↑ Parent Menu⌂ Main Menu
← Appendix G ICE Manual Cross-Reference
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · open a dropdown to go to a section or subsection

G.5 Gap-Fill Chapters Added from the Comparison

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.
Author: Daniel P. Colwell
G.5 Gap-Fill Chapters Added from the Comparison

Comparing the two manuals chapter by chapter showed that the GHRM already covered most ICE subjects, often in more railroad-specific depth (track substructure, ballast, risk ratings, desktop study and cost). The ICE Manual covered nine subjects that the GHRM did not treat as chapters. These were written as new GHRM chapters in original wording, English units and railroad context, each with a worked example in the GHRM five-part format, and numbered so that no existing chapter was renumbered.

Table G-11. New GHRM chapters and the ICE chapters they parallel
GHRMTitleParallel ICE chapters
Ch. 2.9Collapsible Soils: Identification, Testing and Railroad ImpactsI-28, I-32, I-29, II-58
Ch. 2.10Non-Engineered Fills: Old Embankments, Waste and Made GroundI-34, II-58, II-70, II-71
Ch. 2.11Soluble Ground and Karst: Sinkholes, Voids and DissolutionI-38, I-40, I-45, II-90
Ch. 2.12Sulfates, Sulfides and Problem MudrocksI-36, I-37, II-99
Ch. 2.13Residual, Tropical and Arid SoilsI-13, I-29, I-30, I-31, I-33
Ch. 3.10Mining and Man-Made HazardsI-40, I-41, I-8, I-43
Ch. 5.4Geo-Environmental Testing on Railroad CorridorsI-48, I-41, I-8
Ch. 5.5The Observational Method and Trigger-Action Response PlansII-100, II-94, II-95, II-96, II-79
Ch. 7.4Earthworks Asset Management and Remedial DesignII-68, II-69, II-70, II-71, II-72, II-87

Subjects the GHRM covers that have no direct ICE chapter include the railroad track substructure, the risk ratings and risk assessment framework, the desktop study and site accessibility study, cost estimates and change orders. These reflect the GHRM's purpose as a railroad ground hazard manual rather than a general geotechnical text.

← Previous · Appendices Appendix F — Analytical Equations