Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S8 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual.
- U.S. Army Corps of Engineers (1970, with changes through 1986). Calibration of Laboratory Soils Testing Equipment. EM 1110-2-1909Find source ↗Library entry
- U.S. Army Corps of Engineers (1970, with changes). Laboratory Soils Testing. EM 1110-2-1906Find source ↗Library entry
- Das, B. M. (2002). Soil Mechanics Laboratory Manual, 6th ed. Oxford University PressFind source ↗
- Nagaraj, T. S. (1993). Principles of Testing Soils, Rocks and Concrete. Elsevier (Developments in Geotechnical Engineering)Find source ↗
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 3, 7, 8, 9 and 10Find source ↗Library entry
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §5.8, §7.9Find source ↗Library entry
- Conklin, A. R., Jr. (2014). Introduction to Soil Chemistry: Analysis and Instrumentation, 2nd ed. Hoboken, NJ: John Wiley & Sons. Used on this page: Section 5.2.30Find source ↗