↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.14 Cross-Reference Table

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.14 Cross-Reference Table
TopicSee Also
SPT N-value correction using γ_d and G_sChapter 4.1
In situ test correlation to lab parametersChapter 5.1
USCS classification using Atterberg limits and grain sizeChapter 2.2
Groundwater (effect on consolidation parameters)Chapter 2.8
Bearing capacity using c', φ' from triaxialChapter 6.1
Settlement using C_c, C_r, σ'_p from consolidationChapter 6.2
Slope stability using φ' and c' from CU triaxialChapter 6.3
Liquefaction using fines content and FC correctionChapter 6.5
CBR and M_r for pavement designChapter 7.3
Ground improvement parameter selectionChapter 7.2
Retaining wall backfill φ' from direct shearChapter 7.1
Subgrade s_u from UU triaxial for subgrade FSChapter 2.3
Reference Proctor for compaction acceptanceChapter 5.3
Lab data table format in final reportChapter 8.4
Lab test data table template (blank)Appendix B
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing