Empirical Equations — Use and Limitations

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
RK-10UCS from point load indexσ꜀
IX-01Compression index from liquid limit (undisturbed)C꜀
IX-02Compression index from liquid limit (remolded)C꜀
IX-03Compression index from void ratioC꜀
IX-04Compression index from plasticity indexC꜀
IX-05Secondary compression ratioC_α
IX-06Normalized undrained strength from plasticitySᵤ/σ'
IX-08Friction angle of NC clay from plasticityφ'
IX-10Undrained strength from liquidity indexSᵤ (remolded)
IX-11Hazen hydraulic conductivityk
IX-13Small-strain shear modulus (Hardin)G_max