This chapter covers infiltration and seepage for railroad earthworks: rainfall infiltration and wetting fronts, loss of suction in unsaturated soil, steady seepage and seepage forces, internal erosion and filters, pore pressures in slopes, field infiltration testing and drainage design. Water is the most common trigger of railroad ground hazards (Section 3.8.18), so this chapter connects the analysis to the trigger and live ratings of Chapter 3.8.
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
Permeability and capillary rise values for infiltration and seepage analyses. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Coefficient of permeability | Gravel, well graded | GW | 1.0×10⁻¹ | 1.0×10⁰ | 1.0×10¹ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Gravel, poorly graded | GP | 1.0×10⁰ | 1.0×10¹ | 1.0×10² | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Gravel, silty | GM | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Gravel, clayey | GC | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, well graded | SW | 1.0×10⁻³ | 1.0×10⁻² | 1.0×10⁻¹ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, poorly graded | SP | 1.0×10⁻² | 1.0×10⁻¹ | 1.0×10⁰ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, silty | SM | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Sand, clayey | SC | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic silt, low plasticity | ML | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic silt, high plasticity | MH | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic clay, low plasticity | CL | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Inorganic clay, high plasticity | CH | 1.0×10⁻⁸ | 1.0×10⁻⁷ | 1.0×10⁻⁶ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, low plasticity | OL | 1.0×10⁻⁶ | 1.0×10⁻⁵ | 1.0×10⁻⁴ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Organic silt/clay, high plasticity | OH | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Peat | Pt | 1.0×10⁻⁴ | 1.0×10⁻³ | 1.0×10⁻² | cm/s | LOOK T8.4, p.118 | |
| Coefficient of permeability | Uniformly graded coarse aggregate | 4.0×10⁻² | 1.3×10⁻¹ | 4.0×10⁻¹ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Well-graded aggregate without fines | 4.0×10⁻³ | 4.0×10⁻² | 4.0×10⁻¹ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Concrete sand, low dust content | 7.0×10⁻⁴ | 7.0×10⁻³ | 7.0×10⁻² | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Concrete sand, high dust content | 7.0×10⁻⁶ | 7.0×10⁻⁵ | 7.0×10⁻⁴ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Silty and clayey sands | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Compacted silt | 7.0×10⁻⁸ | 7.0×10⁻⁷ | 7.0×10⁻⁶ | cm/s | CB T4.1, p.97 | ||
| Coefficient of permeability | Compacted clay | 1.0×10⁻⁷ | cm/s | CB T4.1, p.97 | ||||
| Capillary rise | Sand | k ≈ 10⁻² cm/s | 0.3 | 0.5 | 0.7 | ft | LOOK T7.20, p.113 | |
| Capillary rise | Silt | k ≈ 10⁻⁴ cm/s | 3.3 | 4.95 | 6.6 | ft | LOOK T7.20, p.113 | |
| Capillary rise | Clay | k ≈ 10⁻⁶ cm/s | 32.8 | 49.2 | 65.6 | ft | LOOK T7.20, p.113 | |
| Hydraulic conductivity | Clean gravel | Saturated | 1.0×10⁰ | 1.0×10¹ | 1.0×10² | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Coarse sand | Saturated | 1.0×10⁻² | 1.0×10⁻¹ | 1.0×10⁰ | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Fine sand | Saturated | 1.0×10⁻³ | 3.2×10⁻³ | 1.0×10⁻² | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Silty clay | Saturated | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Clay | Saturated | 1.0×10⁻⁶ | cm/s | DASP T7.1, p.181 | |||
| Capillary rise | Coarse sand | 0.3 | 0.45 | 0.6 | ft | DASP T9.2, p.262 | ||
| Capillary rise | Fine sand | 1 | 2.5 | 4 | ft | DASP T9.2, p.262 | ||
| Capillary rise | Silt | 2.5 | 13.8 | 25 | ft | DASP T9.2, p.262 | ||
| Capillary rise | Clay | 25 | 50 | 75 | ft | DASP T9.2, p.262 | ||
| Coefficient of permeability for dewatering design | Sandy silt | USACE data | 5.0×10⁻⁴ | 1.0×10⁻³ | 2.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Silty sand | USACE data | 2.0×10⁻³ | 3.2×10⁻³ | 5.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Very fine sand | USACE data | 5.0×10⁻³ | 1.0×10⁻² | 2.0×10⁻² | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Fine sand | USACE data | 2.0×10⁻² | 3.2×10⁻² | 5.0×10⁻² | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Fine to medium sand | USACE data | 5.0×10⁻² | 7.1×10⁻² | 1.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Medium sand | USACE data | 1.0×10⁻¹ | 1.2×10⁻¹ | 1.5×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Medium to coarse sand | USACE data | 1.5×10⁻¹ | 1.7×10⁻¹ | 2.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Coarse sand and gravel | USACE data | 2.0×10⁻¹ | 3.2×10⁻¹ | 5.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability by grain size | Gravel | 1.0×10⁰ | cm/s | ATKINSON T6.2, p.78 | ||||
| Coefficient of permeability by grain size | Sand | 1.0×10⁻³ | 3.2×10⁻² | 1.0×10⁰ | cm/s | ATKINSON T6.2, p.78 | ||
| Coefficient of permeability by grain size | Silt | 1.0×10⁻⁶ | 3.2×10⁻⁵ | 1.0×10⁻³ | cm/s | ATKINSON T6.2, p.78 | ||
| Coefficient of permeability by grain size | Clay | 1.0×10⁻⁶ | cm/s | ATKINSON T6.2, p.78 | ||||
| Typical height of capillary rise | Gravel | 1 | in | LOOK23 T4.1, p.98 | ||||
| Typical height of capillary rise | Coarse sand | 1 | 2.5 | 4 | in | LOOK23 T4.1, p.98 | ||
| Typical height of capillary rise | Medium sand | 4 | 8 | 12 | in | LOOK23 T4.1, p.98 | ||
| Typical height of capillary rise | Fine sand | 12 | 20 | 28 | in | LOOK23 T4.1, p.98 | ||
| Typical height of capillary rise | Silt | 28 | 43.5 | 59 | in | LOOK23 T4.1, p.98 | ||
| Typical height of capillary rise | Clay | 79 | 118 | 157 | in | LOOK23 T4.1, p.98 | ||
| Filter retention (piping) criterion by base soil category | Base soil category 1 | > 85% finer than No. 200 | D15 ≤ 9 × d85 (not less than 0.2 mm) | – | EM1901 D-1, D-2, p.D-4 | |||
| Filter retention (piping) criterion by base soil category | Base soil category 2 | 40–85% finer than No. 200 | D15 ≤ 0.7 mm | – | EM1901 D-1, D-2, p.D-4 | |||
| Filter retention (piping) criterion by base soil category | Base soil category 3 | 15–39% finer than No. 200 | D15 ≤ [(40 − A)/(40 − 15)][(4 × d85) − 0.7 mm] + 0.7 mm (4 × d85 not less than 0.7 mm) | – | EM1901 D-1, D-2, p.D-4 | |||
| Filter retention (piping) criterion by base soil category | Base soil category 4 | < 15% finer than No. 200 | D15 ≤ 4 to 5 × d85 (4 × d85 under riprap or surging drains) | – | EM1901 D-1, D-2, p.D-4 | |||
| Minimum Bligh creep ratio for dams on pervious foundations | Very fine sand or silt | 18 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Fine to medium sand | 15 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Coarse sand | 12 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Fine gravel or sand and gravel | 9 | – | EM1901 T9-10, p.9-62 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Permeability from soil behavior type | Sensitive fine-grained | SBT zone 1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Organic soils – clay | SBT zone 2 | 1.0×10⁻⁸ | 1.0×10⁻⁷ | 1.0×10⁻⁶ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Clays – silty clay to clay | SBT zone 3 | 1.0×10⁻⁸ | 3.2×10⁻⁸ | 1.0×10⁻⁷ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Silt mixtures – clayey silt to silty clay | SBT zone 4 | 3.0×10⁻⁷ | 1.7×10⁻⁶ | 1.0×10⁻⁵ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Sand mixtures – silty sand to sandy silt | SBT zone 5 | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Sands – clean sand to silty sand | SBT zone 6 | 1.0×10⁻³ | 1.0×10⁻² | 1.0×10⁻¹ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Dense sand to gravelly sand | SBT zone 7 | 1.0×10⁻¹ | 3.2×10⁰ | 1.0×10² | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Very stiff sand to clayey sand (OC or cemented) | SBT zone 8 | 1.0×10⁻⁶ | 3.2×10⁻⁴ | 1.0×10⁻¹ | cm/s | ROB T6, p.56 | |
| Permeability from soil behavior type | Very stiff fine-grained (OC or cemented) | SBT zone 9 | 1.0×10⁻⁷ | 1.0×10⁻⁶ | 1.0×10⁻⁵ | cm/s | ROB T6, p.56 | |
| Permeability anisotropy kh/kv | Soft clay – No or slightly developed macrofabric, essentially homogeneous | CL-CH | 1 | 1.25 | 1.5 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Fairly to well-developed macrofabric (discontinuous permeable lenses) | CL-CH | 2 | 3 | 4 | – | ROB T7, p.57 | |
| Permeability anisotropy kh/kv | Soft clay – Varved clays and deposits with continuous permeable layers | CL-CH | 3 | 9 | 15 | – | ROB T7, p.57 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Rational method runoff coefficient | Business – downtown | ASCE (1960) | 0.7 | 0.825 | 0.95 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Business – neighborhood | ASCE (1960) | 0.5 | 0.6 | 0.7 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Residential – single-family | ASCE (1960) | 0.3 | 0.4 | 0.5 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Residential – suburban | ASCE (1960) | 0.25 | 0.325 | 0.4 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Industrial – light | ASCE (1960) | 0.5 | 0.65 | 0.8 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Industrial – heavy | ASCE (1960) | 0.6 | 0.75 | 0.9 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Railroad yard areas | ASCE (1960) | 0.2 | 0.3 | 0.4 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Parks, cemeteries | ASCE (1960) | 0.1 | 0.175 | 0.25 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Unimproved areas | ASCE (1960) | 0.1 | 0.2 | 0.3 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, sandy soil, flat < 2% | ASCE (1960) | 0.05 | 0.075 | 0.1 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, sandy soil, 2–7% | ASCE (1960) | 0.1 | 0.125 | 0.15 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, sandy soil, steep > 7% | ASCE (1960) | 0.15 | 0.175 | 0.2 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, heavy soil, flat < 2% | ASCE (1960) | 0.13 | 0.15 | 0.17 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, heavy soil, 2–7% | ASCE (1960) | 0.18 | 0.2 | 0.22 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Lawn, heavy soil, steep > 7% | ASCE (1960) | 0.25 | 0.3 | 0.35 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Asphalt pavement | ASCE (1960) | 0.7 | 0.825 | 0.95 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Concrete pavement | ASCE (1960) | 0.8 | 0.875 | 0.95 | – | HDS2 T5.7, p.5-33 | |
| Rational method runoff coefficient | Roofs | ASCE (1960) | 0.75 | 0.85 | 0.95 | – | HDS2 T5.7, p.5-33 | |
| Highway design storm return period | Rural principal arterial | AASHTO (1999) | 50 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural minor arterial | AASHTO (1999) | 25 | 37.5 | 50 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Rural major collector | AASHTO (1999) | 25 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural minor collector | AASHTO (1999) | 10 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural local road | AASHTO (1999) | 5 | 7.5 | 10 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Urban principal arterial | AASHTO (1999) | 25 | 37.5 | 50 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Urban minor arterial | AASHTO (1999) | 25 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Urban collector | AASHTO (1999) | 10 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Urban local street | AASHTO (1999) | 5 | 7.5 | 10 | yr | HDS2 T1.1, p.1-5 | |
| Risk the design flood is equaled or exceeded during service life | 2-year design flood | Service life 1 yr | 50 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 5-year design flood | Service life 1 yr | 20 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 10-year design flood | Service life 1 yr | 10 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 1 yr | 4 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 1 yr | 2 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 1 yr | 1 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 2-year design flood | Service life 5 yr | 96.9 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 5-year design flood | Service life 5 yr | 67.2 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 10-year design flood | Service life 5 yr | 41 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 5 yr | 18.5 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 5 yr | 9.6 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 5 yr | 4.9 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 2-year design flood | Service life 10 yr | 99.9 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 5-year design flood | Service life 10 yr | 89.3 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 10-year design flood | Service life 10 yr | 65.1 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 10 yr | 33.5 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 10 yr | 18.3 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 10 yr | 9.6 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 5-year design flood | Service life 20 yr | 98.8 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 10-year design flood | Service life 20 yr | 87.8 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 20 yr | 55.8 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 20 yr | 33.2 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 20 yr | 18.2 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 10-year design flood | Service life 50 yr | 99.5 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 50 yr | 87 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 50 yr | 63.6 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 50 yr | 39.5 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 25-year design flood | Service life 100 yr | 98.3 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 50-year design flood | Service life 100 yr | 86.7 | % | HDS2 T4.25, p.4-90 | |||
| Risk the design flood is equaled or exceeded during service life | 100-year design flood | Service life 100 yr | 63.4 | % | HDS2 T4.25, p.4-90 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Minimum weighted creep ratio against piping (Lane) | Very fine sand or silt | Granular foundation under a structure or excavation | 8.5 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Fine sand | Granular foundation under a structure or excavation | 7 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Medium sand | Granular foundation under a structure or excavation | 6 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Coarse sand | Granular foundation under a structure or excavation | 5 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Fine gravel | Granular foundation under a structure or excavation | 4 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Medium gravel | Granular foundation under a structure or excavation | 3.5 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Coarse gravel with cobbles | Granular foundation under a structure or excavation | 3 | – | UFC T4-3, p.4-40 | |||
| Minimum weighted creep ratio against piping (Lane) | Boulders with some cobbles and gravel | Granular foundation under a structure or excavation | 2.5 | – | UFC T4-3, p.4-40 | |||
| Coefficient of permeability for dewatering design | Sandy silt | USACE data | 5.0×10⁻⁴ | 1.0×10⁻³ | 2.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Silty sand | USACE data | 2.0×10⁻³ | 3.2×10⁻³ | 5.0×10⁻³ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Very fine sand | USACE data | 5.0×10⁻³ | 1.0×10⁻² | 2.0×10⁻² | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Fine sand | USACE data | 2.0×10⁻² | 3.2×10⁻² | 5.0×10⁻² | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Fine to medium sand | USACE data | 5.0×10⁻² | 7.1×10⁻² | 1.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Medium sand | USACE data | 1.0×10⁻¹ | 1.2×10⁻¹ | 1.5×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Medium to coarse sand | USACE data | 1.5×10⁻¹ | 1.7×10⁻¹ | 2.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Coefficient of permeability for dewatering design | Coarse sand and gravel | USACE data | 2.0×10⁻¹ | 3.2×10⁻¹ | 5.0×10⁻¹ | cm/s | UFC T3-4, p.3-6 | |
| Minimum Bligh creep ratio for dams on pervious foundations | Very fine sand or silt | 18 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Fine to medium sand | 15 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Coarse sand | 12 | – | EM1901 T9-10, p.9-62 | ||||
| Minimum Bligh creep ratio for dams on pervious foundations | Fine gravel or sand and gravel | 9 | – | EM1901 T9-10, p.9-62 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Hydraulic conductivity | Clean gravel | Saturated | 1.0×10⁰ | 1.0×10¹ | 1.0×10² | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Coarse sand | Saturated | 1.0×10⁻² | 1.0×10⁻¹ | 1.0×10⁰ | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Fine sand | Saturated | 1.0×10⁻³ | 3.2×10⁻³ | 1.0×10⁻² | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Silty clay | Saturated | 1.0×10⁻⁵ | 1.0×10⁻⁴ | 1.0×10⁻³ | cm/s | DASP T7.1, p.181 | |
| Hydraulic conductivity | Clay | Saturated | 1.0×10⁻⁶ | cm/s | DASP T7.1, p.181 | |||
| Ballast hydraulic conductivity by fouling category | Ballast – Clean | Parsons (1990) | 2.5×10⁰ | 3.6×10⁰ | 5.1×10⁰ | cm/s | LI16 T6.2, p.279 | |
| Ballast hydraulic conductivity by fouling category | Ballast – Moderately clean | Parsons (1990) | 2.5×10⁻¹ | 7.9×10⁻¹ | 2.5×10⁰ | cm/s | LI16 T6.2, p.279 | |
| Ballast hydraulic conductivity by fouling category | Ballast – Moderately fouled | Parsons (1990) | 1.5×10⁻¹ | 1.9×10⁻¹ | 2.5×10⁻¹ | cm/s | LI16 T6.2, p.279 | |
| Ballast hydraulic conductivity by fouling category | Ballast – Fouled | Parsons (1990) | 5.0×10⁻⁴ | 8.7×10⁻³ | 1.5×10⁻¹ | cm/s | LI16 T6.2, p.279 | |
| Ballast hydraulic conductivity by fouling category | Ballast – Highly fouled | Parsons (1990) | 5.0×10⁻⁴ | cm/s | LI16 T6.2, p.279 | |||
| Permeability of fouled ballast | Ballast fouled with coal dust | Fouling ratio 10% | 4.9×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with crushed ballast fines | Fouling ratio 20% | 2.3×10⁰ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with clay | Fouling ratio 20% | 6.3×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with coal dust | Fouling ratio 20% | 1.1×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with crushed ballast fines | Fouling ratio 30% | 1.1×10⁰ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with clay | Fouling ratio 30% | 1.8×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with coal dust | Fouling ratio 30% | 9.6×10⁻² | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with crushed ballast fines | Fouling ratio 40% | 3.8×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with clay | Fouling ratio 40% | 8.1×10⁻² | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with coal dust | Fouling ratio 40% | 8.7×10⁻² | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with crushed ballast fines | Fouling ratio 50% | 1.7×10⁻¹ | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with clay | Fouling ratio 50% | 6.1×10⁻² | cm/s | MATC T5.1.1, p.48 | |||
| Permeability of fouled ballast | Ballast fouled with coal dust | Fouling ratio 50% | 5.4×10⁻² | cm/s | MATC T5.1.1, p.48 | |||
| Design storm for under-track culverts | Class I railroad under-track culverts | 100 | yr | RRCULV text, p.1 | ||||
| Design storm return period | Track internal drainage | Railroad drainage | 1 | 1.5 | 2 | yr | LI16 T6.3, p.282 | |
| Design storm return period | Surface ditch | Railroad drainage | 5 | 7.5 | 10 | yr | LI16 T6.3, p.282 | |
| Design storm return period | Culverts | Railroad drainage | 50 | 75 | 100 | yr | LI16 T6.3, p.282 | |
| Design storm return period | Bridges | Railroad drainage | 100 | yr | LI16 T6.3, p.282 | |||
| Highway design storm return period | Rural principal arterial | AASHTO (1999) | 50 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural minor arterial | AASHTO (1999) | 25 | 37.5 | 50 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Rural major collector | AASHTO (1999) | 25 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural minor collector | AASHTO (1999) | 10 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Rural local road | AASHTO (1999) | 5 | 7.5 | 10 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Urban principal arterial | AASHTO (1999) | 25 | 37.5 | 50 | yr | HDS2 T1.1, p.1-5 | |
| Highway design storm return period | Urban minor arterial | AASHTO (1999) | 25 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Urban collector | AASHTO (1999) | 10 | yr | HDS2 T1.1, p.1-5 | |||
| Highway design storm return period | Urban local street | AASHTO (1999) | 5 | 7.5 | 10 | yr | HDS2 T1.1, p.1-5 | |
| Hydraulic conductivity of compacted soil | Well graded clean gravels | GW | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁴ | 3.0×10⁻³ | 3.0×10⁻² | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Poorly graded clean gravels | GP | UFC 3-220-20 Table 3-1 | 3.0×10⁻³ | 3.0×10⁻² | 3.0×10⁻¹ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty gravels | GM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey gravels | GC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Well graded clean sands | SW | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁴ | 3.0×10⁻³ | 3.0×10⁻² | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Poorly graded clean sands | SP | UFC 3-220-20 Table 3-1 | 3.0×10⁻³ | 3.0×10⁻² | 3.0×10⁻¹ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silty sands | SM | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁶ | 3.0×10⁻⁵ | 3.0×10⁻⁴ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Sand-silt-clay, slightly plastic fines | SM-SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Clayey sands | SC | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁷ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Inorganic silts and clayey silts | ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | 3.0×10⁻⁷ | 3.0×10⁻⁶ | cm/s | UFC322020 T3-1, p.120 |
| Hydraulic conductivity of compacted soil | Silt-clay mixture | CL-ML | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Lean clay | CL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Organic silts, low plasticity | OL | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁸ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Elastic silts | MH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Fat clay | CH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of compacted soil | Organic clays | OH | UFC 3-220-20 Table 3-1 | 3.0×10⁻⁹ | cm/s | UFC322020 T3-1, p.120 | ||
| Hydraulic conductivity of fouled ballast – crushed-ballast fines | Ballast fouled with crushed ballast fines | 20% fouling | 2.3×10⁰ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – clay fines | Ballast fouled with clay | 20% fouling | 6.3×10⁻¹ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – crushed-ballast fines | Ballast fouled with crushed ballast fines | 30% fouling | 1.1×10⁰ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – clay fines | Ballast fouled with clay | 30% fouling | 1.8×10⁻¹ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – crushed-ballast fines | Ballast fouled with crushed ballast fines | 40% fouling | 3.8×10⁻¹ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – clay fines | Ballast fouled with clay | 40% fouling | 8.1×10⁻² | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – crushed-ballast fines | Ballast fouled with crushed ballast fines | 50% fouling | 1.7×10⁻¹ | cm/s | PARSONS15 T5.1, p.33 | |||
| Hydraulic conductivity of fouled ballast – clay fines | Ballast fouled with clay | 50% fouling | 6.1×10⁻² | cm/s | PARSONS15 T5.1, p.33 |
| Estimate | Correlation | Limits / notes | Source |
|---|---|---|---|
| Hazen formula | k (cm/s) ≈ C · D10² (mm), C ≈ 1.0–1.5 | Clean sands; Hazen (1911): C1 = 0.01–0.015 with k in m/s | CB Eq. 4.5, p.97 |
| Rational method peak flow | Q = C i A (Q in cfs, i in in./hr, A in acres) | C from the database (railroad yards 0.20–0.40); small basins only (< 500 acres) | HDS2 5.7, p.5-33 |
| Risk of exceedance during service life | R = 1 − (1 − 1/Tr)^n | Tr = return period (yr), n = service life (yr) | HDS2 Eq. 4.81, p.4-90 |
| Hazen permeability estimate | k (cm/s) = C · D10², C ≈ 100 (40–150), D10 in cm | Clean, uniform sand only; confirm with pumping tests | UFC Eq. 3-2, p.3-6 |
| Weighted creep ratio against piping (Lane) | Cw = (ΣLv + ΣLh/3) / Δh ≥ tabulated minimum (2.5 boulders … 8.5 very fine sand or silt) | Lv, Lh = vertical and horizontal seepage path lengths; Δh = head difference | UFC 4-3, p.4-40 |
| Stream stability rating | R = Σ (wi × ri) over 13 indicators | Excellent < 32, good 32–55, fair 55–78, poor > 78 | HEC20 D.2–D.3, p.D.6 |
| Gumbel (EV1) flood quantile, method of moments | xT = x̄ + KT s; KT = −0.45 − 0.7797 ln[−ln(1 − 1/T)] | x̄, s = mean and standard deviation of annual maxima; α = 0.7797 s, β = x̄ − 0.45005 s | RAOHAMED Eq. 8.2.5–8.2.20, §7.2 |
| Filter permeability and pipe criteria | D15(filter)/d15(base) ≥ 3 to 5; D50(filter)/hole or slot width ≥ 1.0 | Retention criterion by base soil category in Table D-2; no gap-graded filters | EM1901 Eq. D-1, D-2, p.D-5–D-6 |
| Permeability from Ic | k = 10^(0.952 − 3.04 Ic) m/s for 1.0 < Ic ≤ 3.27; k = 10^(−4.52 − 1.37 Ic) m/s for 3.27 < Ic < 4.0 (× 100 for cm/s) | Approximate guide only | ROB 6, p.56 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Most railroad fills and cuts that fail do so during or after wet weather: water ponds against a fill above a plugged culvert, a wetting front advances into a dry clay slope and destroys its suction, or seepage at the toe carries fines out of the embankment. Analysis therefore has to answer three questions: how fast does water get in, where does it go, and what does it do to the forces that hold the ground in place.
| Problem | Mechanism | Section |
|---|---|---|
| Rain on a dry or partly saturated slope | Wetting front; loss of suction; perched water | 6.4.1 and 6.4.2 |
| Water ponded against a fill | Steady seepage through the fill; seepage force at the toe | 6.4.3 |
| Fines leaving the toe or a culvert joint | Internal erosion and piping | 6.4.4 |
| River or reservoir drawdown | Rapid drawdown pore pressure | 6.4.5 |
| Infiltration systems and drainage | Field permeability; drain capacity | 6.4.6 and 6.4.7 |
Rain that reaches the ground either infiltrates or runs off. While the rainfall rate is below the soil's infiltration capacity, all of it enters; once it exceeds it, the excess runs off or ponds. Infiltration capacity falls with time as the near-surface soil saturates, toward a long-term rate close to the saturated hydraulic conductivity. The water moves down as a wetting front: above the front the soil is near saturation, below it the soil keeps its original moisture.
Equation 6.4-1. Green-Ampt infiltration rate
where f is the infiltration rate, Ks the saturated hydraulic conductivity, ψf the suction at the wetting front, Δθ the change in volumetric water content, and F the cumulative infiltration depth.
Two consequences matter on the railroad. First, a long, moderate rain does more damage to a clay slope than a short, intense one, because more of it gets in; antecedent rainfall is therefore part of the trigger (Section 3.8.12). Second, a wetting front reaching a less permeable layer (a clay core, rock, an old frozen zone) builds perched water above it, often along exactly the surface where the slope fails.
Above the water table, fine-grained soils hold water under suction (negative pore pressure). Suction adds apparent cohesion and is why steep cuts in dry silt and clay stand for years. Wetting removes it. A slope that is stable in a dry season can fail after rain with no rise in the water table at all, simply because the suction it depended on has gone.
Equation 6.4-2. Shear strength of unsaturated soil (extended Mohr-Coulomb)
where (ua − uw) is matric suction and φb the angle describing the strength gained from suction.
Where water stands against a fill for long enough (a blocked culvert, a pond, a river stage that lasts days), flow through the fill approaches steady state. Darcy's law governs the flow, and a flow net (or a seepage model) gives the head everywhere in the fill, the exit gradient at the toe and the quantity of seepage.
Equation 6.4-3. Darcy's law and seepage quantity
where k is hydraulic conductivity, i the hydraulic gradient, A the area, H the head difference, and Nf, Nd the numbers of flow channels and equipotential drops in the flow net.
Seepage exerts a force on the soil skeleton equal to the gradient times the unit weight of water, acting in the direction of flow. At the downstream toe the flow turns upward and outward, which is why the toe softens, sloughs and is the first place to show distress. For dam and levee-type fills the Kozeny parabola gives a quick phreatic line through a homogeneous section.

When the upward exit gradient at the toe approaches the critical gradient, the effective stress in the soil goes to zero and particles can be carried out. Once a pipe starts it concentrates flow and grows backward toward the water. Culvert joints that have separated, animal burrows and old timber structures in a fill give water the same short cut.
Equation 6.4-4. Critical hydraulic gradient
| Requirement | Criterion | Purpose |
|---|---|---|
| Retention | D15 filter / D85 soil ≤ 4 to 5 | Keep soil particles from passing through the filter |
| Permeability | D15 filter / D15 soil ≥ 4 to 5 | Filter much more permeable than the soil |
| Uniformity and segregation | Well-graded filter, placed without segregation | Consistent performance |
| Geotextiles | Apparent opening size and permittivity chosen for the soil | Where granular filters are impractical |

Slope stability analysis (Chapter 6.3) needs the pore pressure on the slip surface. Three ways of describing it are in common use: a phreatic surface (from readings or a seepage model), a pore pressure ratio ru = u / (γz), and a full seepage analysis. Railroad cases that need particular care are listed below.
| Case | Approach |
|---|---|
| Perched water on a clay or rock contact after rain | Phreatic surface on the contact; check with the suction removed |
| Water ponded against a fill (blocked culvert) | Steady seepage at the ponded level; this is the trigger condition for drainage-driven sites |
| Rapid drawdown after a flood | Drawdown analysis; low-permeability fill keeps its high pore pressure while the support of the water outside is removed |
| Artesian pressure under a clay toe | Piezometers; uplift on the base of the clay |
| Live conditions | The live rating (Section 3.8.26) raises the frequency index when rainfall or stage passes the site's threshold |
Drainage is usually the cheapest and most effective way to reduce the frequency of failure, because it acts directly on the trigger (Table 3.8-79). It only works while it is maintained.
| Measure | Acts on | Design notes |
|---|---|---|
| Ditch cleaning and regrading | Ponding at the toe; water in the ballast | Positive grade to an outlet; invert below the subgrade |
| Culvert cleaning, upsizing or replacement | Ponding against the fill | Capacity for the design storm (the 100-year event earns the most credit, Table 3.8-81); outlet protection |
| Subdrains and underdrains | Water in the subgrade and toe | Filter-compatible aggregate or geotextile; cleanouts |
| Toe drains and drainage blankets | Seepage exit at the toe | Filter criteria (Table 6.4-2) |
| Horizontal drains | Groundwater in the slope | Spacing from seepage analysis; monitor outflow |
| Surface sealing and diversion | Infiltration at the crest | Divert crest runoff away from cracks |
Where a design depends on water going into the ground (an infiltration basin, a storm chamber system), measure it. The borehole (single-ring) test below follows a municipal stormwater ordinance procedure that is widely used in the Midwest.
| Step | Requirement |
|---|---|
| Soil boring | Extend at least 5 ft below groundwater; bag samples of each layer between the system bottom and the water table for sieve analysis; density and moisture of each layer; water at drilling and 24 hours; log by USDA texture |
| Test location | At least 5 ft from the boring, or a horizontal distance equal to the depth from test bottom to water table, whichever is greater |
| Setup | Drill to the test depth; push a PVC pipe 3 in. below the bottom; bentonite seal in the annulus; clean, uniform bottom; cap the pipe |
| Pre-soak | Fill the pipe and let it drain to saturate the soil; record the volume added |
| Readings | Record time and depth at intervals that give about 3 in. or less of decline; when within 12 in. of the bottom, refill to 24 in. above the bottom |
| End | Repeat until the rate of decline is constant, then two more cycles |
| Timing | Some agencies do not allow testing within 24 hours after rain |
The ordinance equations assume the wetting front stays above the water table; where it reaches the water table, the equations must be modified, as the worksheet does. Check the field value against grain-size correlations from the sieve analyses; where the correlation gives a higher permeability, the field value is the conservative one to use.
Do not test infiltration where groundwater is within a few feet of the surface; the result is meaningless and the site is not suited to infiltration. One recent client request banned infiltration tests outright for that reason.
| Topic | Refer to |
|---|---|
| Groundwater characterization | Chapter 2.8 |
| Rainfall thresholds and triggers | Sections 3.8.11 and 3.8.12; Section 3.8.18 |
| Slope stability | Chapter 6.3 |
| Live rating | Section 3.8.26 |
| Design credit for drainage | Table 3.8-81 |
| Ground improvement and retaining structures | Chapters 7.1 and 7.2 |
The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 10 tools (3 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).
Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).
| Groundwater & Seepage | |||
|---|---|---|---|
| GW | Falling Head Tube CalibrationsUsed in Chapter 2.8, 2.8.4 Field Permeability Testing | guide only | Guide |
| GW | Flexible Wall PermeabilityUsed in Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit Outputs | guide only | Guide |
| GW | Infiltration Calculations & ProcedureUsed in Chapter 3.8, 3.8.12 Rainfall Thresholds and Weather-Based Operating Protocols; Chapter 2.8, 2.8.4 Field Permeability Testing | Calculator ▸ | Guide |
| GW | Seepage Through Dam (Kozeny)Used in Chapter 2.8, 2.8.5 Seepage Analysis | guide only | Guide |
| GW | Slug Test — Bouwer–RiceUsed in Chapter 2.8, 2.8.4 Field Permeability Testing | guide only | Guide |
| GW | Slug Test — HvorslevUsed in Chapter 2.8, 2.8.4 Field Permeability Testing | guide only | Guide |
| GW | UnderseepageUsed in Chapter 3.8, 3.8.4 Hydraulic Failure Mechanisms; Chapter 2.8, Applies to the chapter as a whole | guide only | Guide |
| GW | Well Construction Summary (BRLF)Used in Chapter 2.8, 2.8.3 Piezometers — Types, Installation, and Monitoring | guide only | Guide |
| Pavements, Subgrade & Frost | |||
| PV | Culvert TableoldUsed in Chapter 2.1, 2.1.5 Drainage Elements | Calculator ▸ | Guide |
| PV | HDPE Pipe DesignUsed in Chapter 2.1, 2.1.9 Utility and Pipeline Crossings | Calculator ▸ | Guide |
Calculator: Ballast Fouling and Drainage (Section 6.4.10)
Calculator: Rainfall, Suction and Shallow Slides (Section 6.4.11)
Fouled ballast is the most common reason a track section stops draining. The fines come mostly from ballast breakdown, with contributions from infiltration from the surface (coal, ore, wind-blown soil), the subballast and the subgrade (pumping). Coarse broken particles do little harm and may even stiffen the ballast, but as fines accumulate they hold water, the voids clog, and geometry deteriorates fastest where fouled ballast and poor drainage occur together.
Equation 6.4-5. Fouling indices
P = percent passing the sieve (sizes in mm; No. 4 and No. 200 in FI).
Equation 6.4-6. Void contaminant index and fouled conductivity
e = void ratio, Gs = specific gravity, M = dry mass; b = fresh ballast, f = fouling material.
| Category | FI | Passing 3/4 in. (one railroad's single-sieve criterion) |
|---|---|---|
| Clean | < 1 | – |
| Moderately clean | 1 to < 10 | < 25% |
| Moderately fouled | 10 to < 20 | 25 to 40% |
| Fouled | 20 to < 40 | 40 to 50% |
| Highly fouled | ≥ 40 | > 50% |
Intervention levels: FI 30 (drainage reduction) and 40 (highly fouled); four-sieve index 80; 40% passing 3/4 in.; European agencies use 30% passing 14 mm or 22.4 mm.
| kb/k | Drainage |
|---|---|
| ≤ 3 | Free |
| 3 to 30 | Very good |
| 30 to 300 | Good |
| 300 to 3,000 | Acceptable |
| 3,000 to 300,000 | Poor |
| 300,000 to 30,000,000 | Very poor |
| > 30,000,000 | Relatively impervious |
The fouling index counts the fines twice because they control permeability, but sieving to the No. 200 in the field is impractical, so single-sieve criteria are used for field decisions. Mass-based indices also ignore the type of fines. The VCI measures the share of the ballast voids actually filled, and it is the only one of these measures that accounts for the low specific gravity of coal. At the same 15% fouling by mass, laboratory tests gave about 78% VCI for coal, 65% for clay and 52% for sand, while FI barely separated coal from sand. Above about 40% VCI, geogrid reinforcement adds little and ballast strength falls noticeably.
| Result | Value |
|---|---|
| Fouling index | 16.0 (moderately fouled) |
| Four-sieve index | 20.3 |
| Void contaminant index | 21.0 % |
| Drainage, silty or coal fines (kf = 2.8 ft/day) | Poor drainage (kb/k = 8,547) |
| Drainage, clay fines (kf = 0.03 ft/day) | Very poor drainage |
None of the mass-based indices calls for cleaning, yet with clay fines filling a fifth of the voids the ballast drains very poorly. Where wet spots persist, test the fines (Atterberg limits, specific gravity) before deciding between shoulder cleaning, undercutting and subgrade work.
Open the ballast fouling calculator →
Fouling index, four-sieve index, single-sieve category, void contaminant index, fouled conductivity and drainage class.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.
Many cut and fill slopes along track stand steeper than their friction angle for years and then slide in a wet season. The extra strength comes from matric suction in the soil above the water table, and steady infiltration takes it away. Lu and Likos's Unsaturated Soil Mechanics gives closed-form tools for this. Their Chapter 7 derives the steady suction profile above the water table for a given infiltration or evaporation rate, using Gardner's exponential conductivity function. Their Section 8.2 takes the effective degree of saturation from the van Genuchten water retention curve as Bishop's effective stress parameter χ. Suction then adds a stress Se(ua − uw) to the normal stress on a potential slip plane. Dropping that into the infinite slope equation shows how a slope that is safe in dry weather can fail under steady rain without the water table ever reaching the slip surface.
Equation 6.4-7. Steady suction profile, effective saturation and factor of safety
Se = [1 + (αψ)n]−(1 − 1/n); suction stress = Seγwψ
F = [c′ + (γd cos²β + Seγwψ) tanφ′] / (γd sinβ cosβ); d = slip depth
| Soil | n | α (1/kPa) | α (1/ft of head) | ks (m/s) |
|---|---|---|---|---|
| Sand | 4 to 8.5 | 0.1 to 0.5 | 0.3 to 1.5 | 10−2 to 10−5 |
| Silt | 2 to 4 | 0.01 to 0.1 | 0.03 to 0.3 | 10−6 to 10−9 |
| Clay | 1.1 to 2.5 | 0.001 to 0.01 | 0.003 to 0.03 | 10−8 to 10−13 |
α in 1/ft of suction head = α in 1/kPa × 2.99. Lu and Likos's representative infiltration rate is about 2.7 mm/day (0.11 in./day) and evaporation 1 mm/day.
With no flow the suction equals the height above the water table, which is the hydrostatic case. The solution also has a physical limit: steady infiltration cannot exceed ks, and when it reaches ks the suction falls to zero throughout. As a check, Lu and Likos's representative clay (ks = 0.014 ft/day, or 5 × 10−8 m/s; α = 0.015 per ft of suction head, or 0.005 kPa−1) under their highest infiltration rate gives about 650 psf (31 kPa) of suction 33 ft (10 m) above the water table, against 2,050 psf (98 kPa) with no flow. That is a change of roughly 1,360 psf (65 kPa), consistent with the “about 60 kPa” (1,250 psf) they describe for that case.
A 1.5H:1V (33.7°) silt slope with φ′ = 32°, no cohesion and the water table 15 ft down is checked at a slip depth of 4 ft. Without suction its factor of safety would be 0.94, so it should not stand. With no flow, suction raises it to 2.88. Steady infiltration of 0.1 in./day lowers that to 2.27, and 0.25 in./day to 1.39. Once infiltration matches the silt's conductivity, the slope is back to 0.94 and fails. Drainage cannot help here because there is no water table at the slip depth. What helps is limiting infiltration (ditches above the crest, sealing cracks, vegetation) or flattening the slope.
Open the rainfall and suction calculator →
Steady suction and effective saturation profiles above the water table for a given infiltration or evaporation rate, and the infinite-slope factor of safety with depth, with and without suction.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.
Section 6.4.11 treats suction above a water table under steady infiltration. Old clay embankments add a seasonal cycle: in summer, vegetation dries the fill and suctions develop; in winter the fill wets up and pore pressure can become positive at depth. Monitoring and modelling of UK railway embankments show that pore pressure in these fills is seldom hydrostatic below a thin near-surface layer, and that the steady-state, saturated assumption usually made in embankment assessments is unreliable (O'Brien, 2013, pp. 19, 29–30).
| Zone and test | k (m/s) | k (ft/day) |
|---|---|---|
| Clay fill below about 6.5 ft (2 m), variable-head borehole tests | 2 × 10−9 to 5 × 10−8 | 0.0006 to 0.014 |
| Fill affected by silt and sand lenses | 10−7 to 5 × 10−6 | 0.03 to 1.4 |
| Slope surface, Guelph permeameter (near field saturation) | 10−6 to 10−5 | 0.3 to 2.8 |
O'Brien (2013), Fig. 11 and p. 25. The borehole values are one to two orders of magnitude higher than for intact stiff fissured clay because of the clod–matrix fabric.
Three zones control the pore pressure: the near-surface fill, which is cracked and more permeable; the main body of clay fill; and the foundation soil. Modelling gave a critical intermediate range of fill permeability of about 5 × 10−8 to 5 × 10−7 m/s (0.014 to 0.14 ft/day): in that range most daily winter rainfall infiltrates and pore pressure rises quickly, so a run of moderately wet days can produce a higher winter pore pressure than one storm. Fill of about 10−9 m/s (0.0003 ft/day) or less responded too slowly to be at risk (O'Brien, 2013, pp. 25, 27). Small, steep embankments developed lower pore pressures than larger, flatter ones in the same models.
Equation 6.4-8. Relative hydraulic conductivity (Mualem–van Genuchten)
van Genuchten (1980). The UK embankment models fitted van Genuchten parameters to a modified Croney water retention curve with a lower air-entry value, to represent the clod–matrix fill (O'Brien, 2013, Appendix).
Equation 6.4-9. Shear strength of unsaturated soil (extended Mohr–Coulomb)
Fredlund, Morgenstern and Widger (1978). φb is the friction angle for suction; the Bishop form used in Section 6.4.11 is the special case tanφb = Se tanφ′.
Two cautions from the same work. Conductivity is lower on wetting than on drying at the same suction (hysteresis), which changes how fast a slope wets up; and reliable field values of unsaturated permeability for dumped fills are scarce, so modelled pore pressures are a guide to patterns, not predictions.
Open the rainfall and suction calculator →
Steady suction profile, effective saturation and infinite-slope factor of safety with depth, now with an optional root cohesion zone.
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.