↑ Parent Menu⌂ Main Menu
← Chapter 5.2 Laboratory Testing Program
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.2.25 Atterberg Limits: Data Reduction

Laboratory testing is the scientific foundation of every geotechnical design.
Authors: Daniel P. Colwell and Mario Ruel
5.2.25 Atterberg Limits: Data Reduction

The liquid and plastic limits place a fine-grained soil on the plasticity chart, correlate with compressibility and strength, and, with the natural water content, show whether a clay is near its liquid limit (sensitive, likely to flow) or below its plastic limit (stiff or desiccated). The shrinkage limit adds a measure of how much the soil will shrink as it dries, which matters for embankment cracking and track geometry on expansive clay.

5.2.25.1 Method

Equation 5.2-9. Liquid limit

Multipoint: w = a − FI log N, LL = w at N = 25;   One-point: LL = wN(N/25)0.121;   Fall cone: LL = w at 20 mm penetration (80 g, 30° cone)

FI = flow index; N = blows to close the groove 1/2 in. The one-point method applies for N = 20 to 30. The cone method (Nagaraj, 1993) is less operator-dependent and agrees with the cup below LL ≈ 100%.

Equation 5.2-10. Plastic and shrinkage limits and indices

PI = LL − PL;   LI = (wn − PL)/PI;   A = PI/(% < 0.002 mm);   SL = wi − (Vi − Vf)ρw/Wdry × 100

A-line: PI = 0.73(LL − 20). Vi, Vf = volume of the wet and dry pat (mercury mass/13.6, or wax method ASTM D4943).

Table 5.2-16. Reading the indices
IndexRangeMeaning
Liquidity index LI> 1Water content above LL: sensitive, flows when remolded
0 to 1Plastic range
< 0Below PL: stiff, often desiccated or overconsolidated
Activity A< 0.75Inactive (kaolinite)
0.75 to 1.25Normal (illite)
> 1.25Active (smectite): swell likely

5.2.25.2 Worked example

Example 5.2-7: Limits of a Gravelly Silty Clay

Three cup trials, a plastic limit trial and a shrinkage limit pat were run on samples from the Das laboratory manual (Tables 6-1, 7-1 and 8-1).

Casagrande cup: groove closes 1/2 in. after N blows1/8-in. thread (PL)N = 35, 23, 17Given3 LL trials: can masses and N1 PL trialShrinkage pat: Vi 14.62, Vf 11.05 cm³RequiredLL, PL, PIPlasticity chart symbolShrinkage limit
Liquid limit by the flow curve from three cup trials, plastic limit by rolling threads, and shrinkage limit from the volume of a dried pat.

Given

VariableValueDescription
LL trialscans 15.26/29.30/25.84 g at N = 35; 17.01/31.58/27.72 g at N = 23; 15.17/31.45/26.96 g at N = 17can, can + wet, can + dry
PL trial13.33/23.86/22.27 g
SL patdish 12.34 g; + wet 40.43 g; + dry 33.68 g; Vi = 14.62, Vf = 11.05 cm³Mercury 198.83 g and 150.30 g /13.6

Required

  • LL, PL, PI and the plasticity chart symbol
  • Shrinkage limit

Equations

  1. Eq. 5.2-9: w = (W2 − W3)/(W3 − W1) × 100; flow curve at N = 25
  2. Eq. 5.2-10: PI = LL − PL; A-line
  3. Eq. 5.2-10: SL = wi − (Vi − Vf)/Wdry × 100

Steps

Step 1 · Water contents
3.46/10.58; 3.86/10.71; 4.49/11.79
32.70%, 36.04%, 38.08%
↓
Step 2 · Flow curve
Least-squares fit of w on log N
FI = 17.2; LL = 35.3%
Spot check: Das reports LL ≈ 35.2% from the plotted line.
↓
Step 3 · Plastic limit
1.59/8.94
PL = 17.8%
↓
Step 4 · PI and chart
35.3 − 17.8; A-line 0.73(35.3 − 20) = 11.2
PI = 17.5, above the A-line: CL
↓
Step 5 · Shrinkage limit
wi = 6.75/21.34 = 31.63%; Δw = 3.57/21.34 = 16.73%
SL = 14.9%
Spot check: Das: 31.63%, 16.72% and 14.91%.
↓
Solution
LL = 35.3%, PL = 17.8%, PI = 17.5% (CL); SL = 14.9%.

Solution

The fines are a lean clay (CL) with LL 35, PI 17.5 and a shrinkage limit of about 15%.

LL/SL = 2.4, a moderate shrinkage potential: fills of this clay will crack when they dry below about 15% water content, opening paths for rain into the embankment.

Open the Atterberg limits calculator →
Liquid limit by multipoint flow curve, one-point method or fall cone; plastic limit; shrinkage limit and ratio; PI, LI, activity, toughness index and the plasticity chart.

5.2.25.3 Sources

Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.

  • B.M. Das, Soil Mechanics Laboratory Manual, 6th ed. (2002): Chapters 6 to 8, Tables 6-1, 7-1 and 8-1.Find source ↗
  • T.S. Nagaraj, Principles of Testing Soils, Rocks and Concrete, Elsevier (1993): Chapter 9, cone penetration and one-point liquid limit methods.Find source ↗
  • ASTM D4318, Liquid Limit, Plastic Limit and Plasticity Index of Soils.Official page ↗Library entry
← Previous · 5.0 Testing Chapter 5.1 — In Situ Testing
Next · 5.0 Testing → Chapter 5.3 — Construction Monitoring and Field Testing