↑ Parent Menu⌂ Main Menu
← Appendix G ICE Manual Cross-Reference
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · open a dropdown to go to a section or subsection

G.2 Bibliographic Reference and Edition Notes

How the ICE Manual of Geotechnical Engineering maps to this manual, chapter by chapter, and the gap-fill chapters written from the comparison.
Author: Daniel P. Colwell
G.2 Bibliographic Reference and Edition Notes

Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Vol. I: Geotechnical Engineering Principles, Problematic Soils and Site Investigation; Vol. II: Geotechnical Design, Construction and Verification. ICE Publishing, London.

Brown, M., Burland, J., Chapman, T., Higgins, K., Skinner, H. and Toll, D. (eds) (2023). ICE Manual of Geotechnical Engineering, 2nd edition, Vols I and II. Emerald Publishing, Bingley, on behalf of ICE Publishing.

Chapter numbers in this appendix follow the published contents of the manual: 101 chapters in nine sections, Chapters 1 to 50 in Volume I and 51 to 101 in Volume II. The chapter titles are given in full so that the right chapter can be found in either edition; if a chapter number in your copy differs, use the title.

← Previous · Appendices Appendix F — Analytical Equations