Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
- USACE EM 1110-2-1906, Laboratory Soils TestingOfficial page ↗Library entry
- USACE EM 1110-2-1909, Calibration of Laboratory Soils Testing EquipmentOfficial page ↗Library entry
- Das, B. M. (2002). Soil Mechanics Laboratory Manual, 6th ed.Find source ↗
- ASTM D854, D1557, D1587 (withdrawn 2024), D1883, D2166, D2216, D2434, D2435, D2850, D3080, D4318, D4644 (withdrawn 2025), D4767, D5084, D5731 (withdrawn 2025), D6913, D698, D7928; AASHTO T 307Official page ↗Library entry
Supplemental references
File locations for these documents are listed under Supplemental References.