Primary References: Terzaghi and Peck (1967); Peck, Hanson and Thornburn (1974); Kulhawy and Mayne (1990), EPRI EL-6800; NAVFAC DM-7.01 (1986); Bowles (1996); Holtz, Kovacs and Sheahan (2011); Skempton (1986); Stroud (1974); Wroth and Wood (1978); ASTM D1586, D2216, D2487, D4318.
Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database
The full database extends this appendix with values and ranges from the library references. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Undrained shear strength | Clay | CL-CH | Very soft | 251 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 251 | 386.5 | 522 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Firm | 522 | 783 | 1,044 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,044 | 1,566 | 2,088 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 2,088 | 3,132 | 4,177 | psf | LOOK T2.14 / 5.3, p.50 |
| Undrained shear strength | Clay | CL-CH | Hard | 4,177 | psf | LOOK T2.14 / 5.3, p.50 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Very soft (N < 2) | 0.25 | tsf | IDOT T4.4.6.1.2-2, p.119 | ||
| Unconfined compressive strength | Cohesive soil | CL-CH | Soft (N = 2–4) | 0.25 | 0.375 | 0.5 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Medium stiff (N = 4–8) | 0.5 | 0.75 | 1 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Stiff (N = 8–15) | 1 | 1.5 | 2 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Very stiff (N = 15–30) | 2 | 3 | 4 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| Unconfined compressive strength | Cohesive soil | CL-CH | Hard (N > 30) | 4 | 6 | 8 | tsf | IDOT T4.4.6.1.2-2, p.119 |
| SPT N-value | Cohesive soil | CL-CH | Very soft | 0 | 0.5 | 1 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Soft | 2 | 3 | 4 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Medium stiff | 5 | 6.5 | 8 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Stiff | 9 | 12 | 15 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very stiff | 16 | 23 | 30 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Hard | 31 | 45.5 | 60 | blows/ft | GEC5 T23, p.137 |
| SPT N-value | Cohesive soil | CL-CH | Very hard | 60 | blows/ft | GEC5 T23, p.137 | ||
| SPT N-value | Granular soil | GW-SM | Very loose | 4 | blows/ft | LOOK T2.15, p.50 | ||
| Relative density | Granular soil | GW-SM | Very loose | 15 | % | LOOK T2.15, p.50 | ||
| SPT N-value | Granular soil | GW-SM | Loose | 4 | 7 | 10 | blows/ft | LOOK T2.15, p.50 |
| Relative density | Granular soil | GW-SM | Loose | 15 | 25 | 35 | % | LOOK T2.15, p.50 |
| SPT N-value | Granular soil | GW-SM | Medium dense | 10 | 20 | 30 | blows/ft | LOOK T2.15, p.50 |
| Relative density | Granular soil | GW-SM | Medium dense | 35 | 50 | 65 | % | LOOK T2.15, p.50 |
| SPT N-value | Granular soil | GW-SM | Dense | 30 | 40 | 50 | blows/ft | LOOK T2.15, p.50 |
| Relative density | Granular soil | GW-SM | Dense | 65 | 75 | 85 | % | LOOK T2.15, p.50 |
| SPT N-value | Granular soil | GW-SM | Very dense | 50 | blows/ft | LOOK T2.15, p.50 | ||
| Relative density | Granular soil | GW-SM | Very dense | 85 | % | LOOK T2.15, p.50 | ||
| Undrained shear strength | Clay | CL-CH | Very soft | 418 | psf | CRAIG T4.1, p.121 | ||
| Undrained shear strength | Clay | CL-CH | Soft | 418 | 626.5 | 835 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Firm | 835 | 1,200 | 1,566 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Stiff | 1,566 | 2,350 | 3,133 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Very stiff | 3,133 | 4,700 | 6,266 | psf | CRAIG T4.1, p.121 |
| Undrained shear strength | Clay | CL-CH | Hard | 6,266 | psf | CRAIG T4.1, p.121 | ||
| Density index (relative density) | Sand | SP-SW | Very loose (N = 0–4) | 0 | 7.5 | 15 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Very loose (N = 0–4) | 0 | 1.5 | 3 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Loose (N = 4–10) | 15 | 25 | 35 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Loose (N = 4–10) | 3 | 5.5 | 8 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Medium dense (N = 10–30) | 35 | 50 | 65 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Medium dense (N = 10–30) | 8 | 16.5 | 25 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Dense (N = 30–50) | 65 | 75 | 85 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Dense (N = 30–50) | 25 | 33.5 | 42 | blows/ft | CRAIG T8.3, p.309 |
| Density index (relative density) | Sand | SP-SW | Very dense (N > 50) | 85 | 92.5 | 100 | % | CRAIG T8.3, p.309 |
| Normalized SPT value | Sand | SP-SW | Very dense (N > 50) | 42 | 50 | 58 | blows/ft | CRAIG T8.3, p.309 |
| Presumed allowable bearing value (BS 8004) | Dense gravel, or dense sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 12.5 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Medium dense gravel, or sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 4.2 | 8.3 | 12.5 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Loose gravel, or sand and gravel | GW, GP, SW | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 4.2 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Compact sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 6.3 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Medium dense sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 2.1 | 4.2 | 6.3 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Loose sand | SW, SP | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 2.1 | ksf | CURTIN T1.1, p.5 | ||
| Presumed allowable bearing value (BS 8004) | Very stiff boulder clay and hard clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 6.3 | 9.4 | 12.5 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Stiff clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 3.1 | 4.7 | 6.3 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Firm clay | CL, CH | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 1.6 | 2.35 | 3.1 | ksf | CURTIN T1.1, p.5 |
| Presumed allowable bearing value (BS 8004) | Soft clay and silt | CL, CH, ML | Footing width ≥ 3.3 ft; groundwater ≥ B below base | 1.6 | ksf | CURTIN T1.1, p.5 | ||
| Undrained strength of clay from hand-sample identification | Clay | Very soft | Extrudes between fingers | 420 | psf | ATKINSON T5.2, p.61 | ||
| Undrained strength of clay from hand-sample identification | Clay | Soft | Easily molded in fingers | 420 | 630 | 840 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Firm | Molded by strong finger pressure | 840 | 1,205 | 1,570 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Stiff | Cannot be molded in fingers | 1,570 | 1,830 | 2,090 | psf | ATKINSON T5.2, p.61 |
| Undrained strength of clay from hand-sample identification | Clay | Very stiff | Can be indented by thumbnail | 3,130 | psf | ATKINSON T5.2, p.61 |
| Property | Soil / material | Class | Condition | Low | Typical | High | Units | Source |
|---|---|---|---|---|---|---|---|---|
| Dry unit weight | Sands and gravels | GW-SP | Very loose | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Very loose | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Loose | 95.5 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Loose | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Medium dense | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Medium dense | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Dense | 121 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Dense | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands and gravels | GW-SP | Very dense | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands and gravels | GW-SP | Very dense | 140 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Loose, uniformly graded | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Loose, uniformly graded | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Loose, well graded | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Loose, well graded | 121 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Dense, uniformly graded | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Dense, uniformly graded | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Sands | SP / SW | Dense, well graded | 121 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Sands | SP / SW | Dense, well graded | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 50.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – organic | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 76.4 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Soft – non-organic | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 101.9 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Stiff | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Cohesive soils | CL-CH / OL-OH | Hard | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – soft sedimentary (chalk, shale, siltstone, coal) | Rockfill | Compacted | 76.4 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – soft sedimentary (chalk, shale, siltstone, coal) | Rockfill | Compacted | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – hard sedimentary (conglomerate, sandstone) | Rockfill | Compacted | 89.1 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – hard sedimentary (conglomerate, sandstone) | Rockfill | Compacted | 121 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – metamorphic | Rockfill | Compacted | 114.6 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – metamorphic | Rockfill | Compacted | 127.3 | pcf | LOOK T7.3, p.104 | ||
| Dry unit weight | Broken rock – igneous | Rockfill | Compacted | 108.2 | pcf | LOOK T7.3, p.104 | ||
| Saturated unit weight | Broken rock – igneous | Rockfill | Compacted | 133.7 | pcf | LOOK T7.3, p.104 | ||
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Very loose | 108.2 | 111.4 | 114.6 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Very loose | 82.8 | 85.9 | 89.1 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Loose | 114.6 | 117.8 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Loose | 89.1 | 92.3 | 95.5 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Medium dense | 121 | 124.2 | 127.3 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Medium dense | 95.5 | 105 | 114.6 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Dense | 127.3 | 133.7 | 140 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Dense | 108.2 | 117.8 | 127.3 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Sand and gravel | GW-SP | Very dense | 140 | 143.2 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Sand and gravel | GW-SP | Very dense | 127.3 | 133.7 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Poorly graded sands | SP | Natural | 108.2 | 114.6 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Poorly graded sands | SP | Natural | 82.8 | 89.2 | 95.5 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Well-graded sands | SW | Natural | 114.6 | 130.5 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Well-graded sands | SW | Natural | 89.1 | 114.5 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Well-graded sand–gravel mixtures | GW / SW | Natural | 121 | 133.7 | 146.4 | pcf | CB T3.1, p.79 |
| Dry unit weight | Well-graded sand–gravel mixtures | GW / SW | Natural | 95.5 | 117.8 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – unconsolidated muds | OH / CH | Natural | 101.9 | 105.1 | 108.2 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – unconsolidated muds | OH / CH | Natural | 57.3 | 63.6 | 70 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – soft, open-structured | CL-CH | Natural | 108.2 | 114.6 | 121 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – soft, open-structured | CL-CH | Natural | 70 | 79.5 | 89.1 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 114.6 | 127.3 | 140 | pcf | CB T3.1, p.79 |
| Dry unit weight | Clay – firm or stiff, normally consolidated | CL-CH | Natural | 82.8 | 101.9 | 121 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Glacial till (boulder clay) | CL / SC / GC | Natural | 127.3 | 140.1 | 152.8 | pcf | CB T3.1, p.79 |
| Dry unit weight | Glacial till (boulder clay) | CL / SC / GC | Natural | 108.2 | 124.1 | 140 | pcf | CB T3.1, p.79 |
| Bulk (saturated) unit weight | Tropical red clays | CL-MH | Natural | 108.2 | 120.9 | 133.7 | pcf | CB T3.1, p.79 |
| Dry unit weight | Tropical red clays | CL-MH | Natural | 82.8 | 98.7 | 114.6 | pcf | CB T3.1, p.79 |
| Specific gravity of solids | Quartz sand | SP / SW | 2.65 | – | CB T3.1, p.79 | |||
| Specific gravity of solids | Calcareous sand | SP / SW | 2.64 | 2.675 | 2.71 | – | CB T3.1, p.79 | |
| Specific gravity of solids | Most clay minerals | CL-CH | 2.67 | 2.7 | 2.73 | – | CB T3.1, p.79 |
Full database · Laboratory tests · Download Excel · Library documents for this chapter · Calculators for this chapter
Every boring produces three numbers long before the laboratory program is finished: the Standard Penetration Test blow count (N), the natural moisture content (w) and, for fine-grained soils, the liquid limit (LL) and plastic limit (PL). This appendix turns those numbers into typical engineering properties for each soil type, so a preliminary analysis can start the day the boring logs arrive.
Use it in this order:
All values are in English units: unit weight in pcf, stress and strength in psf (or ksf), modulus in ksf, permeability in ft/day.
The tables in this appendix are based on N60, the blow count corrected to 60% of the theoretical hammer energy. Field blow counts must be corrected first; an automatic hammer delivers 80% to 95% energy, so its raw N reads low against the correlations.
Eq. D-1 (Skempton 1986; Liao and Whitman 1986; σ′v in psf)
| Factor | Condition | Value |
|---|---|---|
| Em (hammer efficiency, %) | Donut hammer / safety hammer (rope and cathead) / automatic trip hammer | 45 / 60 / 80–95 (measure per ASTM D4633, withdrawn 2025 where possible) |
| CB (borehole diameter) | 2.5–4.5 in. / 6 in. / 8 in. | 1.00 / 1.05 / 1.15 |
| CS (sampler) | Standard sampler / sampler without liners | 1.0 / 1.1–1.3 |
| CR (rod length) | < 13 ft / 13–20 ft / 20–33 ft / > 33 ft | 0.75 / 0.85 / 0.95 / 1.0 |
Source: Skempton (1986); Youd et al. (2001); ASTM D1586 and D4633 (withdrawn 2025). Full procedure in Chapter 4.1, Section 4.1.3.
| Description | N60 (blows/ft) | (N1)60 | Relative density, Dr (%) | Field feel |
|---|---|---|---|---|
| Very loose | 0–4 | 0–3 | 0–15 | Easily penetrated with a ½-in. bar pushed by hand |
| Loose | 5–10 | 3–8 | 15–35 | Easily penetrated with a ½-in. bar |
| Medium dense | 11–30 | 8–25 | 35–65 | Penetrated about 1 ft with a ½-in. bar driven by a 5-lb hammer |
| Dense | 31–50 | 25–42 | 65–85 | Penetrated a few inches with a driven ½-in. bar |
| Very dense | > 50 | > 42 | 85–100 | Penetrated only a fraction of an inch with a driven bar |
Source: Terzaghi and Peck (1948, 1967); (N1)60 bands after Skempton (1986). Dr can also be estimated from Dr = √[(N1)60/46] (Idriss and Boulanger 2008).
| Consistency | N60 (blows/ft) | Unconfined compressive strength, qu (psf) | Undrained shear strength, su (psf) | Field feel |
|---|---|---|---|---|
| Very soft | 0–2 | < 500 | < 250 | Extrudes between fingers when squeezed |
| Soft | 3–4 | 500–1,000 | 250–500 | Molded by light finger pressure |
| Medium stiff | 5–8 | 1,000–2,000 | 500–1,000 | Molded by strong finger pressure |
| Stiff | 9–15 | 2,000–4,000 | 1,000–2,000 | Indented by thumb |
| Very stiff | 16–30 | 4,000–8,000 | 2,000–4,000 | Indented by thumbnail |
| Hard | > 30 | > 8,000 | > 4,000 | Difficult to indent with thumbnail |
Source: Terzaghi and Peck (1967); field descriptions per ASTM D2488. su = qu/2.
For gravels and sands, the blow count controls the estimate. Moisture content has little effect on the strength of clean coarse soils, but it is needed for unit weight above the water table.
| Property | Very loose | Loose | Medium dense | Dense | Very dense |
|---|---|---|---|---|---|
| N60 (blows/ft) | 0–4 | 5–10 | 11–30 | 31–50 | > 50 |
| Friction angle, φ′ (deg) | 26–29 | 29–31 | 31–36 | 36–41 | 41–45 |
| Moist unit weight, γ (pcf) | 90–100 | 95–110 | 105–120 | 115–130 | 120–135 |
| Saturated unit weight, γsat (pcf) | 110–118 | 115–122 | 120–128 | 125–135 | 130–140 |
| Natural moisture above water table (%) | 3–15 | 3–15 | 3–12 | 3–10 | 3–10 |
| Young's modulus, Es (ksf) | 100–200 | 200–500 | 500–1,000 | 1,000–1,700 | 1,700–2,500 |
| Coefficient of subgrade reaction, ks, 1-ft plate, above / below water table (pci) | < 45 / < 30 | 45 / 30 | 150 / 95 | 580 / 350 | > 580 / > 350 |
Source: φ′: Peck, Hanson and Thornburn (1974) and NAVFAC DM-7.01 (1986). Unit weights: NAVFAC DM-7.01 and Holtz, Kovacs and Sheahan (2011). Es: Bowles (1996). ks: Terzaghi (1955) for a 1-ft square plate (his recommended 40, 130 and 500 tons/ft³ for loose, medium dense and dense sand above the water table and 25, 80 and 300 tons/ft³ submerged, converted to pci); scale to the loaded width before use. These are vertical plate values, not the p-y modulus constants used for laterally loaded piles.
| USCS group | φ′ adjustment to Table D-4 | Unit weight adjustment | Permeability, k (ft/day) | Notes |
|---|---|---|---|---|
| GW, GP (gravels) | +2° to +4° | +5 to +10 pcf | 300–3,000 (GP), 30–300 (GW) | N inflated by cobbles; discount refusal blows |
| GM, GC (silty, clayey gravel) | 0° to +2° | +5 pcf | 0.003–3 | Drainage and frost behavior controlled by fines |
| SW, SP (clean sand) | Table D-4 as given | — | 3–300 (SP fine sand 3–30) | — |
| SM (silty sand) | −2° to −4° | −0 to −5 pcf | 0.03–3 | See Chapter 2.4 for silt-controlled behavior; liquefiable when loose and saturated |
| SC (clayey sand) | −3° to −6°; c′ = 0–200 psf | — | 0.0003–0.03 | Moisture-sensitive; use D.3 for strength if fines are plastic and exceed about 30% |
Source: Holtz, Kovacs and Sheahan (2011); NAVFAC DM-7.01 (1986); USACE EM 1110-2-1901 (permeability).
Eq. D-2 (Peck, Hanson and Thornburn 1974, as fitted by Wolff 1989)
Eq. D-3 (Kulhawy and Mayne 1990; Schmertmann 1975)
Eq. D-2 uses the overburden-corrected blow count, as the Peck, Hanson and Thornburn chart does; it gives about 28° at (N1)60 = 4, 30° at 10, 33° at 20, 36° at 30 and 38° at 40. Eq. D-3 uses N60 and σ′v directly and is a useful cross-check below about 20 ft. Hatanaka and Uchida (1996), in the FHWA GEC 5 form for 60% energy, φ′ = √[15.4 (N1)60] + 20, gives higher values (about 37.5° at (N1)60 = 20; the original √(20 N1) + 20 is for Japanese SPT energy) and is calibrated on high-quality frozen samples of clean sand; cap it at 45° and do not use it for silty sands.
Eq. D-4 (after Bowles 1996, converted from kPa)
Eq. D-4 and the Es/pa ≈ 10 N60 form used by the calculator (Kulhawy and Mayne 1990) give values near the lower end of the Table D-4 ranges for medium dense and denser sand; the spread is typical of modulus correlations, and the lower value is the safer one for settlement.
Follow-up testing: Grain-size analysis (ASTM D6913) on every sample; energy measurement of the SPT hammer (ASTM D4633, withdrawn 2025); direct shear (ASTM D3080) on reconstituted samples at field density; CPTu soundings for continuous density profile; field permeability tests where drainage or dewatering governs.
| Property | Very soft | Soft | Medium stiff | Stiff | Very stiff | Hard |
|---|---|---|---|---|---|---|
| N60 (blows/ft) | 0–2 | 3–4 | 5–8 | 9–15 | 16–30 | > 30 |
| Undrained strength, su (psf) | < 250 | 250–500 | 500–1,000 | 1,000–2,000 | 2,000–4,000 | > 4,000 |
| Saturated unit weight, γsat (pcf) | 95–110 | 100–115 | 110–120 | 115–125 | 120–130 | 125–135 |
| Typical natural moisture, w, in CL (%) | > 40 | 30–40 | 25–32 | 18–28 | 14–22 | < 16 |
| Typical liquidity index, LI | > 1.0 | 0.75–1.0 | 0.5–0.75 | 0.25–0.5 | 0–0.25 | < 0 |
| Young's modulus, Eu (undrained, ksf) | < 50 | 50–150 | 150–300 | 300–600 | 600–1,200 | > 1,200 |
| Coefficient of subgrade reaction, ks (pci, 1-ft plate) | — | — | < 60 | 60–115 | 115–230 | > 230 |
Source: Consistency and su: Terzaghi and Peck (1967). Unit weights: NAVFAC DM-7.01 (1986). Eu = 200 to 500 su for CL/CH (Duncan and Buchignani 1976), shown here at about 300 su. ks: Terzaghi (1955). Moisture and LI ranges are typical of inorganic lean clay and are given for cross-checking only.
Eq. D-5 (Stroud 1974; f1 about 135 psf for PI ≈ 15 and about 92 psf for PI ≥ 40, or 6.5 to 4.4 kPa)
Eq. D-6 (Skempton 1957; Mesri 1975 and Ladd 1991 SHANSEP form)
Eq. D-6 gives su of normally consolidated clay from its effective stress, which is often more reliable than the blow count in soft clay (N60 < 4), where one blow either way changes the consistency class.
Eq. D-7 (Bjerrum and Simons 1960; normally consolidated clays with PI about 10 to 80)
| PI | 10 | 20 | 30 | 40 | 60 |
|---|---|---|---|---|---|
| φ′ (deg), peak, normally consolidated | 36 | 31 | 29 | 27 | 25 |
| Typical fully softened φ′ (deg) | 30–34 | 26–31 | 23–28 | 20–26 | 17–23 |
| Typical residual φ′r (deg) | 25–30 | 18–26 | 13–20 | 10–16 | 8–13 |
Source: Peak: Bjerrum and Simons (1960). Fully softened and residual: Stark and Eid (1994, 1997) and Stark, Choi and McCone (2005), ranges for effective normal stress of 1,000 to 4,000 psf; values depend on clay-size fraction and LL. Use fully softened strength for cut slopes and compacted clay fills, and residual strength where a slide surface has formed (Chapter 6.3, Section 6.3.6).
Follow-up testing: Pocket penetrometer and torvane on every Shelby tube and split-spoon sample (screening only); unconfined compression (ASTM D2166) or UU triaxial (ASTM D2850) on tube samples; field vane (ASTM D2573) or CPTu in soft clay; CU triaxial with pore pressure (ASTM D4767) for effective-stress parameters; ring shear (ASTM D6467) or torsional ring shear for residual strength in slide repairs.
Moisture content and the Atterberg limits are cheap, fast and repeatable, and they are often more informative than the blow count in soft and medium fine-grained soils. Run them on every fine-grained sample.
Eq. D-8
| LI | Condition | Typical su of the remolded soil (psf, Eq. D-9) | Engineering meaning |
|---|---|---|---|
| > 1.0 | Above the liquid limit | < 35 | Very soft, sensitive or quick if structure is disturbed; normally consolidated or underconsolidated; expect large settlement |
| 0.75–1.0 | Near the liquid limit | 35–110 | Soft; normally consolidated |
| 0.5–0.75 | Upper plastic range | 110–360 | Medium stiff |
| 0.25–0.5 | Mid plastic range | 360–1,100 | Stiff; often lightly overconsolidated |
| 0–0.25 | Near the plastic limit | 1,100–3,550 | Very stiff; overconsolidated or desiccated |
| < 0 | Below the plastic limit | > 3,550 | Hard; heavily overconsolidated, desiccated or cemented; check for swell |
Eq. D-9 (after Wroth and Wood 1978: about 35 psf at the liquid limit and about 3,550 psf at the plastic limit)
Source: Liquidity index: ASTM D4318 definitions; behavior after Terzaghi, Peck and Mesri (1996) and Mitchell and Soga (2005). Eq. D-9 gives remolded strength; undisturbed strength of structured or overconsolidated clay can be several times higher.
Eq. D-10 (Terzaghi and Peck 1967; Koppula 1981; Mesri and Godlewski 1977; wn in %)
| USCS group | Typical LL | Typical wn below water table (%) | Cc | Cr | cv (ft2/day) | Typical k (ft/day) |
|---|---|---|---|---|---|---|
| ML | 25–45 | 15–35 | 0.10–0.30 | 0.01–0.05 | 0.5–20 | 0.003–3 |
| CL | 25–50 | 15–40 | 0.15–0.40 | 0.02–0.06 | 0.1–2 | 0.0003–0.03 |
| MH | 50–80 | 30–60 | 0.30–0.80 | 0.03–0.10 | 0.05–2 | 0.0003–0.03 |
| CH | 50–100 | 30–70 | 0.40–1.0 | 0.05–0.15 | 0.01–0.5 | 0.00003–0.003 |
| OL / OH | 35–80 | 40–150 | 0.40–1.5 | 0.05–0.20 | 0.02–1 | 0.0003–0.03 |
Ranges compiled from Holtz, Kovacs and Sheahan (2011), Terzaghi, Peck and Mesri (1996) and NAVFAC DM-7.01 (1986).
Below the water table a fine-grained soil is saturated, so its moisture content fixes its void ratio and unit weight:
Eq. D-11 (S = 100%; γw = 62.4 pcf)
| w (%) | 15 | 20 | 25 | 30 | 40 | 50 | 60 | 80 | 100 |
|---|---|---|---|---|---|---|---|---|---|
| Void ratio, e | 0.41 | 0.54 | 0.68 | 0.81 | 1.08 | 1.35 | 1.62 | 2.16 | 2.70 |
| γsat (pcf) | 138 | 131 | 126 | 121 | 113 | 108 | 103 | 96 | 91 |
| γd (pcf) | 120 | 109 | 101 | 93 | 81 | 72 | 64 | 53 | 46 |
Computed from Eq. D-11. For each 0.1 change in Gs, γsat changes by about 1 to 3 pcf. Use Gs = 2.60 to 2.65 for soils with organic content and 2.75 to 2.80 for micaceous or iron-rich soils.
Follow-up testing: Natural moisture (ASTM D2216) on every sample; Atterberg limits (ASTM D4318, wet preparation) on each fine-grained stratum; specific gravity (ASTM D854) where unit weight governs; one-dimensional consolidation (ASTM D2435 or D4186) on tube samples under embankments and structures; organic content (ASTM D2974) where w or color suggest organics.
Remolded strength. Skempton and Northey (1952) found that remolded strength plotted on a log scale is nearly linear in liquidity index, which gives su,r = n × 102(1 − LI) kPa, with n = 1 for 1 kPa (21 psf) at the liquid limit and 100 kPa (2,090 psf) at the plastic limit. In psf:
su,r ≈ 21 × 102(1 − LI) (psf, n = 1)
Carter and Bentley found that n = 1 fits the measured strengths better than n = 2 but can still overestimate by a factor of 2 to 3. Eq. D-9 runs about 1.7 times higher than n = 1, so treat its values as an upper estimate of remolded strength.
Sensitivity from liquidity index. For clays of moderate sensitivity with liquidity index up to about 1.3, the Skempton and Northey trend is fitted by:
St ≈ 5.7 LI4 + 2 LI + 1
Undisturbed strength can then be estimated as St × su,r. The data behind this trend do not include the highly sensitive clays of eastern Canada and Scandinavia, which can be far more sensitive at the same LI.
| LI | 0 | 0.25 | 0.5 | 0.75 | 1.0 | 1.2 |
|---|---|---|---|---|---|---|
| Sensitivity St | 1.0 | 1.5 | 2.4 | 4.3 | 8.7 | 15 |
| Remolded su,r, n = 1 (psf) | 2,090 | 660 | 210 | 66 | 21 | 8 |
| Remolded su,r, Eq. D-9 (psf) | 3,550 | 1,120 | 360 | 110 | 36 | 14 |
| Undisturbed estimate St × su,r (psf) | 2,090–3,550 | 1,000–1,700 | 490–840 | 280–490 | 180–310 | 130–220 |
The European definitions of consistency (EC7) are based on liquidity index. Carter and Bentley converted them to strength ranges using these same relations, and the ranges are wide: very soft (LI > 0.75) under about 1,040 psf; soft (0.5–0.75) 520–1,460 psf; firm (0.25–0.5) 730–2,090 psf; stiff (0–0.25) 1,040–2,090 psf; very stiff (LI < 0) 1,460–2,920 psf. Their advice is that a hand vane or pocket penetrometer gives a far more reliable strength than any index correlation.
Strength from SPT, continuous form of Eq. D-5. Carter and Bentley fitted the Stroud and Butler (1975) curve for overconsolidated clays as su/N = 8,910/PI3 + 4.36 kPa, or in psf:
f1 = su/N60 ≈ 186,000 / PI3 + 91 (psf per blow; PI about 15 to 65)
This gives 146 psf at PI 15, 114 at PI 20, 98 at PI 30 and 92 at PI 60, consistent with the end points of Eq. D-5. Measured values scatter from about 10% above to 20% below the curve. The curve was derived only from overconsolidated deposits, and it should be used in normally consolidated clay only with caution, if at all.
Friction angle from plasticity index. Gibson (1953) related the drained friction angle of remolded clays, and the “true” angle of internal friction, to PI. Carter and Bentley fitted the curves as:
φ′ = 0.0058 PI1.73 − 0.32 PI + 36.2 φ′r = 0.084 PI1.4 − 0.75 PI + 31.9 (degrees)
| PI | 10 | 15 | 20 | 30 | 40 | 60 |
|---|---|---|---|---|---|---|
| Gibson peak φ′, remolded (deg) | 33.3 | 32.0 | 30.8 | 28.7 | 26.8 | 23.9 |
| Eq. D-7 peak φ′, normally consolidated (deg) | 35.7 | 33.1 | 31.2 | 28.7 | 27.0 | 24.5 |
| Gibson “true” angle φ′r (deg) | 26.5 | 24.4 | 22.5 | 19.2 | 16.6 | 12.8 |
| Table D-7 residual φ′r, ring shear (deg) | 25–30 | – | 18–26 | 13–20 | 10–16 | 8–13 |
The two peak relations agree within about 2° above PI 15. Gibson’s “true” angle is not a ring-shear residual strength: at PI 40 and above it plots at or above the top of the Table D-7 residual range. For a slide surface that has already formed, use the Table D-7 residual values or ring-shear tests.
For railroad work: On long track and embankment projects, moisture content and Atterberg limits are run on almost every sample, while strength tests are few. The relations above turn those index tests into a strength profile that shows where the soft, sensitive zones are, between the borings with vane or laboratory strength. Flag any sample with LI above about 0.75: it is likely to be sensitive, to lose much of its strength when disturbed by undercutting, piling or vibration, and to need field vane or CPTu strength before any stability or bearing design (Example D-2).
Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., §6.5.1–6.5.3 and §6.6, Eqs. 6.18–6.21, 6.27–6.28, Table 6.2, Figs. 6.4, 6.5, 6.10, 6.11. Summarized and paraphrased; equations converted to psf. Full reference under Author and Sources.
| Property | Organic silt / clay (OL, OH) | Peat (PT) |
|---|---|---|
| Organic content (ASTM D2974, %) | 5–30 | > 50 |
| N60 (blows/ft) | 0–5 | 0–2 (often weight of hammer) |
| Natural moisture, w (%) | 40–150 | 200–1,500 |
| Bulk unit weight, γ (pcf) | 85–105 | 60–75 |
| Specific gravity, Gs | 2.30–2.65 | 1.4–2.0 |
| Undrained strength, su (psf) | 100–600 | 100–400 (fibrous peat: use effective-stress methods) |
| Cc/(1 + e0) | 0.15–0.35 | 0.30–0.60 |
| Cα/Cc | 0.04–0.06 | 0.05–0.07 |
| Typical correlation | Cc ≈ 0.0115 wn (organic soils, wn in %) | Cc ≈ 0.01 wn; secondary compression governs long-term settlement |
Source: Mesri and Ajlouni (2007); Mesri, Stark, Ajlouni and Chen (1997); Edil and den Haan (1994); Holtz, Kovacs and Sheahan (2011).
Follow-up testing: Continuous sampling or probing to define the extent and thickness; organic content and ash content (ASTM D2974); consolidation tests with long secondary-compression stages; field vane or CPTu for strength; settlement plates and piezometers during fill placement (Chapter 5.3).
One line per common soil type and condition. Use it for the first pass of a boring log; refine with the detailed tables above.
| Soil (USCS) and condition | N60 | w (%) | LL | γ (pcf) | φ′ (deg) | c′ or su (psf) | Es (ksf) | k (ft/day) | Soaked CBR |
|---|---|---|---|---|---|---|---|---|---|
| GW/GP, dense | 30–50+ | 3–8 | NP | 130–140 | 38–44 | 0 | 1,500–4,000 | 30–3,000 | 40–80 |
| GM/GC, medium dense | 15–35 | 6–15 | NP–35 | 125–135 | 33–38 | 0–200 | 800–2,000 | 0.003–3 | 20–40 |
| SW/SP, loose | 5–10 | 3–15 | NP | 95–110 | 29–31 | 0 | 200–500 | 3–300 | 10–20 |
| SW/SP, medium dense | 11–30 | 3–12 | NP | 105–120 | 31–36 | 0 | 500–1,000 | 3–300 | 15–30 |
| SM, medium dense | 11–30 | 8–20 | NP–30 | 110–125 | 29–34 | 0 | 300–800 | 0.03–3 | 10–20 |
| SC, medium dense | 11–30 | 10–20 | 25–40 | 115–128 | 27–32 | c′ 0–200 | 300–700 | 0.0003–0.03 | 5–15 |
| ML, loose / soft | 2–8 | 20–35 | 25–45 | 110–120 | 27–31 | c′ 0 | 40–90 | 0.003–3 | 3–6 |
| ML, medium dense / stiff | 9–20 | 15–25 | 25–45 | 115–125 | 30–34 | c′ 0–100 | 90–160 | 0.003–0.3 | 5–10 |
| CL, soft | 2–4 | 30–40 | 30–50 | 105–115 | 28–32 | su 250–500 | 50–150 | 0.0003–0.03 | 2–4 |
| CL, stiff | 9–15 | 18–28 | 30–50 | 120–128 | 28–32 | su 1,000–2,000 | 300–600 | 0.0003–0.03 | 4–8 |
| CL, very stiff to hard | 16–40 | 12–20 | 30–50 | 125–135 | 28–32 | su 2,000–6,000 | 600–1,800 | 0.0003–0.03 | 6–12 |
| MH, firm | 4–10 | 35–55 | 50–80 | 95–110 | 26–31 | su 400–1,000 | 40–150 | 0.0003–0.03 | 2–6 |
| CH, soft | 2–4 | 40–70 | 50–90 | 95–110 | 24–29 | su 250–500 | 40–150 | 0.00003–0.003 | 1–3 |
| CH, stiff | 9–15 | 25–40 | 50–90 | 110–120 | 24–29 | su 1,000–2,000 | 300–600 | 0.00003–0.003 | 2–5 |
| OL/OH | 0–5 | 40–150 | 35–80 | 85–105 | 22–30 | su 100–600 | 10–60 | 0.0003–0.03 | 1–3 |
| PT (peat) | 0–2 | 200–1,500 | — | 60–75 | — | su 100–400 | < 20 | 0.003–3 | < 1 |
φ′ for fine-grained soils is the peak drained value for normally consolidated material (Eq. D-7); use fully softened or residual values where Section D.3 calls for them. Es for clays is the undrained modulus. NP = non-plastic. CBR ranges after USACE and AASHTO subgrade practice; see Chapter 6.3.
Source: Compiled from Tables D-1 to D-11 and their sources; CBR from USACE EM 1110-3-138 and the Unified Facilities Criteria for pavement subgrades (UFC 3-250-01).
| Topic | Primary sources | Basis of the data |
|---|---|---|
| SPT corrections and density terms | Terzaghi and Peck (1948, 1967); Skempton (1986); Youd et al. (2001) | Field and laboratory comparisons, mostly in clean quartz sands |
| Friction angle of sands from N | Peck, Hanson and Thornburn (1974); Schmertmann (1975); Kulhawy and Mayne (1990); Hatanaka and Uchida (1996) | Back-calculation and triaxial tests on reconstituted and frozen samples |
| Unit weights and moisture | NAVFAC DM-7.01 (1986); phase relationships (Eq. D-11) | Compilations of laboratory data from U.S. projects |
| Consistency and su of clays from N | Terzaghi and Peck (1967); Stroud (1974) | Comparison of SPT with unconfined and triaxial tests; Stroud's data are from UK overconsolidated clays |
| su from stress history and PI | Skempton (1957); Ladd and Foott (1974); Mesri (1975); Ladd (1991) | Field vane and laboratory tests on normally and lightly overconsolidated clays |
| Friction angle of clays from PI | Bjerrum and Simons (1960); Stark and Eid (1994, 1997) | Triaxial and ring shear tests |
| Liquidity index and remolded strength | Wroth and Wood (1978); Mitchell and Soga (2005) | Fall-cone and vane tests on remolded soils |
| Compressibility | Terzaghi and Peck (1967); Hough (1957); Koppula (1981); Mesri and Godlewski (1977) | Oedometer test databases |
| Modulus and subgrade reaction | Bowles (1996); Duncan and Buchignani (1976); Terzaghi (1955) | Plate load, pressuremeter and laboratory data |
| Organic soils and peat | Mesri and Ajlouni (2007); Edil and den Haan (1994) | Field and oedometer data from peat and organic deposits |
| Permeability | USACE EM 1110-2-1901; Holtz, Kovacs and Sheahan (2011) | Laboratory and field test compilations |
List every Appendix D value used in a calculation, then schedule the test that replaces it. The table is ordered from the cheapest screening tests to the definitive tests.
| Parameter estimated from Appendix D | Screening test (every boring) | Definitive test | When the definitive test is needed |
|---|---|---|---|
| Soil classification | Visual-manual (ASTM D2488) | Grain size (D6913, D7928) and Atterberg limits (D4318); classification (D2487) | Always, for each stratum |
| Moisture content, unit weight | Moisture content (D2216) | Unit weight of tube samples (D7263); specific gravity (D854) | Settlement, stability and earth pressure analyses |
| Relative density, φ′ of sand | SPT with energy measurement (D1586, D4633) | CPTu (D5778); direct shear (D3080) or CD triaxial (D7181) on reconstituted samples | Foundations, walls, liquefaction checks |
| su of clay | Pocket penetrometer, torvane | UU triaxial (D2850), unconfined compression (D2166), field vane (D2573), CPTu | Embankments on soft ground; end-of-construction stability; bearing on clay |
| Effective-stress strength of clay | Atterberg limits (Eq. D-7) | CU triaxial with pore pressure (D4767); direct shear (D3080) | Long-term slope and wall design |
| Fully softened and residual strength | Atterberg limits and clay fraction | Ring shear (D6467, D7608) | Cut slopes in clay, slide repairs |
| Compressibility and stress history | Moisture, LL, LI | Consolidation (D2435, D4186); CPTu with dissipation | Fills, structures and embankments on fine-grained soils |
| Modulus and subgrade reaction | SPT, DCP (D6951) | Plate load test (D1196), pressuremeter (D4719), seismic methods (MASW) | Track modulus, slabs, crane rails, machine foundations |
| Permeability | Grain size (Hazen-type estimates) | Slug or pumping tests; laboratory permeability (D5084, D2434) | Dewatering, seepage, drainage design |
| Subgrade support (CBR, Mr) | DCP (D6951) | Laboratory CBR (D1883), resilient modulus (AASHTO T 307) | Track subgrade and pavement design (Chapter 7.3) |
| Organic soils | Color, odor, moisture | Organic content (D2974); long-term consolidation | Any fill or structure over organic soil |
See Chapter 5.2, Section 5.2.3 for test procedures and Chapter 5.1 for in situ testing.
A boring for a culvert replacement under a main-line embankment, with blow counts and index tests only. The appendix tables and correlations give preliminary design parameters, and a stress-history check tests whether they make sense together before anything is designed.
| Variable | Value | Description |
|---|---|---|
| 0 to 8 ft | SP-SM; N = 12 at 6 ft; w = 9% | Water table at 8 ft |
| 8 to 20 ft | CL; N = 4 to 6; w = 31%; LL 38; PL 19 | |
| Below 20 ft | SP; N = 38 | |
| Hammer | Automatic, Em = 85%; CB = CS = 1.0 | |
| CR | 0.75 (5 to 10 ft rods); 0.85 (10 to 15 ft) |
Preliminary values: sand φ′ = 31°; clay su = 500 psf (flagged); Cc = 0.28.
The N-based strength is more than twice what a normally consolidated clay at this depth would have, so 500 psf is used and the discrepancy is flagged rather than resolved by choosing the higher number. Record the basis in the calculation package (Tables D-3, D-4, D-5, D-8 and D-10; Eqs. D-5 to D-10) and replace the values with UU triaxial, consolidation and grain-size results before final design.
A Class I railroad located in Indiana plans to raise a main-line embankment 3 ft over a lean clay foundation. The borings have blow counts and index tests but no strength tests yet. At mid-depth of the clay, a sample has w = 32%, LL = 42 and PL = 20, with N60 = 6. The engineer must estimate the undrained strength from both the index tests and the blow count, judge how sensitive the clay is, estimate a drained friction angle, and decide what strength testing to order before the stability analysis.
| Variable | Value | Description |
|---|---|---|
| w | 32% | Natural moisture content at mid-depth of the clay |
| LL, PL | 42, 20 | Atterberg limits; PI = 22 |
| N60 | 6 | Energy-corrected blow count at the same depth |
(a) LI = 0.55 and St ≈ 2.6. (b) Remolded strength 170 to 290 psf; undisturbed strength 440 to 750 psf. (c) su ≈ 650 psf from N60. (d) φ′ ≈ 30° and a “true” angle of about 22°. (e) Order field vane or CPTu soundings and UU triaxial tests before the stability analysis.
The three estimates agree on a medium-stiff clay of about 450 to 750 psf, so a preliminary short-term stability check of the 3-ft raise can use the low end, about 450 psf. The agreement is reassuring but not proof. The Stroud factor was fitted to overconsolidated clays, and the index relations can overestimate by a factor of two or more. With a sensitivity of about 2.6, the clay keeps most of its strength under construction disturbance, but undercutting or sheet-pile driving at the toe will still reduce it locally. For the long-term case, use about 30° with c′ = 0 for intact clay; the 22° true angle is not a residual strength for an existing slide surface. Field vane or CPTu soundings at the raise, corrected for plasticity (Bjerrum’s factor, Chapter 5.1), will set the design strength.
| Topic | Refer To |
|---|---|
| SPT procedure and corrections | Chapter 4.1, Section 4.1.3 |
| In situ testing (CPTu, vane, pressuremeter, MASW) | Chapter 5.1 |
| Soil classification (USCS, AASHTO) | Chapter 2.2, Section 2.2.4 |
| Laboratory test methods | Chapter 5.2, Section 5.2.3 |
| Consolidation settlement | Chapter 6.2, Section 6.2.4 |
| Residual and fully softened strength | Chapter 6.3, Section 6.3.6 |
| Liquefaction of sands and silts | Chapter 6.5, Section 6.5.5 |
| Pavement and track subgrade values | Chapter 7.3, Section 7.3.2 |
| Silts: typical values and behavior | Chapter 2.4 |
| Analytical equations | Appendix F |
Carter and Bentley's Soil Properties and their Correlations and Look's Handbook of Geotechnical Investigation and Design Tables collect the correlations used when the only data are blow counts and index tests. The calculator applies the standard corrections and then the most widely used correlations, showing more than one where they disagree, so the user sees the spread rather than a single number. Section D.8 explains which follow-up tests replace these values for design.
Equation D-1. Corrected blow counts
| Property | Correlation | Soil |
|---|---|---|
| Relative density | Dr ≈ [(N1)60/60]0.5 (Skempton) | Sand |
| Friction angle | φ' = √(15.4(N1)60) + 20 (Hatanaka and Uchida, GEC 5 form); φ' = 27.1 + 0.3(N1)60 − 0.00054(N1)60² (Peck et al.) | Sand |
| Drained modulus | Es/Pa ≈ 10 N60 clean NC sand (5 silty, 15 OC) | Sand |
| Undrained strength | su = f1N60, f1 about 135 psf (6.5 kPa) at PI 15 to 92 psf (4.4 kPa) at PI ≥ 40 (Stroud) | Clay |
| Compression index | 0.009(LL − 10); 0.01(LL − 13); 0.012 wn (EM 1110-1-1904) | Clay |
| Sample | Data | Results |
|---|---|---|
| Sand at 12 ft, water at 6 ft | N = 14, ER 80% | N60 15.9; (N1)60 22.1; medium dense; φ' 33.5 deg to 38.4 deg; Es about 336 ksf |
| Clay at 12 ft, PI 25, LL 45, w 30% | N = 9, ER 80% | N60 10.2; stiff; su about 1,206 psf; Cc 0.32 to 0.36 |
Open the SPT correlations calculator →
SPT energy, rod, borehole, sampler and overburden corrections, then relative density, friction angle, modulus, undrained strength and compression index estimates.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.
Author: Daniel P. Colwell. This appendix was compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.