The specific gravity of the solids, Gs, ties together every weight-volume calculation (Section 5.2.21), the hydrometer analysis and the zero-air-voids curve. Most mineral soils fall between 2.65 and 2.75; a lower value warns of organic matter, cinders or other light particles, which are common in old railroad fills. The pycnometer test is simple, but entrapped air and temperature differences are its main sources of error.
Equation 5.2-6. Specific gravity by pycnometer
W1 = flask filled with water to the mark at T; W2 = flask with soil and water filled to the mark; Ws = oven-dry soil. A ranges from 1.0007 at 16°C to 0.9974 at 30°C. ASTM D854.
Three pycnometer trials on a light brown sandy silt were run at 23°C (Das, Table 3-3). The scanned table prints W2 for the first flask as 722.0 g; the water mass of 37.0 g printed in the same column requires 728.0 g, which is used here.
| Variable | Value | Description |
|---|---|---|
| W1 | 666.0, 674.0, 652.0 g | Flask + water to the mark |
| W2 | 728.0, 738.3, 709.93 g | Flask + soil + water |
| Ws | 99.0, 103.0, 92.0 g | Oven-dry soil |
| T | 23°C | A = 0.9993 |
The specific gravity of the solids is 2.68, typical of quartz-rich silt and sand.
Use the measured value rather than an assumed 2.65 or 2.70 in the phase relationships and the hydrometer analysis; a 0.05 error in Gs shifts a computed void ratio by about 3%.
Open the specific gravity calculator →
Pycnometer reduction for any number of trials, the temperature correction to 20 °C, the average and the spread check.
Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.