↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.2 Test Program Design by Project Type

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.2 Test Program Design by Project Type
Table 5.2-1. Laboratory Testing Matrix by Railroad Project Type
TestSiding/Track Ext.Intermodal YardBridge/CulvertMainline RehabEmergency
Moisture content (D2216)All samplesAll samplesAll samplesAll samplesAll samples
Atterberg limits (D4318)Fine-grainedFine-grainedFine-grainedFine-grainedFine-grained
Grain size (D6913/D7928)SelectSelectSelectSelectPriority
Specific gravity (D854)Consolidation setAll triaxial setAll triaxial setConsolidation setPriority
Standard Proctor (D698)Structure backfillAs neededStructure backfillAs neededNot typically
Modified Proctor (D1557)EmbankmentYesEmbankmentYesNot typically
CBR (D1883)SubgradePavement designNot typicallySubgrade rehabNot typically
Resilient Modulus (T307)SubgradePavement designNot typicallySubgrade rehabNot typically
Consolidation (D2435)Soft claySoft claySoft claySoft clayNot typically
UU Triaxial (D2850)Not typicallySlope stabilitySlope stabilitySlope stabilityQuick stability
CU Triaxial (D4767)Not typicallyCritical slopesCritical slopesCritical slopesNot typically
Direct shear (D3080)Not typicallyResidual φ'Rock jointsResidual φ'Not typically
Unconfined compression (D2166)Not typicallySelectSelectSelectQuick s_u
Permeability (D2434/D5084)Drainage designDrainage designDrainage designDrainage designNot typically
Point load index (D5731)Rock cutsRock cutsRock cutsRock cutsNot typically
Sodium sulfate soundnessBallastBallastNot typicallyBallast rehabNot typically
LA Abrasion (C131)BallastBallastNot typicallyBallast rehabNot typically
Rock Tests
Rock Tests

Ballast, subballast and fouling test suite

For ballast-source qualification, ballast condition surveys and subballast design, add the following to the soil program:

Tests for Soil
Tests for Soil
  • Ballast source: petrographic analysis; LA Abrasion; Mill Abrasion (wet) and the Abrasion Number, AN = LAA + 5 MA; wet attrition (Deval) for soft stone in wet track; clay lumps and friable particles (ASTM C142); flat and elongated particles; specific gravity and absorption.
  • Fouled ballast: trench samples taken by zone (crib, shoulder, top, bottom). Report the fraction finer than 3/8 in. as fouling material and the fraction finer than No. 200 as fines. Compute the fouling index, and identify the source of the fines by color, plasticity and, where it matters, SEM or XRD mineralogy.
  • Subballast: gradation for the filter checks against both ballast and subgrade; LA Abrasion ≤ 50; LL and PI on the minus-No. 40 fraction (≤ 25 and ≤ 6).

After Selig & Waters (1994), chs. 7, 8 and 9. Full reference under Supplemental References.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • RK-10 UCS from point load index σ꜀Use: Hard, isotropic rock; quick strength index in field. Limits: K varies widely with rock type and anisotropy; calibrate with lab UCS. Unreliable in weak rock (σc < ~3,600 psi).
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing