An oedometer test on a tube sample from 18 to 20 ft under a bridge approach embankment on a Class I railroad located in Georgia. Three numbers come out of the e-log σ′ curve: the preconsolidation stress, the compression index above it and the recompression index below it. Together with the present effective stress they say which settlement equation of Chapter 6.2 applies.
| Variable | Value | Description |
|---|---|---|
| Data | σ′ = 0.125, 0.25, 0.5, 1, 2, 4, 8, 16 tsf; e = 1.820, 1.795, 1.762, 1.698, 1.590, 1.430, 1.235, 1.015 | End of each load stage |
| σ′p | 1.50 tsf | Casagrande construction (maximum curvature near 1.0 to 1.5 tsf) |
| γsat | 115 pcf | Water table at the surface |
| z | 19 ft | Sample depth |
Cc = 0.590, Cr = 0.135, σ′p = 1.50 tsf and OCR = 3.0: a moderately overconsolidated clay.
Use the overconsolidated settlement equations of Chapter 6.2: recompression only while the final stress stays below 1.50 tsf, and recompression plus virgin compression if the embankment pushes it past. Report all four values in the engineering properties table of the geotechnical report. Cc is taken from the straight part of the curve well above σ′p, not from the bend.
Subgrade for an intermodal yard expansion on a Class I railroad located in Kansas City. The Proctor test sets the compaction reference; the CBR is run on a specimen compacted to the specified fraction of it and soaked, which is the condition the subgrade will be in after a wet season.
| Variable | Value | Description |
|---|---|---|
| Proctor points | w = 10.5, 12, 14, 16, 18%; γd = 111.8, 115.4, 118.2, 117.1, 113.5 pcf | Modified Proctor |
| RC | 95% (assumed) | Specimen compaction |
| Loads | 730 lb at 0.1 in.; 960 lb at 0.2 in. | Soaked CBR |
| Standard loads | 3,000 lb at 0.1 in.; 4,500 lb at 0.2 in. | ASTM D1883 |
| Requirement | CBR ≥ 20% (assumed) | Subgrade or blanket |
γd,max = 118.2 pcf at 14.0%; design CBR = 24.3%, just above the assumed 20% requirement.
A soaked CBR of 24% is high for a lean clay, which commonly tests between 3 and 15%. Before the value is used, check the specimen’s classification, compaction and soak record, and run at least three more tests across the yard footprint. If the result is confirmed, the subgrade is marginally adequate; if not, plan for a blanket layer or treatment (Chapter 7.3).
A cut slope in residual silty clay on a Class I railroad located in Appalachia. Three CU specimens with pore pressure measurement give the effective strength parameters for long-term (drained) slope stability. The p′-q′ plot turns three Mohr circles into a straight line, whose slope and intercept give φ′ and c′.
| Variable | Value | Description |
|---|---|---|
| σ3 | 1,000; 2,000; 3,000 psf | Cell pressures, specimens A to C |
| Δuf | 400; 710; 1,050 psf | Pore pressure at failure |
| q | 820; 1,540; 2,290 psf | (σ1 − σ3)/2 at failure |
φ′ ≈ 31° and c′ ≈ 90 psf.
These are for long-term (drained) stability. Small cohesion intercepts from three points are uncertain; for a cut slope with a factor of safety near 1.3, test at least two more specimens and consider checking the slope with c′ = 0, because weathering of a residual soil in the cut face destroys cohesion first.