Laboratory permeability tests give the hydraulic conductivity of a specimen at a known density. Constant-head tests suit clean sands and gravels; falling-head tests suit finer sands and silts; clays need a flexible-wall permeameter (ASTM D5084). Results are corrected to 20°C because the viscosity of water changes about 2% per degree. Field values, which are controlled by layering and fissures, are usually higher; use the lab value to compare materials, design filters and check drainage layers.
Equation 5.2-11. Coefficient of permeability
Q = volume collected in time t; h = constant head difference; a = standpipe area; h1, h2 = heads at the start and end; A, L = specimen area and length; ηT/η20 = 0.889 at 25°C, 1.135 at 15°C.
A uniform sand was tested in a 6.35-cm permeameter at three heads (Das, Tables 10-2 and 10-3). The specimen’s dry mass was 726.9 g and Gs = 2.66.
| Variable | Value | Description |
|---|---|---|
| D, L | 6.35 cm; 13.2 cm | A = 31.67 cm² |
| Q | 305, 375, 395 cm³ in 60 s | |
| h | 60, 70, 80 cm | |
| T | 25°C | η25/η20 = 0.889 |
| Md | 726.9 g | Dry specimen |
The sand’s permeability is about 3 × 10−2 cm/s at 20°C, typical of a clean, uniform medium sand.
This is free-draining for a subballast or drainage blanket; check the filter criteria against the subgrade (Section 2.4.19) so fines do not migrate into it.
Open the laboratory permeability calculator →
Constant- and falling-head reductions for any number of runs, the viscosity correction to 20 °C, the specimen void ratio, k in cm/s and ft/day.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.