↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.28 Direct Shear Test Reduction

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.28 Direct Shear Test Reduction

The direct shear box is the common test for the friction angle of sands, ballast fines, subballast and drained clays (at slow rates). The upper half of the box is displaced across the lower half under a fixed normal load while the shear force and the change in height are recorded. Dense sands reach a peak and then soften toward an ultimate value as they dilate; loose sands contract and show no clear peak. Section 5.2.17 (Shear Strength from Lab Tests) fits envelopes to already-reduced results; this section reduces the raw readings.

5.2.28.1 Method

Equation 5.2-13. Direct shear reduction

τ = S/A = (dial × ring factor)/A;   σ = N/A;   Clean sand: tanφ = τpeak/σ;   Several tests: τ = c + σ tanφ (least squares)

A = box area; N = normal load; S = shear force. ASTM D3080: for clays, shear slowly enough for drainage.

5.2.28.2 Worked example

Example 5.2-10: Friction Angle of a Uniform Sand

A 2-in. square specimen of uniform sand at e = 0.596 was sheared under a normal load of 56 lb (Das, Tables 15-1 and 15-2).

N = 56 lbS = dial × 0.31 lbBox 2 in. × 2 in.; shear plane between halvesGivenBox 2 × 2 in.; N = 56 lbRing factor 0.31 lb/div13 readings to 0.12 in.RequiredPeak and ultimate τφ peak and φ ultimate
Direct shear: the upper half of the box is pushed across the lower half under a constant normal load; the proving ring measures the shear force.

Given

VariableValueDescription
Box2 in. × 2 in.A = 4.0 in.²
N56 lbσ = 14 psi
Ring factor0.31 lb/div
ReadingsDial 45 to 129 to 105 div over 0.12 in.Vertical +0.001 to +0.010 in.

Required

  • Peak and ultimate shear stress
  • Peak and ultimate friction angle

Equations

  1. Eq. 5.2-13: τ = dial × 0.31/4.0
  2. Eq. 5.2-13: tanφ = τ/σ — c = 0

Steps

Step 1 · Normal stress
56/4.0
σ = 14.0 psi
↓
Step 2 · Peak
Dial 129 at 0.06 in.: 129 × 0.31/4.0
τpeak = 10.0 psi
↓
Step 3 · Peak angle
atan(10.0/14.0)
φpeak = 35.5°
Spot check: Das plots the same envelope: s = σ tan 35.5°.
↓
Step 4 · Ultimate
Dial 105 at 0.12 in.: 105 × 0.31/4.0 = 8.14 psi; atan(8.14/14.0)
φult ≈ 30°
Spot check: The specimen expanded 0.010 in. before the peak: a dense, dilating sand.
↓
Solution
φpeak = 35.5°; ultimate about 30°.

Solution

The sand has a peak friction angle of 35.5°, softening to about 30° at large displacement.

For slopes and walls where the sand may already have moved (old slides, reworked fill), use the lower, ultimate value. Run at least three normal stresses spanning the field range before relying on the envelope; one test assumes c = 0.

Open the direct shear calculator →
Raw proving-ring readings for any number of tests reduced to stress-displacement curves, peak and ultimate stress and dilation, and the peak and ultimate envelopes.

5.2.28.3 Sources

Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.

← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing