Laboratory and field test results in this manual cite ASTM standard numbers. This table lists every active standard published in ASTM Volumes 04.08 and 04.09 (Soil and Rock) as of the 2010 subject index, grouped by purpose, so a test name in a proposal, a lab report or a specification can be matched to its designation. The 55 standards marked ★ are the ones used most often in railroad geotechnical work. Standards are revised on a five-year cycle and some have been replaced since 2010 (for example, D422 by D6913 and D7928, and D2938, D2664 and others by D7012), so confirm the current edition at astm.org before citing one in a scope or specification.
| Designation | Edition | Title | Vol. |
|---|---|---|---|
| Classification and index properties (33) | |||
| D422 ★ | 63(2007) | Test Method for Particle-Size Analysis of Soils | 04.08 |
| D425 | 88(2008) | Test Method for Centrifuge Moisture Equivalent of Soils | 04.08 |
| D854 ★ | 06ε1 | Test Methods for Specific Gravity of Soil Solids by Water Pycnometer | 04.08 |
| D1140 ★ | 00(2006) | Test Methods for Amount of Material in Soils Finer than No. 200 (75-µm) Sieve | 04.08 |
| D2487 ★ | 06ε1 | Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System) | 04.08 |
| D2488 ★ | 09a | Practice for Description and Identification of Soils (Visual-Manual Procedure) | 04.08 |
| D2974 ★ | 07a | Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils | 04.08 |
| D2976 ★ | 71(2004) | Test Method for pH of Peat Materials | 04.08 |
| D2977 | 03 | Test Method for Particle Size Range of Peat Materials for Horticultural Purposes | 04.08 |
| D2978 | 03 | Test Method for Volume of Processed Peat Materials | 04.08 |
| D2980 | 04 | Test Method for Volume Mass, Moisture-Holding Capacity, and Porocity of Saturated Peat Materials | 04.08 |
| D3282 | 09 | Practice for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes | 04.08 |
| D4221 | 99(2005) | Test Method for Dispersive Characteristics of Clay Soil by Double Hydrometer | 04.08 |
| D4318 ★ | 05 | Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils | 04.08 |
| D4544 | 86(2008) | Practice for Estimating Peat Deposit Thickness | 04.08 |
| D4643 | 08 | Test Method for Determination of Water (Moisture) Content of Soil by Microwave Oven Heating | 04.08 |
| D4647 | 06ε1 | Test Method for Identification and Classification of Dispersive Clay Soils by the Pinhole Test | 04.08 |
| D4943 | 08 | Test Method for Shrinkage Factors of Soils by the Wax Method | 04.08 |
| D4944 | 04 | Test Method for Field Determination of Water (Moisture) Content of Soil by the Calcium Carbide Gas Pressure Tester | 04.08 |
| D4959 | 07 | Test Method for Determination of Water (Moisture) Content of Soil By Direct Heating | 04.08 |
| D4972 ★ | 01(2007) | Test Method for pH of Soils | 04.08 |
| D5239 | 04 | Practice for Characterizing Fly Ash for Use in Soil Stabilization | 04.08 |
| D5519 ★ | 07 | Test Methods for Particle Size Analysis of Natural and Man-Made Riprap Materials | 04.08 |
| D5550 | 06 | Test Method for Specific Gravity of Soil Solids by Gas Pycnometer | 04.08 |
| D5715 | 00(2006) | Test Method for Estimating the Degree of Humification of Peat and Other Organic Soils (Visual/Manual Method) | 04.08 |
| D5720 | 95(2009) | Practice for Static Calibration of Electronic Transducer-Based Pressure Measurement Systems for Geotechnical Purposes | 04.08 |
| D5852 | 00(2007) | Test Method for Erodibility Determination of Soil in the Field or in the Laboratory by the Jet Index Method | 04.08 |
| D6026 | 06 | Practice for Using Significant Digits in Geotechnical Data | 04.09 |
| D6027 | 96(2004) | Practice for Calibrating Linear Displacement Transducers for Geotechnical Purposes | 04.09 |
| D6276 | 99a(2006)ε1 | Test Method for Using pH to Estimate the Soil-Lime Proportion Requirement for Soil Stabilization | 04.09 |
| D6565 | 00(2005) | Test Method for Determination of Water (Moisture) Content of Soil by the Time-Domain Reflectometry (TDR) Method | 04.09 |
| D6572 | 06 | Test Methods for Determining Dispersive Characteristics of Clayey Soils by the Crumb Test | 04.09 |
| D6913 ★ | 04(2009) | Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis | 04.09 |
| Compaction, density and field control (28) | |||
| D558 | 04 | Test Methods for Moisture-Density (Unit Weight) Relations of Soil-Cement Mixtures | 04.08 |
| D559 | 03 | Test Methods for Wetting and Drying Compacted Soil-Cement Mixtures | 04.08 |
| D560 | 03 | Test Methods for Freezing and Thawing Compacted Soil-Cement Mixtures | 04.08 |
| D698 ★ | 07ε1 | Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)) | 04.08 |
| D1556 ★ | 07 | Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method | 04.08 |
| D1557 ★ | 09 | Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)) | 04.08 |
| D1883 | 07ε2 | Test Method for CBR (California Bearing Ratio) of Laboratory- Compacted Soils | 04.08 |
| D2167 | 08 | Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method | 04.08 |
| D2168 | 02a | Test Methods for Calibration of Laboratory Mechanical-Rammer Soil Compactors | 04.08 |
| D2844 ★ | 07 | Test Method for Resistance R-Value and Expansion Pressure of Compacted Soils | 04.08 |
| D2937 ★ | 04 | Test Method for Density of Soil in Place by the Drive-Cylinder Method | 04.08 |
| D4253 ★ | 00(2006) | Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table | 04.08 |
| D4254 ★ | 00(2006)ε1 | Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density | 04.08 |
| D4380 | 84(2006) | Test Method for Density of Bentonitic Slurries | 04.08 |
| D4531 | 86(2008) | Test Methods for Bulk Density of Peat and Peat Products | 04.08 |
| D4564 | 08 | Test Method for Density and Unit Weight of Soil in Place by the Sleeve Method | 04.08 |
| D4718 | 87(2007) | Practice for Correction of Unit Weight and Water Content for Soils Containing Oversize Particles | 04.08 |
| D5080 | 08 | Test Method for Rapid Determination of Percent Compaction | 04.08 |
| D5102 | 09 | Test Methods for Unconfined Compressive Strength of Compacted Soil-Lime Mixtures | 04.08 |
| D5856 | 95(2007) | Test Method for Measurement of Hydraulic Conductivity of Porous Material Using a Rigid-Wall, Compaction-Mold Permeameter | 04.08 |
| D6023 | 07 | Test Method for Density (Unit Weight), Yield, Cement Content, and Air Content (Gravimetric) of Controlled Low-Strength Material (CLSM) | 04.09 |
| D6035 | 08 | Test Method for Determining the Effect of Freeze-Thaw on Hydraulic Conductivity of Compacted or Intact Soil Specimens Using a Flexible Wall Permeameter | 04.09 |
| D6683 | 08 | Test Method for Measuring Bulk Density Values of Powders and Other Bulk Solids as Function of Compressive Stress | 04.09 |
| D6780 | 05 | Test Method for Water Content and Density of Soil in Place by Time Domain Reflectometry (TDR) | 04.09 |
| D6938 ★ | 08a | Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) | 04.09 |
| D7013 | 04 | Guide for Nuclear Surface Moisture and Density Gauge Calibration Facility Setup | 04.09 |
| D7263 | 09 | Test Methods for Laboratory Determination of Density (Unit Weight) of Soil Specimens | 04.09 |
| D7382 | 08 | Test Methods for Determination of Maximum Dry Unit Weight and Water Content Range for Effective Compaction of Granular Soils Using a Vibrating Hammer | 04.09 |
| Strength and deformation (21) | |||
| D1633 | 00(2007) | Test Methods for Compressive Strength of Molded Soil-Cement Cylinders | 04.08 |
| D1634 | 00(2006) | Test Method for Compressive Strength of Soil-Cement Using Portions of Beams Broken in Flexure (Modified Cube Method) | 04.08 |
| D2166 ★ | 06 | Test Method for Unconfined Compressive Strength of Cohesive Soil | 04.08 |
| D2850 ★ | 03a(2007) | Test Method for Unconsolidated-Undrained Triaxial Compression Test on Cohesive Soils | 04.08 |
| D3080 ★ | 04 | Test Method for Direct Shear Test of Soils Under Consolidated Drained Conditions | 04.08 |
| D3999 | 91(2003) | Test Methods for the Determination of the Modulus and Damping Properties of Soils Using the Cyclic Triaxial Apparatus | 04.08 |
| D4015 | 07 | Test Methods for Modulus and Damping of Soils by Resonant- Column Method | 04.08 |
| D4219 | 08 | Test Method for Unconfined Compressive Strength Index of Chemical-Grouted Soils | 04.08 |
| D4429 ★ | 09a | Test Method for CBR California Bearing Ratio of Soils in Place __ | 04.08 |
| D4729 | 08 | Test Method for In Situ Stress and Modulus of Deformation Using Flatjack Method | 04.08 |
| D4767 ★ | 04 | Test Method for Consolidated Undrained Triaxial Compression Test for Cohesive Soils | 04.08 |
| D5202 | 08 | Test Method for Determining Triaxial Compression Creep Strength of Chemical Grouted Soils | 04.08 |
| D5311 | 92(2004)ε1 | Test Method for Load Controlled Cyclic Triaxial Strength of Soil | 04.08 |
| D5874 | 02(2007) | Test Method for Determination of the Impact Value (IV) of a Soil | 04.08 |
| D6128 | 06 | Test Method for Shear Testing of Bulk Solids Using the Jenike Shear Cell | 04.09 |
| D6467 | 06a | Test Method for Torsional Ring Shear Test to Determine Drained Residual Shear Strength of Cohesive Soils | 04.09 |
| D6528 | 07 | Test Method for Consolidated Undrained Direct Simple Shear Testing of Cohesive Soils | 04.09 |
| D6682 | 08 | Test Method for Measuring Shear Stresses of Powders Using Peschl Rotational Split Level Shear Tester | 04.09 |
| D6758 | 08 | Test Method for Measuring Stiffness and Apparent Modulus of Soil and Soil-Aggregate In-Place by Electro-Mechanical Method | 04.09 |
| D6773 | 08 | Test Method for Bulk Solids Using Schulze Ring Shear Tester | 04.09 |
| D7207 | 05 | Test Method for Determination of Unvegetated Rolled Erosion Control Product (RECP) Ability to Protect Sand from Hydraulically-Induced Shear Stresses under Bench-Scale Conditions | 04.09 |
| Consolidation, swell and collapse (9) | |||
| D2435 ★ | 04 | Test Methods for One-Dimensional Consolidation Properties of Soils Using Incremental Loading | 04.08 |
| D3877 | 08 | Test Methods for One-Dimensional Expansion, Shrinkage, and Uplift Pressure of Soil-Lime Mixtures | 04.08 |
| D4083 | 89(2007) | Practice for Description of Frozen Soils (Visual-Manual Procedure) | 04.08 |
| D4186 | 06 | Test Method for One-Dimensional Consolidation Properties of Saturated Cohesive Soils Using Controlled-Strain Loading | 04.08 |
| D4546 ★ | 08 | Test Methods for One-Dimensional Swell or Collapse of Cohesive Soils | 04.08 |
| D4829 ★ | 08a | Test Method for Expansion Index of Soils | 04.08 |
| D5333 | 03 | Test Method for Measurement of Collapse Potential of Soils | 04.08 |
| D5918 | 06 | Test Methods for Frost Heave and Thaw Weakening Susceptibility of Soils | 04.09 |
| D7300 | 06 | Test Method for Laboratory Determination of Strength Properties of Frozen Soil at a Constant Rate of Strain | 04.09 |
| Permeability and suction (11) | |||
| D2434 ★ | 68(2006) | Test Method for Permeability of Granular Soils (Constant Head) | 04.08 |
| D4511 | 00(2006) | Test Method for Hydraulic Conductivity of Essentially Saturated Peat | 04.08 |
| D4525 | 08 | Test Method for Permeability of Rocks by Flowing Air | 04.08 |
| D4630 | 96(2008) | Test Method for Determining Transmissivity and Storage Coefficient of Low-Permeability Rocks by In Situ Measurements Using the Constant Head Injection Test | 04.08 |
| D4631 | 95(2008) | Test Method for Determining Transmissivity and Storativity of Low Permeability Rocks by In Situ Measurements Using Pressure Pulse Technique | 04.08 |
| D5084 ★ | 03 | Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter | 04.08 |
| D5298 | 03 | Test Method for Measurement of Soil Potential (Suction) Using Filter Paper | 04.08 |
| D6527 | 00(2008) | Test Method for Determining Unsaturated and Saturated Hydraulic Conductivity in Porous Media by Steady-State Centrifugation | 04.09 |
| D6836 | 02(2008)ε2 | Test Methods for Determination of the Soil Water Characteristic Curve for Desorption Using Hanging Column, Pressure Extractor, Chilled Mirror Hygrometer, or Centrifuge | 04.09 |
| D7100 | 06 | Test Method for Hydraulic Conductivity Compatibility Testing of Soils with Aqueous Solutions | 04.09 |
| D7243 | 06a | Guide for Measuring the Saturated Hydraulic Conductivity of Paper Industry Sludges | 04.09 |
| Exploration, sampling and in situ testing (47) | |||
| D420 ★ | 98(2003) | Guide to Site Characterization for Engineering Design and Construction Purposes | 04.08 |
| D421 ★ | 85(2007) | Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants | 04.08 |
| D1452 | 09 | Practice for Soil Exploration and Sampling by Auger Borings | 04.08 |
| D1558 | 99(2004)ε1 | Test Method for Moisture Content Penetration Resistance Relationships of Fine-Grained Soils | 04.08 |
| D1586 ★ | 08a | Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils | 04.08 |
| D1587 ★ | 08 | Practice for Thin-Walled Tube Sampling of Soils for Geotechnical Purposes | 04.08 |
| D1997 | 91(2008)ε1 | Test Method for Laboratory Determination of the Fiber Content of Peat Samples by Dry Mass | 04.08 |
| D2573 ★ | 08 | Test Method for Field Vane Shear Test in Cohesive Soil | 04.08 |
| D2944 | 71(2008) | Test Method of Sampling Processed Peat Materials | 04.08 |
| D3441 ★ | 05 | Test Method for Mechanical Cone Penetration Tests of Soil | 04.08 |
| D3550 | 01(2007) | Practice for Thick Wall, Ring-Lined, Split Barrel, Drive Sampling of Soils | 04.08 |
| D4220 ★ | 95(2007) | Practices for Preserving and Transporting Soil Samples | 04.08 |
| D4427 | 07 | Classification of Peat Samples by Laboratory Testing | 04.08 |
| D4452 | 06 | Practice for X-Ray Radiography of Soil Samples | 04.08 |
| D4633 ★ | 10 | Test Method for Energy Measurement for Dynamic Penetrometers | 04.08 |
| D4648 | 05 | Test Method for Laboratory Miniature Vane Shear Test for Saturated Fine-Grained Clayey Soil | 04.08 |
| D4719 ★ | 07 | Test Methods for Prebored Pressuremeter Testing in Soils | 04.08 |
| D5520 | 94(2006)ε1 | Test Method for Laboratory Determination of Creep Properties of Frozen Soil Samples by Uniaxial Compression | 04.08 |
| D5714 | 95(2002) | Specification for Content of Digital Geospatial Metadata | 04.08 |
| D5778 ★ | 07 | Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils | 04.08 |
| D5781 | 95(2006) | Guide for Use of Dual-Wall Reverse-Circulation Drilling for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5782 | 95(2006) | Guide for Use of Direct Air-Rotary Drilling for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5783 | 95(2006) | Guide for Use of Direct Rotary Drilling with Water-Based Drilling Fluid for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5784 | 95(2006) | Guide for Use of Hollow-Stem Augers for Geoenvironmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5872 | 95(2006) | Guide for Use of Casing Advancement Drilling Methods for Geoenvironmental Exploration and Installation of Subsurface Water- Quality Monitoring Devices | 04.08 |
| D5875 | 95(2006) | Guide for Use of Cable-Tool Drilling and Sampling Methods for Geoenvironmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5876 | 95(2005) | Guide for Use of Direct Rotary Wireline Casing Advancement Drilling Methods for Geoenvironmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices | 04.08 |
| D5879 | 95(2003) | Practice for Surface Site Characterization for On-Site Septic Systems | 04.09 |
| D5911 | 96(2002)ε1 | Practice for Minimum Set of Data Elements to Identify a Soil Sampling Site | 04.09 |
| D5921 | 96(2003)ε1 | Practice for Subsurface Site Characterization of Test Pits for On-Site Septic Systems | 04.09 |
| D5971 | 07 | Practice for Sampling Freshly Mixed Controlled Low-Strength Material | 04.09 |
| D6066 | 96(2004) | Practice for Determining the Normalized Penetration Resistance of Sands for Evaluation of Liquefaction Potential | 04.09 |
| D6151 | 08 | Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling | 04.09 |
| D6230 ★ | 98(2005) | Test Method for Monitoring Ground Movement Using Probe-Type Inclinometers | 04.09 |
| D6236 | 98(2004) | Guide for Coring and Logging Cement - or Lime-Stabilized Soil | 04.09 |
| D6391 | 06 | Test Method for Field Measurement of Hydraulic Conductivity Limits of Porous Materials Using Two Stages of Infiltration from a Borehole | 04.09 |
| D6519 | 08 | Practice for Sampling of Soil Using the Hydraulically Operated Stationary Piston Sampler | 04.09 |
| D6598 ★ | 07 | Guide for Installing and Operating Settlement Platforms for Monitoring Vertical Deformations | 04.09 |
| D6635 ★ | 01(2007) | Test Method for Performing the Flat Plate Dilatometer | 04.09 |
| D6914 | 04ε1 | Practice for Sonic Drilling for Site Characterization and the Installation of Subsurface Monitoring Devices | 04.09 |
| D7015 | 07 | Practices for Obtaining Intact Block (Cubical and Cylindrical) Samples of Soils | 04.09 |
| D7299 | 06 | Practice for Verifying Performance of a Vertical Inclinometer Probe | 04.09 |
| D7380 | 08 | Test Method for Soil Compaction Determination at Shallow Depths Using 5-lb (2.3 kg) Dynamic Cone Penetrometer | 04.09 |
| D7384 | 09 | Practice for Minimum Geospatial Data for a Surface Coal Mining Permit Boundary | 04.09 |
| D7443 | 09 | Practice for Minimum Geospatial Data for Underground Coal Mining Extents | 04.09 |
| D7533/D7533M | 09 | Practice for Minimum Geospatial Data for Abandoned Mine Land Problem Area | 04.09 |
| D7534/D7534M | 09 | Practice for Minimum Geospatial Data for Abandoned Mine Land Planning Unit | 04.09 |
| Geophysical methods (16) | |||
| D4428/D4428M ★ | 07 | Test Methods for Crosshole Seismic Testing | 04.08 |
| D5753 | 05 | Guide for Planning and Conducting Borehole Geophysical Logging | 04.08 |
| D5777 ★ | 00(2006) | Guide for Using the Seismic Refraction Method for Subsurface Investigation | 04.08 |
| D6167 | 97(2004) | Guide for Conducting Borehole Geophysical Logging: Mechanical Caliper | 04.09 |
| D6274 | 98(2004) | Guide for Conducting Borehole Geophysical Logging - Gamma | 04.09 |
| D6429 | 99(2006) | Guide for Selecting Surface Geophysical Methods | 04.09 |
| D6430 | 99(2005) | Guide for Using the Gravity Method for Subsurface Investigation | 04.09 |
| D6431 | 99(2005) | Guide for Using the Direct Current Resistivity Method for Subsurface Investigation | 04.09 |
| D6432 | 99(2005) | Guide for Using the Surface Ground Penetrating Radar Method for Subsurface Investigation | 04.09 |
| D6639 | 01(2008) | Guide for Using the Frequency Domain Electromagnetic Method for Subsurface Investigations | 04.09 |
| D6726 | 01(2007) | Guide for Conducting Borehole Geophysical Logging— Electromagnetic Induction | 04.09 |
| D6727 | 01(2007) | Guide for Conducting Borehole Geophysical Logging— Neutron | 04.09 |
| D6820 | 20 | Guide for Use of the Time Domain Electromagnetic Method for Subsurface Investigation | 04.09 |
| D7046 | 04 | Guide for Use of the Metal Detection Method for Subsurface Investigation | 04.09 |
| D7128 | 05 | Guide for Using the Seismic-Reflection Method for Shallow Subsurface Investigation | 04.09 |
| D7400 | 08 | Test Methods for Downhole Seismic Testing | 04.09 |
| Rock (56) | |||
| D653 | 09 | Terminology Relating to Soil, Rock, and Contained Fluids | 04.08 |
| D1635 | 00(2006) | Test Method for Flexural Strength of Soil-Cement Using Simple Beam with Third-Point Loading | 04.08 |
| D2113 ★ | 08 | Practice for Rock Core Drilling and Sampling of Rock for Site Investigation | 04.08 |
| D2216 ★ | 05 | Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass | 04.08 |
| D2845 | 08 | Test Method for Laboratory Determination of Pulse Velocities and Ultrasonic Elastic Constants of Rock | 04.08 |
| D2936 | 08 | Test Method for Direct Tensile Strength of Intact Rock Core Specimens | 04.08 |
| D3740 | 08 | Practice for Minimum Requirements for Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction | 04.08 |
| D3967 | 08 | Test Method for Splitting Tensile Strength of Intact Rock Core Specimens | 04.08 |
| D4394 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Rigid Plate Loading Method | 04.08 |
| D4395 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Flexible Plate Loading Method | 04.08 |
| D4403 | 84(2005) | Practice for Extensometers Used in Rock | 04.08 |
| D4404 | 84(2004) | Test Method for Determination of Pore Volume and Pore Volume Distribution of Soil and Rock by Mercury Intrusion Porosimetry | 04.08 |
| D4436 | 08 | Test Method for Rock Bolt Long-Term Load Retention Test | 04.08 |
| D4506 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Mass Using Radial Jacking Test | 04.08 |
| D4535 | 08 | Test Methods for Measurement of Thermal Expansion of Rock Using Dilatometer | 04.08 |
| D4543 | 08 | Practices for Preparing Rock Core as Cylindrical Test Specimens and Verifying Conformance to Dimensional and Shape Tolerances | 04.08 |
| D4553 | 08 | Test Method for Determining In Situ Creep Characteristics of Rock | 04.08 |
| D4554 | 02(2006) | Test Method for In Situ Determination of Direct Shear Strength of Rock Discontinuities | 04.08 |
| D4555 | 01(2005) | Test Method for Determining Deformability and Strength of Weak Rock by an In Situ Uniaxial Compressive Test | 04.08 |
| D4611 | 08 | Test Method for Specific Heat of Rock and Soil | 04.08 |
| D4623 | 08 | Test Method for Determination of In Situ Stress in Rock Mass by Overcoring Method—USBM Borehole Deformation Gauge | 04.08 |
| D4644 | 08 | Test Method for Slake Durability of Shales and Similar Weak Rocks | 04.08 |
| D4645 | 08 | Test Method for Determination of In-Situ Stress in Rock Using Hydraulic Fracturing Method | 04.08 |
| D4753 | 07 | Guide for Evaluating, Selecting, and Specifying Balances and Standard Masses for Use in Soil, Rock, and Construction Materials Testing | 04.08 |
| D4879 | 08 | Guide for Geotechnical Mapping of Large Underground Openings in Rock | 04.08 |
| D4914 | 08 | Test Methods for Density and Unit Weight of Soil and Rock in Place by the Sand Replacement Method in a Test Pit | 04.08 |
| D4971 | 08 | Test Method for Determining In Situ Modulus of Deformation of Rock Using Diametrically Loaded 76-mm (3-in.) Borehole Jack | 04.08 |
| D4992 | 07 | Practice for Evaluation of Rock to be Used for Erosion Control | 04.08 |
| D5030 | 04 | Test Method for Density of Soil and Rock in Place by the Water Replacement Method in a Test Pit | 04.08 |
| D5079 | 08 | Practices for Preserving and Transporting Rock Core Samples | 04.08 |
| D5121 | 06 | Practice for Preparation of Rock Slabs for Durability Testing | 04.08 |
| D5195 | 08 | Test Method for Density of Soil and Rock In-Place at Depths Below Surface by Nuclear Methods | 04.08 |
| D5220 | 08 | Test Method for Water Mass per Unit Volume of Soil and Rock In-Place by the Neutron Depth Probe Method | 04.08 |
| D5240 | 04 | Test Method for Testing Rock Slabs to Evaluate Soundness of Riprap by Use of Sodium Sulfate or Magnesium Sulfate | 04.08 |
| D5255 | 01(2008) | Practice for Certification of Personnel Engaged in the Testing of Soil and Rock | 04.08 |
| D5312 | 04 | Test Method for Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions | 04.08 |
| D5313 | 04 | Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions | 04.08 |
| D5334 | 08 | Test Method for Determination of Thermal Conductivity of Soil and Soft Rock by Thermal Needle Probe Procedure | 04.08 |
| D5335 | 08 | Test Method for Linear Coefficient of Thermal Expansion of Rock Using Bonded Electric Resistance Strain Gauges | 04.08 |
| D5434 | 09 | Guide for Field Logging of Subsurface Explorations of Soil and Rock | 04.08 |
| D5607 | 08 | Test Method for Performing Laboratory Direct Shear Strength Tests of Rock Specimens Under Constant Normal Force | 04.08 |
| D5730 | 04 | Guide for Site Characterization for Environmental Purposes With Emphasis on Soil, Rock, the Vadose Zone and Ground Water | 04.08 |
| D5731 ★ | 08 | Test Method for Determination of the Point Load Strength Index of Rock and Application to Rock Strength Classifications | 04.08 |
| D5779 | 08 | Test Method for Field Determination of Apparent Specific Gravity of Rock and Manmade Materials for Erosion Control | 04.08 |
| D5873 | 05 | Test Method for Determination of Rock Hardness by Rebound Hammer Method | 04.08 |
| D5878 | 08 | Guide for Using Rock-Mass Classification Systems for Engineering Purposes | 04.09 |
| D5883 | 96(2008) | Guide for Use of Rotary Kiln Produced Expanded Shale, Clay or Slate (ESCS) as a Mineral Amendment in Topsoil Used for Landscaping and Related Purposes | 04.09 |
| D6031 | 96(2004) | Test Method for Logging In Situ Moisture Content and Density of Soil and Rock by the Nuclear Method in Horizontal, Slanted, and Vertical Access Tubes | 04.09 |
| D6032 ★ | 08 | Test Method for Determining Rock Quality Designation (RQD) of Rock Core | 04.09 |
| D6168 | 97(2004) | Guide for Selection of Minimum Set of Data Elements Required to Identify Locations Chosen for Field Collection of Information to Describe Soil, Rock, and Their Contained Fluids | 04.09 |
| D6169 | 98(2005) | Guide for Selection of Soil and Rock Sampling Devices Used With Drill Rigs for Environmental Investigations | 04.09 |
| D6473 | 99(2005) | Test Method For Specific Gravity And Absorption of Rock For Erosion Control | 04.09 |
| D6711 | 01(2008) | Practice for Specifying Rock to Fill Gabions, Revet Mattresses, and Gabion Mattresses | 04.09 |
| D7070 | 08 | Test Methods for Creep of Rock Core Under Constant Stress and Temperature | 04.09 |
| D7099 | 04 | Terminology Relating to Frozen Soil and Rock | 04.09 |
| D7458 | 08 | Test Method for Determination of Beryllium in Soil, Rock, Sediment, and Fly Ash Using Ammonium Bifluoride Extraction and Fluorescence Detection | 04.09 |
| Deep foundations and anchors (10) | |||
| D1143/D1143M ★ | 07ε1 | Test Methods for Deep Foundations Under Static Axial Compressive Load | 04.08 |
| D3689 ★ | 07 | Test Methods for Deep Foundations Under Static Axial Tensile Load | 04.08 |
| D3966 | 07 | Test Methods for Deep Foundations Under Lateral Load | 04.08 |
| D4435 | 08 | Test Method for Rock Bolt Anchor Pull Test | 04.08 |
| D4945 ★ | 08 | Test Method for High-Strain Dynamic Testing of Deep Foundations | 04.08 |
| D5780 | 95(2002) | Test Methods for Individual Piles in Permafrost Under Static Axial Compressive Load | 04.08 |
| D5882 ★ | 07 | Test Method for Low Strain Impact Integrity Testing of Deep Foundations | 04.09 |
| D6760 | 08 | Test Method for Integrity Testing of Concrete Deep Foundations by Ultrasonic Crosshole Testing | 04.09 |
| D7383 | 08 | Test Methods for Axial Compressive Force Pulse (Rapid) Testing of Deep Foundations | 04.09 |
| D7401 | 08 | Test Methods for Laboratory Determination of Rock Anchor Capacities by Pull and Drop Tests | 04.09 |
| Stabilization, soil-cement and CLSM (14) | |||
| D806 | 00(2006) | Test Method for Cement Content of Hardened Soil-Cement Mixtures | 04.08 |
| D1632 | 07 | Practice for Making and Curing Soil-Cement Compression and Flexure Test Specimens in the Laboratory | 04.08 |
| D3155 | 98(2006) | Test Method for Lime Content of Uncured Soil-Lime Mixtures | 04.08 |
| D3551 | 08 | Practice for Laboratory Preparation of Soil-Lime Mixtures Using Mechanical Mixer | 04.08 |
| D4016 | 08 | Test Method for Viscosity of Chemical Grouts by Brookfield Viscometer (Laboratory Method) | 04.08 |
| D4223 | 99(2006) | Practice for Preparation of Test Specimens of Asphalt- Stabilized Soils | 04.08 |
| D4320/D4320M | 09 | Practice for Laboratory Preparation of Chemically Grouted Soil Specimens for Obtaining Engineering Parameters | 04.08 |
| D4381 | 06 | Test Method for Sand Content by Volume of Bentonitic Slurries | 04.08 |
| D4609 | 08 | Guide for Evaluating Effectiveness of Admixtures for Soil Stabilization | 04.08 |
| D4832 | 02 | Test Method for Preparation and Testing of Controlled Low Strength Material (CLSM) Test Cylinders | 04.08 |
| D5982 | 07 | Test Method for Determining Cement Content of Fresh Soil-Cement (Heat of Neutralization Method) | 04.09 |
| D6024 | 07 | Test Method for Ball Drop on Controlled Low Strength Material (CLSM) to Determine Suitability for Load Application | 04.09 |
| D6103 | 04 | Test Method for Flow Consistency of Controlled Low Strength Material (CLSM) | 04.09 |
| D6910/D6910M | 09 | Test Method for Marsh Funnel Viscosity of Clay Construction Slurries | 04.09 |
| Erosion control, riprap and revetments (23) | |||
| D5268 | 07 | Specification for Topsoil Used for Landscaping Purposes | 04.08 |
| D5539 | 94(2008) | Specification for Seed Starter Mix | 04.08 |
| D6092 ★ | 97(2008) | Practice for Specifying Standard Sizes of Stone for Erosion Control | 04.09 |
| D6449 | 99(2008) | Test Method for Flow of Fine Aggregate Concrete for Fabric Formed Concrete (Flow Cone Method) | 04.09 |
| D6459 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Performance in Protecting Hillslopes from Rainfall-Induced Erosion | 04.09 |
| D6460 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Performance in Protecting Earthen Channels from Stormwater- Induced Erosion | 04.09 |
| D6461 | 99(2007)ε2 | Specification for Silt Fence Materials | 04.09 |
| D6462 | 03(2008) | Practice for Silt Fence Installation | 04.09 |
| D6475 | 06 | Test Method for Measuring Mass Per Unit Area of Erosion Control Blankets | 04.09 |
| D6599 | 00(2008) | Practice for Construction of Live Fascines on Slopes | 04.09 |
| D6629 | 01(2007) | Guide for Selection of Methods for Estimating Soil Loss by Erosion | 04.09 |
| D6684 | 04 | Specification for Materials and Manufacture of Articulating Concrete Block (ACB) Revetment Systems | 04.09 |
| D6685 | 01(2008) | Guide for the Selection of Test Methods for Fabrics Used for Fabric Formed Concrete (FFC) | 04.09 |
| D6765 | 02(2008) | Practice for Live Staking | 04.09 |
| D6825 ★ | 02(2008)ε1 | Guide for Placement of Riprap Revetments | 04.09 |
| D6884 | 03 | Practice for Installation of Articulating Concrete Block (ACB) Revetment Systems | 04.09 |
| D6939 | 03 | Practice for Brushmattressing | 04.09 |
| D7014 | 04 | Practice for Assembly and Placement of Double-Twisted Wire Mesh Gabions and Revet Mattresses | 04.09 |
| D7047 | 04 | Test Method for Mucilloid Content of Plantago Insularis (Ovata, Psyllium) Used as a Tackifiers | 04.09 |
| D7101 | 08 | Index Test Method for Determination of Unvegetated Rolled Erosion Control Product (RECP) Ability to Protect Soil from Rain Splash and Associated Runoff Under Bench-Scale Conditions | 04.09 |
| D7208 | 06 | Test Method for Determination of Temporary Ditch Check Performance in Protecting Earthen Channels from Stormwater-Induced Erosion | 04.09 |
| D7276 | 08 | Guide for Analysis and Interpretation of Test Data for Articulating Concrete Block (ACB) Revetment Systems in Open Channel Flow | 04.09 |
| D7277 | 08 | Test Method for Performance Testing of Articulating Concrete Block (ACB) Revetment Systems for Hydraulic Stability in Open Channel Flow | 04.09 |
| Chemical and corrosion (2) | |||
| D1411 | 09 | Test Methods for Water-Soluble Chlorides Present as Admixtures in Graded Aggregate Road Mixes | 04.08 |
| D4373 | 02(2007) | Test Method for Rapid Determination of Carbonate Content of Soils | 04.08 |
| Groundwater, wells and environmental (95) | |||
| D3385 | 09 | Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer | 04.08 |
| D3404 | 91(2004) | Guide for Measuring Matric Potential in Vadose Zone Using Tensiometers | 04.08 |
| D4043 | 96(2004) | Guide for Selection of Aquifer Test Method in Determining Hydraulic Properties by Well Techniques | 04.08 |
| D4044 | 96(2008) | Test Method for (Field Procedure) for Instantaneous Change in Head (Slug) Tests for Determining Hydraulic Properties of Aquifers | 04.08 |
| D4050 | 96(2008) | Test Method for (Field Procedure) for Withdrawal and Injection Well Tests for Determining Hydraulic Properties of Aquifer Systems | 04.08 |
| D4104 | 96(2004) | Test Method (Analytical Procedure) for Determining Transmissivity of Nonleaky Confined Aquifers by Overdamped Well Response to Instantaneous Change in Head (Slug Tests) | 04.08 |
| D4105 | 96(2008) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Nonleaky Confined Aquifers by the Modified Theis Nonequilibrium Method | 04.08 |
| D4106 | 96(2008) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Nonleaky Confined Aquifers by the Theis Nonequilibrium Method | 04.08 |
| D4542 ★ | 07 | Test Method for Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer | 04.08 |
| D4696 | 92(2008) | Guide for Pore-Liquid Sampling from the Vadose Zone | 04.08 |
| D4700 | 91(2006) | Guide for Soil Sampling from the Vadose Zone | 04.08 |
| D4750 | 87(2001) | Test Method for Determining Subsurface Liquid Levels in a Borehole or Monitoring Well (Observation Well) | 04.08 |
| D5088 | 02(2008) | Practice for Decontamination of Field Equipment Used at Waste Sites | 04.08 |
| D5092 | 04ε1 | Practice for Design and Installation of Ground Water Monitoring Wells | 04.08 |
| D5093 | 02(2008) | Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring | 04.08 |
| D5126 | 90(2004) | Guide for Comparison of Field Methods for Determining Hydraulic Conductivity in Vadose Zone | 04.08 |
| D5143 | 06 | Test Method for Analysis of Nitroaromatic and Nitramine Explosive in Soil by High Performance Liquid Chromatography | 04.08 |
| D5254 | 92(2004) | Practice for Minimum Set of Data Elements to Identify a Ground-Water Site | 04.08 |
| D5269 | 96(2008) | Test Method for Determining Transmissivity of Nonleaky Confined Aquifers by the Theis Recovery Method | 04.08 |
| D5270 | 96(2008) | Test Method for Determining Transmissivity and Storage Coefficient of Bounded, Nonleaky, Confined Aquifers | 04.08 |
| D5299 | 99(2005) | Guide for Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities | 04.08 |
| D5314 | 92(2006) | Guide for Soil Gas Monitoring in the Vadose Zone | 04.08 |
| D5408 | 93(2004) | Guide for Set of Data Elements to Describe a Ground-Water Site; Part One—Additional Identification Descriptors | 04.08 |
| D5409 | 93(2004) | Guide for Set of Data Elements to Describe a Ground-Water Site; Part Two—Physical Descriptors | 04.08 |
| D5410 | 93(2007) | Guide for Set of Data Elements to Describe a Ground-Water Site;Part Three—Usage Descriptors | 04.08 |
| D5435 | 03(2008) | Test Method for Diagnostic Soil Test for Plant Growth and Food Chain Protection | 04.08 |
| D5447 | 04 | Guide for Application of a Ground-Water Flow Model to a Site-Specific Problem | 04.08 |
| D5472 | 93(2005) | Test Method for Determining Specific Capacity and Estimating Transmissivity at the Control Well | 04.08 |
| D5473 | 93(2006) | Test Method for (Analytical Procedure for) Analyzing the Effects of Partial Penetration of Control Well and Determining the Horizontal and Vertical Hydraulic Conductivity in a Nonleaky Confined Aquifer | 04.08 |
| D5474 | 93(2006) | Guide for Selection of Data Elements for Ground-Water Investigations | 04.08 |
| D5490 | 93(2008) | Guide for Comparing Ground-Water Flow Model Simulations to Site-Specific Information | 04.08 |
| D5521 | 05 | Guide for Development of Ground-Water Monitoring Wells in Granular Aquifers | 04.08 |
| D5608 | 01(2006) | Practices for Decontamination of Field Equipment Used at Low Level Radioactive Waste Sites | 04.08 |
| D5609 | 94(2008) | Guide for Defining Boundary Conditions in Ground-Water Flow Modeling | 04.08 |
| D5610 | 94(2008) | Guide for Defining Initial Conditions in Ground-Water Flow Modeling | 04.08 |
| D5611 | 94(2008) | Guide for Conducting a Sensitivity Analysis for a Ground- Water Flow Model Application | 04.08 |
| D5716 | 95(2006) | Test Method for Measuring the Rate of Well Discharge by Circular Orifice Weir | 04.08 |
| D5718 | 95(2006) | Guide for Documenting a Ground-Water Flow Model Application | 04.08 |
| D5719 | 95(2006) | Guide for Simulation of Subsurface Airflow Using Ground-Water Flow Modeling Codes | 04.08 |
| D5737 | 95(2006) | Guide for Methods for Measuring Well Discharge | 04.08 |
| D5738 | 95(2006) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Diagrams for Single Analyses | 04.08 |
| D5754 | 95(2006) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Trilinear Diagrams for Two or More Analyses | 04.08 |
| D5785 | 95(2006) | Test Method for (Analytical Procedure) for Determining Transmissivity of Confined Nonleaky Aquifers by Underdamped Well Response to Instantaneous Change in Head (Slug Test) | 04.08 |
| D5786 | 95(2006) | Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems | 04.08 |
| D5787 | 95(2009) | Practice for Monitoring Well Protection | 04.08 |
| D5850 | 95(2006) | Test Method for (Analytical Procedure) Determining Transmissivity, Storage Coefficient, and Anisotropy Ratio from a Network of Partially Penetrating Wells | 04.08 |
| D5855 | 95(2006) | Test Method for (Analytical Procedure) for Determining Transmissivity and Storage Coefficient of Confined Nonleaky or Leaky Aquifer by Constant Drawdown Method in Flowing Well | 04.08 |
| D5877 | 95(2005) | Guide for Displaying Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Diagrams Based on Data Analytical Calculations | 04.09 |
| D5881 | 95(2005) | Test Method for (Analytical Procedure) Determining Transmissivity of Confined Nonleaky Aquifers by Critically Damped Well Response to Instantaneous Change in Head (Slug) | 04.09 |
| D5903 | 96(2006) | Guide for Planning and Preparing for a Groundwater Sampling Event | 04.09 |
| D5912 | 96(2004) | Test Method for (Analytical Procedure) Determining Hydraulic Conductivity of an Unconfined Aquifer by Overdamped Well Response to Instantaneous Change in Head (Slug) | 04.09 |
| D5920 | 96(2005) | Test Method (Analytical Procedure) for Tests of Anisotropic Unconfined Aquifers by Neuman Method | 04.09 |
| D5922 | 96(2004) | Guide for Analysis of Spatial Variation in Geostatistical Site Investigations | 04.09 |
| D5923 | 96(2004) | Guide for Selection of Kriging Methods in Geostatistical Site Investigations | 04.09 |
| D5978 | 96(2005) | Guide for Maintenance and Rehabilitation of Ground-Water Monitoring Wells | 04.09 |
| D5979 | 96(2008) | Guide for Conceptualization and Characterization of Ground-Water Systems | 04.09 |
| D5980 | 96(2004) | Guide for Selection and Documentation of Existing Wells for Use in Environmental Site Characterization and Monitoring | 04.09 |
| D5981 | 96(2008) | Guide for Calibrating a Ground-Water Flow Model Application | 04.09 |
| D5995 | 98(2004) | Guide for Environmental Site Characterization in Cold Regions | 04.09 |
| D6000 | 96(2008) | Guide for Presentation of Water-Level Information from Ground-Water Sites | 04.09 |
| D6001 | 05 | Guide for Direct-Push Ground Water Sampling for Environmental Site Characterization | 04.09 |
| D6025 | 96(2008) | Guide for Developing and Evaluating Ground-Water Modeling Codes | 04.09 |
| D6028 | 96(2004) | Test Method (Analytical Procedure) for Determining Hydraulic Properties of a Confined Aquifer Taking into Consideration Storage of Water in Leaky Confining Beds by Modified Hantush Method | 04.09 |
| D6029 | 96(2004) | Test Method (Analytical Procedure) for Determining Hydraulic Properties of a Confined Aquifer and a Leaky Confining Bed with Negligible Storage by the Hantush-Jacob Method | 04.09 |
| D6030 | 96(2008) | Guide for Selection of Methods for Assessing Ground Water or Aquifer Sensitivity and Vulnerability | 04.09 |
| D6033 | 96(2008) | Guide for Describing the Functionality of a Ground-Water Modeling Code | 04.09 |
| D6034 | 96(2004) | Test Method (Analytical Procedure) for Determining the Efficiency of a Production Well in a Confined Aquifer from a Constant Rate Pumping Test | 04.09 |
| D6036 | 96(2008) | Guide for Displaying the Results of Chemical Analyses of Ground Water for Major Ions and Trace Elements—Use of Maps | 04.09 |
| D6067 | 96(2003) | Guide for Using the Electronic Cone Penetrometer for Environmental Site Characterization | 04.09 |
| D6089 | 97(2003) | Guide for Documenting a Ground-Water Sampling Event | 04.09 |
| D6106 | 97(2004) | Guide for Establishing Nomenclature of Ground-Water Aquifers | 04.09 |
| D6170 | 97(2004) | Guide for Selecting a Ground-Water Modeling Code | 04.09 |
| D6171 | 97(2004) | Guide for Documenting a Ground-Water Modeling Code | 04.09 |
| D6187 | 97(2003) | Practice for Cone Penetrometer Technology Characterization of Petroleum Contaminated Sites with Nitrogen Laser-Induced Fluorescence | 04.09 |
| D6235 | 04 | Practice for Expedited Site Characterization of Vadose Zone and Ground Water Contamination at Hazardous Waste Contaminated Sites | 04.09 |
| D6282 | 98(2005) | Guide for Direct Push Soil Sampling for Environmental Site Characterizations | 04.09 |
| D6285 | 99(2005) | Guide for Locating Abandoned Wells | 04.09 |
| D6286 | 98(2006) | Guide for Selection of Drilling Methods for Environmental Site Characterization | 04.09 |
| D6312 | 98(2005) | Guide for Developing Appropriate Statistical Approaches for Ground-Water Detection Monitoring Programs | 04.09 |
| D6452 | 99(2005) | Guide for Purging Methods for Wells Used for Ground-Water Quality Investigations | 04.09 |
| D6517 | 00(2005) | Guide for Field Preservation of Ground-Water Samples | 04.09 |
| D6564 | 00(2005) | Guide for Field Filtration of Ground-Water Samples | 04.09 |
| D6634 | 01(2006) | Guide for the Selection of Purging and Sampling Devices for Ground-Water Monitoring Wells | 04.09 |
| D6642 | 01(2006) | Guide for Comparison of Techniques to Quantify the Soil-Water (Moisture) Flux | 04.09 |
| D6724 | 04 | Guide for Installation of Direct Push Ground Water Monitoring Wells | 04.09 |
| D6725 | 04 | Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers | 04.09 |
| D6771 | 02 | Practice for Low-Flow Purging and Sampling for Wells and Devices Used for Ground-Water Quality Investigations | 04.09 |
| D6911 | 03 | Guide for Packaging and Shipping Environmental Samples for Laboratory Analysis | 04.09 |
| D7045 | 04 | Guide for Optimization of Ground Water Monitoring Constituents for Detection Monitoring Programs for RCRA Waste Disposal Facilities | 04.09 |
| D7048 | 04 | Guide for Applying Statistical Methods for Assessment and Corrective Action Environmental Monitoring Programs | 04.09 |
| D7069 | 04 | Guide for Field Quality Assurance in a Ground-water Sampling Event | 04.09 |
| D7242 | 06 | Practice for Field Pneumatic Slug (Instantaneous Change in Head) Tests to Determine Hydraulic Properties of Aquifers with Direct Push Ground Water Samplers | 04.09 |
| D7262 | 07 | Test Method for Estimating the Permanganate Natural Oxidant Demand of Soil and Aquifer Solids | 04.09 |
| D7322 | 07 | Test Method for Determination of Rolled Erosion Control Product (RECP) Ability to Encourage Seed Germination and Plant Growth Under Bench-Scale Conditions | 04.09 |
| D7352 | 07 | Practice for Direct Push Technology for Volatile Contaminant Logging with the Membrane Interface Probe (MIP) | 04.09 |
| Specifications and aggregates (5) | |||
| D1241 | 07 | Specification for Materials for Soil-Aggregate Subbase, Base, and Surface Courses | 04.08 |
| D6393 | 08 | Test Method for Bulk Solids Characterization by Carr Indices | 04.09 |
| D6940 | 04 | Practice for Measuring Sifting Segregation Tendencies of Bulk Solids | 04.09 |
| D6941 | 05ε1 | Practice for Measuring Fluidization Segregation Tendencies of Powders | 04.09 |
| D7481 | 09 | Test Methods for Determining Loose and Tapped Bulk Densities of Powders using a Graduated Cylinder | 04.09 |
| Other (6) | |||
| D3213 | 08 | Practices for Handling, Storing, and Preparing Soft Intact Marine Soil | 04.08 |
| D4612 | 08 | Practice for Calculating Thermal Diffusivity of Rocks | 04.08 |
| D5880 | 95(2006) | Guide for Subsurface Flow and Transport Modeling | 04.09 |
| D5924 | 96(2004) | Guide for Selection of Simulation Approaches in Geostatistical Site Investigations | 04.09 |
| D7351 | 07 | Test Method for Determination of Sediment Retention Device Effectiveness in Sheet Flow Applications | 04.09 |
| D7367 | 07 | Test Method for Determining Water Holding Capacity of Fiber Mulches for Hydraulic Planting | 04.09 |
ASTM International, Annual Book of ASTM Standards 2010, Volume 00.01, Subject Index and Alphanumeric List. Designations and titles are listed for reference; the standards themselves must be obtained from ASTM.