A minimum of 10% of all tests (by test type) must be run in duplicate as a QC check. Duplicate tests are run on split halves of the same sample by the same method. Acceptable precision limits:
Table 5.2-2. Laboratory Test Precision Requirements
Test
Acceptable Duplicate Difference
Action if Exceeded
Water content (D2216)
≤ 1.0%
Repeat test on third portion
Atterberg limits (D4318)
LL ≤ 2%, PL ≤ 2%
Repeat; average of three if still outside
Modified Proctor (D1557)
γ_d,max ≤ 1.0 pcf; w_opt ≤ 1.0%
Rerun entire compaction curve
Consolidation C_c (D2435)
≤ 0.05
Flag and report; use higher value for design
UU triaxial s_u (D2850)
≤ 10% of mean
Investigate specimen preparation
CBR (D1883)
≤ 5 percentage points
Average of three specimens
5.2.5.2 Reference Standards
The laboratory must maintain certified reference standards for:
Atterberg limits: reference LL material (typical LL ≈ 30%; verified against liquid limit standard)
Proctor: reference soil with known γ_d,max ± 0.5 pcf and w_opt ± 0.5% (checked semiannually)
All raw data (loads, deformations, masses, dimensions)
Calculated results with units
Any deviations from standard method noted
Supervisor review signature
Supplemental reference
Equipment checks that most often go wrong (USACE EM 1110-2-1909)
Temperature: keep rooms used for consolidation, permeability, triaxial (especially with pore pressure) and direct shear within ± 5°F; otherwise results become erratic. EM 1110-2-1906 adds that a temperature rise during undrained shear lowers effective stress — a problem that grows with test duration.
Mechanical compaction rammers: calibrate before first use, after every 500 mold fillings, after any repair, whenever results are questionable, and after any 6-month period without calibration — separately for standard and modified effort and for each foot type. Check drop height at operating speed, not in slow operation.
Consolidometer deformation: for stiff clays and dense sands, a significant part of the measured compression can be in the apparatus and porous stones. Load a dummy setup (wet stones with filter paper, or a metal disk) through the test sequence until readings repeat within about 0.0005 in. between cycles (usually three cycles) and subtract the apparatus correction at each load. In the USACE example, apparatus deformation at 4 tsf was about 0.008 in. — not negligible for an OC clay specimen. Recalibrate each test until the correction proves stable, then semiannually or annually.
Liquid limit device: check new devices on arrival, since many do not meet specification. Check base hardness yearly by dropping a 5/16-in. steel ball from 10 in.: rebound must be 7.3–9.0 in.
Records: keep the date, who calibrated, and the devices and methods used for every calibration. Lab audits for Section 5.2.8 accreditation will ask for them.
Specimen selection matters more than test count.EM 1110-2-1906 stresses that strength, compressibility and permeability can vary severalfold within a few inches. Specimen selection therefore needs personal inspection of the samples by the laboratory and the design engineer together, not selection from boring logs alone. Its guiding principle: “one good test is not only far better than many poor tests, but is also less expensive.” Undisturbed samples should not be stored for long periods, because physical and chemical changes eventually invalidate them.
Source: U.S. Army Corps of Engineers (1970, with changes through 1986). Calibration of Laboratory Soils Testing Equipment. EM 1110-2-1909 · U.S. Army Corps of Engineers (1970, with changes). Laboratory Soils Testing. EM 1110-2-1906