↑ Parent Menu⌂ Main Menu
← Appendix G ICE Manual Cross-Reference
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · open a dropdown to go to a section or subsection

G.1 About the ICE Manual and How It Is Used Here

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.
Author: Daniel P. Colwell
G.1 About the ICE Manual and How It Is Used Here

The ICE Manual of Geotechnical Engineering is a two-volume reference published by the Institution of Civil Engineers. Volume I covers geotechnical principles, problematic soils and site investigation; Volume II covers the design of foundations, retaining structures, earthworks, slopes and pavements, construction processes and construction verification. It is written for practice in the United Kingdom and uses Eurocode terminology and SI units, but most of its content applies directly to North American railroad work.

This manual does not reproduce the ICE Manual. Its text, figures and tables are copyright of the publisher and are not copied here. Instead, every GHRM chapter carries a Further reading box listing the ICE chapters that cover the same subject, and the tables in this appendix map the two books to each other in both directions. Where the ICE Manual covers a subject the GHRM did not, new GHRM chapters have been written in original wording, in English units and for railroad conditions (Section G.4).

Readers who hold a licensed copy can go straight from a GHRM chapter to the matching ICE chapter. The ICE Manual is also available through the ICE Virtual Library and many engineering libraries.

← Previous · Appendices Appendix F — Analytical Equations