↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.27 Unconfined Compression Test Reduction

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.27 Unconfined Compression Test Reduction

The unconfined compression test is the quickest measure of the undrained strength of a clay sample: an unconfined cylinder is loaded axially until it fails or reaches 15 to 20% strain. It is the strength usually reported on boring logs of cohesive soil and used for quick undrained stability checks of embankments and cuts. Because there is no confinement, fissures and sample disturbance lower the result, so it is a lower bound to the in-situ strength.

5.2.27.1 Method

Equation 5.2-12. Stress, strength and modulus

ε = ΔL/L0;   Ac = A0/(1 − ε);   σ = P/Ac;   qu = σmax (or σ at 15–20% strain);   su = qu/2;   E50 = (qu/2)/ε50;   St = qu/qu,remolded

A0 = initial area; the area correction assumes the specimen bulges uniformly. ASTM D2166.

5.2.27.2 Worked example

Example 5.2-9: Unconfined Strength of a Light Brown Clay

A 1.43-in. by 3.0-in. specimen of light brown clay was tested in a frame with a proving ring of 0.264 lb per division (Das, Table 16-1).

P = dial × 0.264 lbL0 = 3.0 in.D = 1.43 in.GivenD = 1.43 in., L0 = 3.0 in.Ring factor 0.264 lb/div17 readings of ΔL and dialRequiredStress-strain curvequ, su = qu/2, E50
Unconfined compression: the specimen is loaded axially with no confining pressure; the cross-section grows as it shortens, so each stress uses the corrected area.

Given

VariableValueDescription
D, L01.43 in.; 3.0 in.A0 = 1.606 in.²
Ring factor0.264 lb/div
ReadingsΔL 0 to 0.36 in.; dial 0 to 86 div17 readings

Required

  • Stress-strain curve and qu
  • su, E50 and consistency

Equations

  1. Eq. 5.2-12: ε = ΔL/L0; Ac = A0/(1 − ε)
  2. Eq. 5.2-12: σ = P/Ac; qu = σmax
  3. Eq. 5.2-12: su = qu/2; E50

Steps

Step 1 · Peak reading
ΔL = 0.18 in.: ε = 0.06; P = 86 × 0.264 = 22.70 lb; Ac = 1.606/0.94 = 1.708 in.²
σ = 13.29 psi
↓
Step 2 · Strength
qu = 13.29 psi; su = 6.64 psi
su = 957 psf: medium stiff
Spot check: Das: qu = 13.288 psi at 6% strain.
↓
Step 3 · Modulus
Half of qu = 6.64 psi reached at ε50 = 0.73%
E50 ≈ 910 psi (131 ksf), E50/su ≈ 140
↓
Solution
qu = 13.3 psi; su ≈ 960 psf; E50 ≈ 910 psi.

Solution

The clay has an unconfined strength of 13.3 psi, so su ≈ 960 psf (medium stiff).

Before using it for a slope or bearing check, compare with pocket penetrometer and vane readings on the same sample; if the clay is fissured or the sample was disturbed, the field strength may be noticeably higher, and a UU triaxial test is the better design value.

Open the unconfined compression calculator →
Strain, area-corrected stress and the stress-strain curve from raw dial readings; qu, su, strain at failure, E50, consistency and sensitivity.

5.2.27.3 Sources

Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.

← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing