5.2.20 Reducing Oedometer Readings: Coefficient of Consolidation and Permeability

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.20 Reducing Oedometer Readings: Coefficient of Consolidation and Permeability

The settlement-rate calculations in Chapters 6.2, 7.2 and 2.5 all start from cv, and cv comes from fitting the time readings of each oedometer load increment to Terzaghi's theory. Craig's Soil Mechanics (Section 7.8) describes both standard fits. Casagrande's log time method finds the start of primary consolidation from the parabolic early part of the curve, and the end where the steep and secondary parts meet, then reads t50. Taylor's root time method draws a line with abscissae 1.15 times those of the straight early part and reads t90 where it meets the curve. Craig notes that the root time method needs shorter readings but does not always show a straight line. The same increment also gives mv, and from mv and cv the permeability. He also warns that small laboratory specimens often understate field cv, because they miss the silt layers and fissures that drain a clay in the field.

5.2.20.1 Method

Equation 5.2-4. Curve fitting and derived properties (Craig Eqs. 7.26 to 7.31)

Log time: cv = 0.196d²/t50;   root time: cv = 0.848d²/t90 (d = half the average specimen thickness, two-way drainage)

r0 = (a0 − as)/(a0 − af);   rp = 10(as − a90)/[9(a0 − af)];   rs = 1 − r0 − rp
mv = Δe/[(1 + e0)Δσ′];   k = cvmvγw

The calculator automates both constructions. For the root time plot it finds the longest straight run of early readings (R² above 0.997) and intersects the 1.15 line with the readings. For the log time plot it takes the corrected zero from the readings at t and 4t, and the end of primary consolidation where the steepest segment meets a line through the last three readings. Hand constructions differ from person to person, and so does this one, by a few percent.

Table 5.2-14. Verification against Craig
QuantityCraigCalculator
Example 7.4: t90 (root time)53.3 min54.5 min
Example 7.4: cv, root time / log time0.46 / 0.45 m²/yr0.45 / 0.49 m²/yr
Example 7.4: r0, rp0.080, 0.7850.083, 0.784
Example 7.4: mv0.70 m²/MN0.70 m²/MN
Problem 7.1: cv, root time / log time2.7 / 2.6 m²/yr2.77 / 2.58 m²/yr
Problem 7.1: mv0.98 m²/MN0.98 m²/MN
Problem 7.1: k8.1 × 10−10 m/s8.5 × 10−10 m/s

The log time value for Example 7.4 is about 9% higher than Craig's because the calculator's tangent at the steepest segment falls slightly differently from his hand construction.

5.2.20.2 Worked example

Craig's Example 7.4 increment, 214 to 429 kPa (4,469 to 8,960 psf), gives cv of 0.013 ft²/day by root time and 0.014 ft²/day by log time, with t90/t50 of 54.5 / 11.6 min. Secondary compression makes up about 13% of the compression in the increment. The permeability back-figured from cv and mv is 9.66 × 10−9 cm/s, typical of a clay. When this cv is used for a preload or wick drain design, compare it with field ch from CPTu dissipation tests (Chapter 5.1). The laboratory value is often the lower of the two.

Report cv for the load increment that brackets the field stresses, not an average over the whole test. Where the root time plot shows no straight line, or secondary compression swamps the primary part (organic clays, peat), use the log time method and say so in the report.

Open the oedometer curve fitting calculator →
Root time (Taylor) and log time (Casagrande) curve fitting of an oedometer load increment, compression ratios, mv and permeability, in either mm or inch dial units.

5.2.20.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • R.F. Craig, Craig's Soil Mechanics, 7th edition: Section 7.8, determination of the coefficient of consolidation, compression ratios, Example 7.4 and Problem 7.1Find source ↗Library entry
  • B.M. Das, Principles of Geotechnical Engineering, 7th edition: one-dimensional consolidation testingFind source ↗
  • P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: consolidation properties and their variabilityFind source ↗Library entry
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing