↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.17 Reducing Shear Strength Test Results

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.17 Reducing Shear Strength Test Results

The library's notes on the Mohr-Coulomb model and on drained and undrained strength cover how a set of triaxial or direct shear specimens becomes a design envelope. The common error in railroad reports is to fit c and φ to too few specimens, or to report a peak effective cohesion for a clay slope that will, over decades, soften toward zero cohesion. The calculator fits the envelope by least squares and states the fit quality so the scatter is visible.

5.2.17.1 Method

Equation 5.2-1. Triaxial results in p-q space

p = (σ1 + σ3)/2,  q = (σ1 − σ3)/2 at failure;  q = a + p tanα  →  sinφ = tanα,  c = a/cosφ

Equation 5.2-2. Direct shear

τf = c + σn tanφ fitted by least squares
Table 5.2-9. Choosing the strength for the problem
ConditionTest and strengthRailroad example
End of construction or rapid loading of saturated clayUU or CU total stress: su (φ = 0)New fill placed quickly on soft clay
Long term, drainedCU with pore pressure or CD: c', φ'Cut slopes and old embankments
Clay slopes that have softenedFully softened (c' ≈ 0)Over-steepened fill slopes in fat clay
Pre-existing slide surfaceResidual (ring or reversal shear)Reactivated slides at a track realignment

5.2.17.2 Worked example: CU triaxial on embankment clay

Three consolidated-undrained specimens with pore pressure measurement (effective σ3 of 10, 20 and 40 psi) give φ' = 29.3 deg and c' = 2.78 psi with r² = 1.000. For a long-term slope check the 2.8-psi cohesion (about 400 psf) should be justified or dropped toward the fully softened value. On a 5-ft-deep slide in a dry 2H:1V slope with this friction angle, the Chapter 6.3 calculator gives a factor of safety of 1.12 with c' = 0 and 2.79 with c' = 400 psf, so the cohesion, not the friction angle, decides the answer.

Open the shear strength calculator →
Mohr-Coulomb c and φ from triaxial (σ3, σ1) or direct shear (σn, τ) results, with Mohr circles, fit quality and strength at a design normal stress.

5.2.17.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.

  • Soil Shear Strength: Mohr-Coulomb and Soil Shear Strength: The Friction Model (course notes), Shear Strength folder.Find source ↗Library entry
  • Undrained and Drained Shear Strength (notes), Geotechnical Principles folder.Find source ↗Library entry
  • Fundamentals of Geotechnical Engineering (Shear Strength folder) and Soil Mechanics Laboratory Manual.Find source ↗
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing