↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.19 Consolidated-Undrained Triaxial Tests: Pore Pressure, Stress Paths and Strength

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.19 Consolidated-Undrained Triaxial Tests: Pore Pressure, Stress Paths and Strength

Consolidated-undrained (CU) triaxial tests with pore pressure measurement are the workhorse strength test for clay foundations under embankments. One set of tests gives both the undrained strength for short-term stability and the effective stress parameters for long-term stability. Das's Principles of Geotechnical Engineering shows how to reduce the results. Each failure point is plotted as p = (σ1 + σ3)/2 against q = (σ1 − σ3)/2. A straight line through the points (the Kf line, q = m + p tan α) converts to the Mohr–Coulomb parameters through sin φ = tan α and c = m/cos φ. Skempton's pore pressure coefficient at failure, Af, shows whether the clay tends to contract or dilate when sheared. Budhu and Craig give the critical state view of the same tests. Das also gives Skempton's correlation between the field vane strength ratio and plasticity index, with an overconsolidation adjustment, as a check on the laboratory values.

5.2.19.1 Method

Equation 5.2-3. Kf line, Skempton's A and field vane estimate

q = m + p tan α;   sin φ = tan α;   c = m / cos φ  (total stresses for φcu, effective for φ′)

Af = (Δud)f / (Δσd)f
(cu(VST)/σ′0)NC = 0.11 + 0.0037PI;   (cu(VST)/σ′0)OC = (cu(VST)/σ′0)NC(OCR)0.8

Table 5.2-13. Verification against Das, Examples 12.6 to 12.8
QuantityDasCalculator
φcu, one specimen: σ3 = 12 psi, (Δσd)f = 9.1 psi, (Δud)f = 6.8 psi16°16.0°
φ′, same specimen27.8°27.8°
Drained deviator stress at σ′3 = 12 psi21 psi21.0 psi
Field vane strength, PI = 28, OCR = 3.2, σ′0 = 160 kPa (3,342 psf)86.7 kPa (1,811 psf)1,810 psf

5.2.19.2 Worked example

Three CU tests on a clay at cell pressures of 10, 20 and 30 psi give a best-fit Kf line of φ′ = 36.1° with c′ = 0.69 psi, and a total stress angle φcu = 20.5°. These are illustrative results, not data from a real site. The mean Af is 0.49. Use φ′ and c′ for long-term embankment stability, and the undrained strength ratio for the end of construction and for staged construction (Chapter 2.5). A field vane strength well below the laboratory value usually points to sample disturbance, not to weak clay; check it with Chapter 4.1.

Check saturation (Skempton's B-value) before shearing and report it with the results. If Af values scatter widely between specimens, the pore pressure measurements are suspect, and so is φ′.

Open the CU triaxial calculator →
Total and effective stress Kf lines from CU tests with pore pressure, Mohr-Coulomb parameters, Skempton's Af, the implied drained strength, and a field vane strength estimate from PI and OCR, with a p-q plot.

5.2.19.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • B.M. Das, Principles of Geotechnical Engineering, 7th edition: Chapter 12, CU tests, Examples 12.6 to 12.9, stress paths and the Kf line, and Skempton's vane strength relationFind source ↗
  • M. Budhu, Soil Mechanics and Foundations, 3rd edition: stress paths, pore pressure parameters and critical state interpretationFind source ↗
  • R.F. Craig, Craig's Soil Mechanics, 7th edition: triaxial testing and pore pressure coefficientsFind source ↗Library entry
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing