Plain text version
Pre-Field
- [ ] Analysis matrix completed (Table 5.2-1 adapted to project type); tests selected match analytical needs
- [ ] Laboratory subcontract awarded; accreditation scope verified per-method for all required tests
- [ ] COC forms prepared and printed; field team briefed on COC procedure
- [ ] Shelby tube size and quantity confirmed (typically 3-in. OD for ASTM D1587, withdrawn 2024)
- [ ] Shipping coolers, foam padding, and waterproof labels procured
- [ ] Rush processing option confirmed with laboratory (if project schedule requires)
- [ ] Sample retention requirements confirmed with client
Field
- [ ] Water content taken on every sample (no exceptions)
- [ ] Shelby tubes sealed within 2 hours of extraction; ends waxed
- [ ] COC form completed for each sample; signed by collector
- [ ] Samples shipped within 72 hours; COC transmitted to laboratory with shipment
- [ ] Condition at laboratory receipt confirmed (email or call from lab supervisor)
- [ ] Test assignments transmitted to laboratory with priority schedule
Laboratory Phase
- [ ] 10% duplicate testing performed per QC program (Table 5.2-2)
- [ ] SQD computed for all Shelby tube-based tests; poor quality samples flagged
- [ ] All raw data retained by laboratory (not just final results)
- [ ] Laboratory report includes technician and supervisor signatures
- [ ] Electronic data (CSV or Excel) received and checked against PDF report
- [ ] Accreditation certificate attached to laboratory report as QC document
Report Integration
- [ ] Lab data master table complete (all samples; Table 5.2-6 format)
- [ ] All design parameters sourced from lab data with traceability to sample ID and test date
- [ ] SQD flags noted in engineering properties discussion (Section 6 of GDR/FGR)
- [ ] Any test anomalies or out-of-specification results explained in report narrative
- [ ] Sample retention calendar established; laboratory notified of client retention requirements