Shelby tubes (ASTM D1587, withdrawn 2024 thin-wall samples) must be:

Sample Quality Designation (Lunne et al. 1997, for OCR 1–2) — also referenced in Chapter 4.1:
| Δe/e₀ | Quality |
|---|---|
| < 0.04 | Very good to excellent |
| 0.04–0.07 | Good to fair |
| 0.07–0.14 | Poor |
| > 0.14 | Very poor |
Report SQD for all consolidation and triaxial test specimens. Note samples with SQD = Poor or Very Poor in the report, with a caveat on the reliability of the strength and compressibility parameters derived from them.
A chain of custody (COC) form must accompany every sample shipment from field to laboratory. Required fields:
Owner railroads may require COC forms to be scanned and submitted with the laboratory report as a QC attachment.