Almost every laboratory and field result is reported through the weight-volume (phase) relationships of soil: a moisture content and a unit weight from a tube sample give the void ratio for a settlement calculation; a field density test gives the dry unit weight for a compaction check; an assumed porosity gives the saturated and buoyant weights for a slope or a retaining wall. The relationships are simple, but they are easy to mix up, and an inconsistent set (degree of saturation over 100%, for example) is a common sign of a wrong specific gravity or a bad density test.
Equation 5.2-5. Phase relationships
Vv = volume of voids (air plus water); Vs = volume of solids; S = degree of saturation; Gs = specific gravity of solids (ASTM D854); γw = 62.4 pcf; ic = critical hydraulic gradient for a quick condition under upward flow.
A specimen trimmed from a tube sample of embankment fill is weighed, oven-dried and weighed again. Its bulk specific gravity was measured by immersion. The numbers are those of the soil composition example in Hicks (2000).
| Variable | Value | Description |
|---|---|---|
| W | 122 g | Moist weight |
| Ws | 104 g | Oven-dry weight |
| Gm | 1.82 | Bulk specific gravity of the moist mass |
| Gs | 2.53 | Specific gravity of solids |
The sample has a void ratio of 0.631 at 17.3% water content and 69% saturation, and a dry unit weight of 96.8 pcf.
A Gs of 2.53 is low for mineral soil and suggests some organic matter or light particles (for example cinders in an old track fill). If Gs is assumed rather than measured, check it: with 2.70 the same weights give e = 0.74 and S = 63%, a material difference for settlement estimates.
Open the phase relationships calculator →
Void ratio, porosity, water content, saturation and unit weights from a lab specimen, from field unit weight and water content, or from void ratio, with the critical gradient and a seepage check.
The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.