5.2.0 Executive Summary

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.0 Executive Summary

Laboratory testing is the scientific foundation of every geotechnical design. Field observations classify soils and rock; laboratory tests quantify the engineering properties that drive bearing capacity, settlement, slope stability, and pavement design calculations. For railroad capital projects, the consequences of poorly selected or inadequately executed lab programs are magnified by the scale of the loading environment — 286,000-lb gross rail load, cyclic dynamic amplification, and serviceability tolerances measured in fractions of an inch.

This chapter defines the laboratory testing program for geotechnical investigations serving owner railroads. It covers test selection by project type, ASTM standards for every test method, sample handling and chain of custody, laboratory QA/QC, turnaround time expectations by client, and accreditation requirements. All test results are expressed in English units throughout. The consultant must confirm current ASTM edition requirements with each client's engineering standards before mobilizing a laboratory program — clients periodically update their referenced editions.

← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing