5.2.24 Particle-Size Analysis: Sieve and Hydrometer
The gradation curve classifies the soil (USCS, Section 2.2.4.2), checks filter and subballast criteria, and screens frost susceptibility and liquefaction. Sieves cover gravel and sand; the hydrometer test, which measures the density of a soil-water suspension as particles settle, extends the curve into the silt and clay sizes so that the clay fraction and activity can be found.
5.2.24.1 Method
Equation 5.2-7. Sieve analysis
Rn = Wn/W × 100; percent finer = 100 − ΣRn; Cu = D60/D10; Cc = D30²/(D10D60)
Wn = mass retained on sieve n; W = oven-dry specimen mass. Mass lost during sieving should be under 2%.
Equation 5.2-8. Hydrometer analysis (ASTM 152H)
Rcp = R + FT − Fz, FT = −4.85 + 0.25T; percent finer = aRcp/Ws × 100, a = 1.65Gs/[(Gs − 1)2.65]; L = 16.29 − 0.164(R + Fm) cm; D = A√(L/t), A = √[30η/((Gs − 1)γw)]
From Stokes’ law. Fz = zero correction; Fm = meniscus correction; T in °C (15 to 28); t in minutes; η = viscosity of water (g·s/cm²); D in mm.
5.2.24.2 Worked example
Example 5.2-6: Gradation of a Sand and of a Silty Clay
A 500-g sample of sand with some fines was sieved (Das, Table 4-2), and a 50-g sample of brown silty clay was tested with the 152H hydrometer at 28°C (Das, Table 5-4; Gs = 2.75, Fz = 7, Fm = 1).
Sieve analysis: mass retained on each sieve of the stack; a separate hydrometer test on the fines extends the curve below 0.075 mm.
Given
Variable
Value
Description
W
500 g
Sieve specimen
Retained
0, 40.2, 84.6, 50.2, 40.0, 106.4, 108.8, 59.4 g; pan 8.7 g
No. 4, 10, 20, 30, 40, 60, 140, 200
Hydrometer
R = 51 at 0.25 min … 27 at 2,880 min
Ws = 50 g, T = 28°C
Required
Sieve: percent finer, D10, D30, D60, Cu, Cc
Hydrometer: percent finer and particle size at each reading
Spot check: Das reads 0.46, 0.21 and 0.098 mm from the plotted curve.
↓
Step 4 · Coefficients
0.484/0.0945; 0.200²/(0.0945 × 0.484)
Cu = 5.1; Cc = 0.87: poorly graded sand
↓
Step 5 · First hydrometer reading
FT = −4.85 + 0.25(28) = 2.15; Rcp = 51 + 2.15 − 7 = 46.15; a = 0.978; L = 16.29 − 0.164(52) = 7.76 cm; A = 0.0121
Percent finer 90.3%; D = 0.0121√(7.76/0.25) = 0.068 mm
Spot check: Matches Das: 90.3% and 0.068 mm. The last reading gives 43.3% finer than 0.0008 mm.
↓
Solution
Sand: D60 0.48, D30 0.20, D10 0.095 mm, Cu 5.1, Cc 0.87 (SP); silty clay: about 54% finer than 0.002 mm.
Solution
The sand is poorly graded (SP) with only 2% fines; the silty clay has about 54% clay-size particles.
For railroad work the sand’s narrow gradation matters for filters and subballast (Section 2.4.19); the clay fraction of the silty clay, with its PI, gives the activity used to screen swell (Section 2.2.15).
Open the particle-size analysis calculator → Sieve reduction with the loss check, the 152H hydrometer reduction with all corrections, the combined gradation curve, D10, D30, D60, Cu, Cc and the gravel, sand, fines and clay fractions.
5.2.24.3 Sources
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.
B.M. Das, Soil Mechanics Laboratory Manual, 6th ed. (2002): Chapters 4 and 5, Tables 4-2 and 5-1 to 5-4.Find source ↗
ASTM D6913 (sieve analysis) and D7928 (hydrometer analysis; formerly D422, withdrawn 2016; use D6913/D6913M (sieve) and D7928 (hydrometer)).Official page ↗