This chapter covers the field reconnaissance: planning and safety, what to look for on the track, slopes and drainage, how to document it with geotagged photographs and flagging, and how the findings are reported. The reconnaissance feeds the site conditions write-up (Chapter 3.5), the access study (Chapter 3.6), the drilling scope (Chapter 3.3) and the field risk assessment of Chapter 3.8.
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Field criteria a reviewer can check on site: ballast fouling by sieve, GPR response and ditch side slopes. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Fouling index FI = P4 + P200 | Ballast – Clean | Selig & Waters categories | 1 | % | AREMA19 T1-2-3, p.1-2-15 | |||
| Fouling index FI = P4 + P200 | Ballast – Moderately clean | Selig & Waters categories | 1 | 5.5 | 10 | % | AREMA19 T1-2-3, p.1-2-15 | |
| Fouling index FI = P4 + P200 | Ballast – Moderately fouled | Selig & Waters categories | 10 | 15 | 20 | % | AREMA19 T1-2-3, p.1-2-15 | |
| Class I railroad criterion – percent passing ¾-in. sieve | Ballast – Moderately fouled | Single-sieve field test | 25 | 32.5 | 40 | % | LI16 T3.4, p.86 | |
| Fouling index FI = P4 + P200 | Ballast – Fouled | Selig & Waters categories | 20 | 30 | 40 | % | AREMA19 T1-2-3, p.1-2-15 | |
| Class I railroad criterion – percent passing ¾-in. sieve | Ballast – Fouled | Single-sieve field test | 40 | 45 | 50 | % | LI16 T3.4, p.86 | |
| Fouling index FI = P4 + P200 | Ballast – Highly fouled | Selig & Waters categories | 40 | % | AREMA19 T1-2-3, p.1-2-15 | |||
| Class I railroad criterion – percent passing ¾-in. sieve | Ballast – Highly fouled | Single-sieve field test | 50 | % | LI16 T3.4, p.86 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| GPR dielectric permittivity | Air | 1 | – | LI16 T8.5, p.371 | ||||
| GPR dielectric permittivity | Fresh water | 80 | 80.5 | 81 | – | LI16 T8.5, p.371 | ||
| GPR dielectric permittivity | Clayey soil (dry to wet) | 4 | 10 | 16 | – | LI16 T8.5, p.371 | ||
| GPR dielectric permittivity | Sandy soil (dry to wet) | 4 | 14.5 | 25 | – | LI16 T8.5, p.371 | ||
| GPR dielectric permittivity | Silty soil (dry to wet) | 9 | 16 | 23 | – | LI16 T8.5, p.371 | ||
| GPR dielectric permittivity | Granite ballast (dry to wet) | 5 | 6 | 7 | – | LI16 T8.5, p.371 | ||
| GPR dielectric permittivity | Basalt ballast (wet) | 8 | – | LI16 T8.5, p.371 | ||||
| GPR dielectric permittivity | Limestone ballast (dry to wet) | 7 | 7.5 | 8 | – | LI16 T8.5, p.371 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Ditch side-slope range for seed protection type | Mulch (anchored; hydromulch with tackifier best) | 3H:1V or flatter | 3H:1V or flatter | H:V | MNDITCH T3, p.36 | |||
| Ditch side-slope range for seed protection type | Straw erosion control blanket with netting | 3H:1V to 2H:1V | 3H:1V to 2H:1V | H:V | MNDITCH T3, p.36 | |||
| Ditch side-slope range for seed protection type | Wood fiber blanket with netting | 3H:1V or steeper | 3H:1V or steeper | H:V | MNDITCH T3, p.36 | |||
| Ditch side-slope range for seed protection type | Turf reinforcement mat (permanent) | 2H:1V to 1H:1V | 2H:1V to 1H:1V | H:V | MNDITCH T3, p.36 |
| Estimate | Correlation | Limits / notes | Source |
|---|---|---|---|
| Fouling index | FI = P4 + P200 (percent passing No. 4 and No. 200 sieves) | Selig & Waters (1994); categories clean < 1 … highly fouled > 40 | LI16 Eq. 3.1, p.84 |
| GPR velocity and depth | v = c/√εr ≈ 0.98/√εr ft/ns; depth = v t / 2 | t = two-way travel time (ns); 'rule of 3': air 0.98, dry soil (εr ≈ 9) 0.33, fresh water 0.11 ft/ns | UTSI Ch. 4, p.40 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Track substructure: see Track Substructure Practice (Chapter 13) for subgrade problems, ballast fouling, maintenance do's and don'ts, work next to the track, aerial geohazard inspection, hydrology and scour, and curve geometry.
No desktop study survives the first walk of the site unchanged. The reconnaissance confirms or moves the planned borings, finds the way in for the rig, and records the evidence of instability or poor drainage that the maps cannot show. On ground hazard work it is also the field half of the risk rating: what the engineer sees sets the defect rating and confirms the trigger (Chapter 3.8).
| Objective | Output |
|---|---|
| Confirm or relocate planned borings | Stakes or paint at each boring; relocations recorded with distance and direction |
| Find and flag access | Ribbon-flagged routes from drivable surfaces to each off-road boring |
| Document vegetation, slopes, ditches, soft ground and obstructions | Geotagged photo log; quantities for clearing and mats (Chapter 3.6) |
| Identify utilities, property lines and permits | Utility marks, cabinets and conduits photographed; owners along each route |
| Record instability and drainage evidence | Field worksheet blocks for conditions and instabilities (Section 3.8.24) |
| Talk with the people who know the site | Notes from track forces, yard staff and landowners |
Go with the desktop study map loaded on a phone or tablet, the proposed boring coordinates, and a short list of questions. Plan the walk so that each boring is visited from the direction the rig will come.
| Item | Notes |
|---|---|
| Railroad safety training, badge, PPE | Required for everyone on the right-of-way; arrange a flagman or lookout where the walk is within the fouling zone |
| Permission | Coordinate with the railroad and any landowners whose ground the routes cross |
| Map file and coordinates | Desktop study KMZ with borings, legacy borings, utilities, parcels, wetlands |
| Phone or tablet with geotagged camera | Check that location and compass direction are being recorded |
| Flagging ribbon, stakes, marking paint | One color for routes, another for borings |
| Field notebook and worksheet | Route stations; the ground hazard field form where a risk assessment is being made |
| Hand tools | Probe rod or hand auger for soft ground; tape; clinometer |
The track is the most sensitive instrument on the site. Before walking off the right-of-way, look along the rails from both ends of the site.
| Indicator | What it may mean |
|---|---|
| Dips in profile, cross-level variation, alignment kinks | Subgrade settlement, slope movement or a soft spot over a culvert |
| Fresh ballast in one location, or ballast built up on the shoulder | Repeated surfacing to correct a recurring defect |
| Mud pumping, fouled ballast, standing water in the cribs | Poor drainage and soft subgrade |
| Narrow or steep shoulder, ballast spilling down the slope | Loss of embankment width; erosion or slope creep |
| Slow-order signs | A defect the railroad is already managing |
Ask the railroad for the geometry-car exception history and surfacing records for the segment; whether the same defect comes back between surfacing cycles is the evidence the defect rating of Table 3.8-10 is built on.
| Indicator | Where to look | Significance |
|---|---|---|
| Tension cracks, scarps | Shoulder and crest | Active or recent movement |
| Bulges, hummocky ground | Mid-slope and toe | Displaced mass; toe of a slide |
| Seeps, wet zones, cattails or reeds | Face and toe | High phreatic surface; softening |
| Leaning trees and poles, bowed fences | Face and toe | Slow creep |
| Erosion, gullies, undercut toe | Toe at a creek or ditch | Scour-driven mechanism |
| Weathered, jointed or sheared rock; fallen blocks | Rock cuts | Rockfall source |


Most of the ground hazards on a railroad are drainage problems first. Walk every culvert inlet and outlet and every ditch that carries water toward or away from the fill.
| Feature | Look for |
|---|---|
| Culvert inlets | Silt, debris, vegetation or beaver activity reducing the opening; ponding or water marks upstream; headwall condition |
| Culvert outlets | Scour holes, undermined headwalls, separated or crushed pipe, piping through the fill |
| Ditches and swales | Standing water, mud bottoms, cut channels, blocked flow; color and odor of water |
| Toe of fill | Water ponded against the fill; soft, wet ground |


Photographs are the record of the reconnaissance, so take them systematically: at each boring, at each change in cover or ground along each route, and at every obstruction, crossing and utility. One recent reconnaissance produced 333 geotagged photographs along about 5,400 ft of flagged route; each was reviewed afterward for plant species, ground conditions and obstructions and overlaid on parcels, soils, wetlands and flood zones.
| Practice | Reason |
|---|---|
| Geotag every photo, with compass direction | Places the photo on the map; captions can give distance and direction from the nearest boring |
| Expect phone GPS accuracy of about 15 to 30 ft (worse under trees) | State it in the report; do not use photo altitudes |
| Screen for GPS errors: photo pairs implying walking speeds above about 6 ft/s | Remove jumps before measuring route lengths or areas |
| Caption only what the photo shows until field notes are added | Keeps observations separate from conclusions |
| Deliver the photos as a KMZ with clickable icons at each photo location | Clients and drillers can follow the route; a one-page summary plus the KMZ is often what a busy reader wants |
Roadmasters, track inspectors, signal maintainers and yard staff know where the soft spots are, when the ditches flood and which culvert plugs every spring. Ask them three questions: where do you have to keep fixing the track, where does water stand after a storm, and what has changed recently. Record the answers with names and dates in the field notebook; they often become the most useful line in the report.
Report the reconnaissance in a short report or memorandum (Chapter 8.3). A structure that works well is shown below; the detail goes in appendices so the body can be read in a few minutes.
| Section | Content |
|---|---|
| Executive summary | Access, clearing, ground, boring locations, ditches, permits, in a few bullets |
| Site description | Location and land cover; soils and fill; flood zone, wetlands and bedrock; topography from lidar |
| Methods | Dates, who walked it, flagging, photographs, GPS accuracy and how errors were removed |
| Field observations | Access routes, vegetation, slopes and ground, ditches, obstructions |
| Boring locations and field changes | Relocations; locations near property lines, wetlands or utilities |
| Property, access and permits | Owners along each route; approvals needed |
| Estimated quantities | Clearing, trees, obstructions, mats (Chapter 3.6) |
| Conclusions and recommendations | Pathway to adopt, timing, mats, surveys, open items |
| Appendices | Figures, boring summary, route-by-route maps and profiles, species list, photo log |
For ground hazard sites the field worksheet of Chapter 3.8 is completed during the same visit, and its defect and indicator entries carry straight into the risk rating.
| Topic | Refer to |
|---|---|
| Desktop study | Chapter 3.2 |
| Site conditions | Chapter 3.5 |
| Access, clearing and permits | Chapter 3.6 |
| Defect rating and trigger | Sections 3.8.18 and 3.8.19 |
| Field worksheet and instability indicators | Section 3.8.24 |
| Failure mechanisms and triggers | Chapter 3.8 |
| Memorandums | Chapter 8.3 |
The site walk is where the rock structure of a cut is first recorded, and most rock-slope trouble along track can be traced to discontinuities that were there to be seen. Mukherjee's Atlas of Structural Geology is a photographic reference arranged by structure: folds, ductile shear zones, brittle faults, boudins and mullions, veins, and various other structures such as joints, each with field photographs and a note on how to read it. On reconnaissance, its value is recognition. Slickensides on a fault surface show which way it slipped and that it is a weak, polished plane. Folded beds mean the dip changes along the cut. Closely spaced joints next to a shear zone mark a band of broken rock. Boudinaged layers break the rock into blocks that can come loose. Construction Materials and Engineering Materials 1 add the material view: rock, like concrete and masonry, is far weaker in tension and along planes of weakness than intact compression tests suggest.
| Structure | What to measure or note | Why it matters |
|---|---|---|
| Bedding and foliation | Dip and dip direction at several stations; changes along the cut | Planar sliding where it dips out of the face |
| Joint sets | Dip/dip direction, spacing, persistence, aperture, infill, roughness | Wedges where two sets intersect; block size |
| Faults and shear zones | Orientation, width of broken zone, slickensides and slip direction, gouge | Continuous low-strength planes; water paths |
| Folds | Hinge and limb orientations | Dip and failure mode change along the alignment |
| Boudins and veins | Layer and vein orientation, block size | Loose blocks; veins can be strong or weak planes |
| Face | Height, dip and dip direction of each face segment; catchment ditch width | Sets the kinematic test and rockfall reach |
Equation 3.4-1. Kinematic tests (friction angle φ, lateral limit ±20°)
Wedge: line of intersection trends within 90° of the face, φ < plunge < apparent face dip along that trend
Toppling: dip direction opposite the face within 20°, and (90° − dip) + φ < face dip
Apparent dip: tan δa = tan δ · |cos(face dip direction − trend)|
A 70° face dipping toward 090° in rock with φ = 30° and four measured sets: bedding J1 40/100, J2 75/268, J3 60/040 and J4 55/140. The screen finds 1 planar mode (bedding, dipping out of the face at 40°), 3 possible wedges (J1×J3 plunging 40° toward 101°, J1×J4 39° toward 084°, and J3×J4 45° toward 095°) and 1 toppling set (J2, dipping steeply into the face). The J3×J4 intersection was checked by hand at 45.0° toward 094.6°. Every mode the screen flags still needs a stability check with water pressure; modes it rules out generally do not.
Open the rock orientation screen calculator →
Kinematic screening of a rock face for planar sliding, wedge sliding along joint intersections, and toppling, with intersection lines and apparent dips computed and plotted.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads, clients and projects are not named.
Where bedding or foliation dips steeply into a cut, the kinematic screen of Section 3.4.9 flags toppling, and the next question is whether the toe can hold the columns above it. Wyllie and Mah (Chapter 9) present Goodman and Bray's limit equilibrium method for a slope made of rectangular blocks on a stepped base. The analysis works down from the crest. Short blocks near the top are stable. Taller blocks in the middle topple and push on the blocks below. The blocks at the toe are pushed until they slide. The force left at the toe, P0, decides the result: if it is positive the slope is unstable and needs support at the toe. The friction angle that brings P0 to zero gives a factor of safety, and anchors through the toe block are the usual repair. Kliche and the FHWA Rock Slopes manual describe the same failure mode.
Equation 3.4-2. Toppling and sliding forces for block n (Wyllie and Mah Eqs. 9.23 and 9.25)
Pn−1,s = Pn − Wn(cosψp tanφp − sinψp) / (1 − tanφp tanφd)
FS = tanφavailable / tanφrequired (Eq. 9.30)
A block topples when its height-to-width ratio exceeds cot ψp. The larger of the two forces governs, and once sliding governs it does so for every block below. The stepped base angle ψb cannot be measured directly. Wyllie and Mah suggest ψp + 10° to ψp + 30°, and recommend checking that range for the least stable case.
| Force on the face below block | Published | Calculator |
|---|---|---|
| P12 (from block 13) | 292.5 | 292.5 |
| P11 (from block 12) | 825.7 | 825.9 |
| P10 (from block 11) | 1556.0 | 1556.4 |
| P9 (from block 10) | 2826.7 | 2827.6 |
| P8 (from block 9) | 3922.1 | 3923.3 |
| P7 (from block 8) | 4594.8 | 4596.1 |
| P6 (from block 7) | 4837.0 | 4838.2 |
| P5 (from block 6) | 4637.5 | 4638.5 |
| P4 (from block 5) | 3978.1 | 3978.8 |
| P3 (from block 4) | 2825.6 | 2825.7 |
| P2 (from block 3) | 1413.5 | 1413.0 |
| P1 (from block 2) | 472.2 | 471.2 |
| Blocks stable / toppling / sliding | 3 / 10 / 3 | 3 / 10 / 3 |
Published example: a 92.5 m (303.5 ft) face at 56.6°, layers dipping 60° into the face, 10 m (32.8 ft) blocks, a 3.3-ft (1 m) step per block, φ = 38.15° and 159 pcf (25 kN/m³); the block heights and the constants a1 = a2 = 16.4 ft (5 m) are taken from the book's table. With these, the toe force is essentially zero, so the required friction angle is about 38.2°. Wyllie and Mah quote 39° and FS = 0.97, found by raising the friction angle in steps.
The same slope was run with the block heights generated by the calculator from the geometry (16 blocks, block 10 at the crest). The pattern is the same: three stable blocks at the top, ten toppling and three sliding at the toe. The toe force is 2.6 kips/ft, the required friction angle 38.19°, and the factor of safety 1.00. The slope is at limiting equilibrium, so a small loss of friction from weathering or water starts it moving from the toe. A toe anchor force of 0.8 kips/ft just balances the toe block. A design would carry a margin above that and check the anchor against Wyllie and Mah's Equations 9.26 to 9.29.
Open the rock toppling calculator →
Goodman and Bray toppling analysis block by block, from slope geometry or entered block heights: forces, modes, the toe force P0, the friction angle for limiting equilibrium, the factor of safety and the toe anchor force.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.