. 5.3, Ch. 6.1
99Materials and material testing for foundationsCh. 5.2, Ch. 5.3, Ch. 2.12 new
100Observational methodCh. 5.5 new
101Close-out reportsCh. 8.4
G.4 GHRM to ICE Manual Cross-Reference

The reverse index: for each GHRM chapter, the ICE chapters to read alongside it (shown as volume-chapter, e.g. I-32 = Volume I, Chapter 32).

Table G-10. GHRM chapters and matching ICE chapters
GHRMTitleICE chapters
Chapter 1.0Manual OverviewI-1, I-2, I-3, I-4, I-10, I-11
Chapter 1.1Introduction to Railway Ground Hazard Risk ManagementI-7, I-40
Chapter 2.1Track Foundation ElementsI-12, I-13
Chapter 3.8Failure Mechanisms and TriggersI-23, I-26, I-40
Chapter 2.2Soil and Rock ClassificationI-13, I-14
Chapter 2.3Track Substructure: Ballast, Subballast and SubgradeI-14, I-24, II-60, II-70, II-76
Chapter 2.4Silts: Properties, Typical Values and LiquefactionI-17, I-31, I-32
Chapter 2.5Clays: Properties, Typical Values and BehaviorI-17, I-31, I-33, I-36
Chapter 2.6Peats and Organic Soils: Properties, Typical Values and BehaviorI-35
Chapter 2.7Rock and Sand: Properties, Typical Values and BehaviorI-18, II-87
Chapter 2.8Groundwater Characterization and SeepageI-15, I-16, II-80
Chapter 2.9Collapsible Soils: Identification, Testing and Railroad ImpactsI-28, I-32, II-58
Chapter 2.10Non-Engineered Fills: Old Embankments, Waste and Made GroundI-34, II-58, II-70, II-71
Chapter 2.11Soluble Ground and Karst: Sinkholes, Voids and DissolutionI-38, I-40, I-45, II-90
Chapter 2.12Sulfates, Sulfides and Problem MudrocksI-36, I-37, II-99
Chapter 2.13Residual, Tropical and Arid SoilsI-13, I-29, I-30, I-31, I-33
Chapter 3.1Scoping ProposalsI-42, I-44, II-78
Chapter 3.2Desktop StudyI-43, I-45
Chapter 3.3Drilling ScopeI-44
Chapter 3.4Site Review and ReconnaissanceI-43
Chapter 3.5Site ConditionsI-40
Chapter 3.6Site Accessibility Study— (railroad-specific; no direct ICE equivalent)
Chapter 3.7Cost EstimatesI-44
Chapter 3.8Risk RatingsI-7, II-71
Chapter 3.8Ground Hazard Risk AssessmentI-7
Chapter 3.9Geotechnical Investigation Planning and ScopeI-4, I-8, I-39, I-44
Chapter 3.10Mining and Man-Made HazardsI-8, I-40, I-41, I-43
Chapter 4.1Borings and SamplingI-8, I-46, I-49
Chapter 5.1In Situ TestingI-45, I-47
Chapter 5.2Laboratory Testing ProgramI-17, I-27, I-49, II-99
Chapter 5.3Construction Monitoring and Field TestingII-75, II-77, II-79, II-82, II-92, II-93, II-94, II-95, II-96, II-97, II-98, II-99
Chapter 5.4Geo-Environmental Testing on Railroad CorridorsI-8, I-41, I-48
Chapter 5.5The Observational Method and Trigger-Action Response PlansII-79, II-94, II-95, II-96, II-100
Chapter 6.1Foundation Engineering: Bearing CapacityI-5, I-9, I-21, I-22, II-51, II-52, II-53, II-54, II-55, II-56, II-57, II-81, II-82, II-98
Chapter 6.2Settlement AnalysisI-5, I-6, I-19, I-26, II-53
Chapter 6.3Slope Stability AnalysisI-6, I-23, II-57, II-69, II-72
Chapter 6.4Infiltration and SeepageI-16, II-80
Chapter 6.5Seismic Hazard and LiquefactionI-24, II-60
Chapter 7.1Retaining StructuresI-9, I-20, II-61, II-62, II-63, II-64, II-65, II-66, II-67, II-73, II-74, II-85, II-86, II-88, II-89, II-91
Chapter 7.2Ground Improvement MethodsI-11, I-25, II-59, II-72, II-73, II-83, II-84, II-86, II-90
Chapter 7.3Pavement Subgrade EvaluationII-75, II-76
Chapter 7.4Earthworks Asset Management and Remedial DesignII-68, II-69, II-70, II-71, II-72, II-87
Chapter 8.1Exploration Versus InvestigationI-42
Chapter 8.2Change OrdersII-78
Chapter 8.3MemorandumsI-50
Chapter 8.4Geotechnical Report PreparationI-50, II-93, II-101
Appendices A–CAppendices— (railroad-specific; no direct ICE equivalent)
Appendix DTypical Soil PropertiesI-27
Appendix FAnalytical Equations— (railroad-specific; no direct ICE equivalent)
G.5 Gap-Fill Chapters Added from the Comparison

Comparing the two manuals chapter by chapter showed that the GHRM already covered most ICE subjects, often in more railroad-specific depth (track substructure, ballast, risk ratings, desktop study and cost). The ICE Manual covered nine subjects that the GHRM did not treat as chapters. These were written as new GHRM chapters in original wording, English units and railroad context, each with a worked example in the GHRM five-part format, and numbered so that no existing chapter was renumbered.

Table G-11. New GHRM chapters and the ICE chapters they parallel
GHRMTitleParallel ICE chapters
Ch. 2.9Collapsible Soils: Identification, Testing and Railroad ImpactsI-28, I-32, I-29, II-58
Ch. 2.10Non-Engineered Fills: Old Embankments, Waste and Made GroundI-34, II-58, II-70, II-71
Ch. 2.11Soluble Ground and Karst: Sinkholes, Voids and DissolutionI-38, I-40, I-45, II-90
Ch. 2.12Sulfates, Sulfides and Problem MudrocksI-36, I-37, II-99
Ch. 2.13Residual, Tropical and Arid SoilsI-13, I-29, I-30, I-31, I-33
Ch. 3.10Mining and Man-Made HazardsI-40, I-41, I-8, I-43
Ch. 5.4Geo-Environmental Testing on Railroad CorridorsI-48, I-41, I-8
Ch. 5.5The Observational Method and Trigger-Action Response PlansII-100, II-94, II-95, II-96, II-79
Ch. 7.4Earthworks Asset Management and Remedial DesignII-68, II-69, II-70, II-71, II-72, II-87

Subjects the GHRM covers that have no direct ICE chapter include the railroad track substructure, the risk ratings and risk assessment framework, the desktop study and site accessibility study, cost estimates and change orders. These reflect the GHRM's purpose as a railroad ground hazard manual rather than a general geotechnical text.

← Previous · Appendices Appendix F — Analytical Equations